ML20085K952
| ML20085K952 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 09/28/1983 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20085K955 | List: |
| References | |
| GO1-83-0466, GO1-83-466, NUDOCS 8310210224 | |
| Download: ML20085K952 (1) | |
Text
,_
g
~
J
_ j Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-go00 -
Docket No. 50-460
~
September 28, 1983 G01-83-0466 I
_4 Director of Nuclear Reactor Regulation '
Attention: Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
NUCLEAR PROJECT NO. 1 CONTAINMENT STRUCTURAL INTEGRITY TEST As required by Regulatory Guide 1.70, Section 3.8.1.7, the Supply System hereby submits copies of the report on the WNP-1 Containment Structural Integrity Test.
This test was performed in accordance with the requirements of Regula-tory Guide 1.136, Rev. 2 and Article CC-6000 of ASME Section III, Division 2.
The report concludes that the WNP-1 Containment responded -
satisfactorily to the test pressure loads, provided test' results which correlate satisfactorily with the predicted response and satisfies the' acceptance criteria of ASME III, Division 2, Subarticle CC-6213.
Enclosed are eight copies of the report.
If additional copies are required, please contact A.G. Hosler, (509) 377-2822.
G. C. Sorensen, Acting Manager, Nuclear Safety & Regulatory Programs- (340)
GCS:AGH:pp cc: HW Kwan, UE&C, PA (8U6) w/o NS Reynolds, D&L w/o MC Thadani, NRC, MD-ll6 w/a j
ORM 847 FDCC 899 6..
8310210224 830928 PDR ADOCK 05000460 A
,