ML20085L102

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Millstone Unit 2,Cycle 11 Core Operating Limits Rept
ML20085L102
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/23/1991
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20085L105 List:
References
MP-91-837, NUDOCS 9111010218
Download: ML20085L102 (1)


Text

_ _ _ _

, NORTHEAST UTIUTMS *** *' o"k ** San s" **u*' an c='= om 9 N.N'eY. NiiN ddE (( P O DOM 270

-g ' $Nas't ((t5t!.'e'[NEINvaw

' e a t. H AnironD. CONNECitCUT 06141 0270

. .. #w.., t e gr cmpan*

(203)665-5000 Docket No. 50-336 Ect oler 23, 1991 MP-91-837

- U.S. Nucicar Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

hiillstone Nuclear 1%wer Station, Unit No. 2 Core Opnatingl.imits.Repett _Enislun 3 -

The hlillstone Unit No. 2 Core Operating 1 imits Report (COLR) has been revised to change the Power Dependent CEA Insertion Limi's (I'l)lL)in order to alleviate operating restrictions which were imposed at the beginviing of the current operating evele. Due to high measured Total integrated Radial l'eaking Factor (17,1) values at the beginning of the current operating cycle, the l'DIL was sestricted to permit an increase in the allow-able F,1 limits.(" Analyses have been completed which permit operation using both the increased F,1 limits and the less testrictive PDil.

In accordance with the hiillstone Unit No. 2 Technical Specifications, Section 6.9.1.7.d.

NNECo hereby submits Revision 3 to the h!illstone Unit No. 2 COLR.

Very truly yours, NORTilEAST NUCLEAR ENERGY COhlPANY hPb ace

' Stephed E. Scace Director, hlillstone Station ec: T/l. h1artin, Ref ion i Administrator G.S. Vissing, NRC Project hianager, hiillstone Jnit No. 2 P. liabighorst, Itesident inspector, hiilistone Unit No. 2 WJ. Raymond, Senior Resident inspector, blillstone Unit Nos.1, 2, and 3 th S.E. Scace letter to U.S. Nuclear Reculatory Commission, "Niillstone Nuclear A  !

Power Station, Unit No. 2 Core Operating Limits Report - Revision 1", dated December 5,1990 M

I a ~r 9111010218 911023 \ I l