Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085L116 + (08:11:51, 14 December 2024)
- ML20085L112 + (08:11:52, 14 December 2024)
- ML20085L114 + (08:11:52, 14 December 2024)
- ML20085L110 + (08:11:53, 14 December 2024)
- ML20085L102 + (08:11:54, 14 December 2024)
- ML20085L098 + (08:11:54, 14 December 2024)
- ML20085L091 + (08:11:55, 14 December 2024)
- ML20085L088 + (08:11:55, 14 December 2024)
- ML20085L078 + (08:11:56, 14 December 2024)
- ML20085L073 + (08:11:57, 14 December 2024)
- RC-95-0157, Advises That SA Byrne Now General Manager,Nuclear Plant Operations,Effective 950605.NRC Distribution Re Orignial Documents Should Be Updated Accordingly + (08:11:57, 14 December 2024)
- ML20085L065 + (08:11:58, 14 December 2024)
- ML20085L070 + (08:11:58, 14 December 2024)
- BVY-91-108, Responds to Weaknesses/Concerns Noted in Team Insp Rept 50-271/91-80 Re Proposed motor-operated Valve Program,Per Generic Ltr 89-10.Corrective action:motor-operated Valve Program Will Be Revised by 920601 to Address Generic Ltr + (08:11:59, 14 December 2024)
- RBG-16-157, Interim Deficiency Rept DR-103.Investigation Ongoing.Interim or Final Rept Will Be Provided by 831129 + (08:12:00, 14 December 2024)
- ML20085L055 + (08:12:00, 14 December 2024)
- ML20085L050 + (08:12:01, 14 December 2024)
- ML20085L049 + (08:12:02, 14 December 2024)
- 05000416/LER-1995-004, :on 950316,reactor Scram Occurred During Performance of Semiannual Surveillance on Neutron Monitoring Sys.Caused by Ground Fault on Min Flow Valve for Rcics. Ground Eliminated & Valve Returned to Svc + (08:12:03, 14 December 2024)
- ML20085L046 + (08:12:04, 14 December 2024)
- ML20085L041 + (08:12:05, 14 December 2024)
- ML20085L039 + (08:12:06, 14 December 2024)
- RC-95-0145, Application for Amend to License NPF-12.Amend Would Revise SR 4.6.1.2 to Delete Schedular Requirements for Type a Testing + (08:12:06, 14 December 2024)
- ML20085L031 + (08:12:07, 14 December 2024)
- ML20085L032 + (08:12:07, 14 December 2024)
- ML20085L025 + (08:12:08, 14 December 2024)
- ML20085L023 + (08:12:09, 14 December 2024)
- ML20085L021 + (08:12:09, 14 December 2024)
- ML20085L011 + (08:12:10, 14 December 2024)
- ML20085L020 + (08:12:10, 14 December 2024)
- ML20085L007 + (08:12:11, 14 December 2024)
- ML20085L010 + (08:12:11, 14 December 2024)
- ML20085L006 + (08:12:12, 14 December 2024)
- ML20085L003 + (08:12:13, 14 December 2024)
- ML20085K997 + (08:12:13, 14 December 2024)
- ML20085K993 + (08:12:14, 14 December 2024)
- ML20085K992 + (08:12:15, 14 December 2024)
- ML20085K985 + (08:12:15, 14 December 2024)
- 05000354/LER-1995-006, :on 950323,480 Volt Normal Infeed Breaker Did Not Close During Attempted Transfer.Caused by Procedural non-compliances/personnel Error.Personnel Will Be Disciplined + (08:12:17, 14 December 2024)
- ML20085K977 + (08:12:19, 14 December 2024)
- ML20085K979 + (08:12:19, 14 December 2024)
- ML20085K974 + (08:12:20, 14 December 2024)
- NRC-91-0128, Forwards Response to Generic Ltr 91-06, Resolution of Generic Issue A-30, Adequacy of Safety-Related DC Power Supplies + (08:12:21, 14 December 2024)
- ML20085K967 + (08:12:24, 14 December 2024)
- ML20085K971 + (08:12:24, 14 December 2024)
- ML20085K965 + (08:12:25, 14 December 2024)
- 05000259/LER-1983-052-03, /03L-0:on 830912,while Performing Surveillance Instruction 4.11.C.3 & 4 on Reactor Bldg Elevation 593 Fixed Spray Zone 1E Heat Detector Relay Discovered Inoperable. Caused by Random Failure.Relay Replaced + (08:12:27, 14 December 2024)
- ML20085K957 + (08:12:28, 14 December 2024)
- ML20085K958 + (08:12:28, 14 December 2024)
- ML20085K954 + (08:12:29, 14 December 2024)
- ML20085K952 + (08:12:29, 14 December 2024)