ML20085K979
ML20085K979 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 06/15/1995 |
From: | Marsh L Office of Nuclear Reactor Regulation |
To: | |
Shared Package | |
ML20085K981 | List: |
References | |
NUDOCS 9506280215 | |
Download: ML20085K979 (3) | |
Similar Documents at Pilgrim | |
---|---|
Category:OPERATING LICENSES & AMENDMENTS
MONTHYEARML20216G5871999-09-24024 September 1999
[Table view]Corrected Page 1 to Amend 182 to License DPR-35,reflecting New Licensee,Entergy ML20209G3781999-07-15015 July 1999 Amend 182 to License DPR-35,modifying TS Table 4.6-3, Reactor Vessel Material Surveillance Program Withdrawal Schedule ML20198H5591998-12-21021 December 1998 Amend 180 to License DPR-35,authorizing Boston Edison Co to Change Updated FSAR Section 10.7, Salt Service Water System, to Address Single Failure Vulnerability ML20198A2321998-12-11011 December 1998 Amend 179 to License DPR-35,revising TSs 3/4.5.F.1, Core & Containment Cooling Sys, to Extend Allowed Outage Time for Emergency Diesels ML20195B8931998-11-10010 November 1998 Amend 178 to License DPR-35,modifying Various Pilgrim Nuclear Power Station TS Pages to Correct Typographical Errors,Remove Inadvertent Replication of Info & Update Various Bases Sections ML20236X4631998-07-31031 July 1998 Amend 177 to License DPR-35,relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Offsite Dose Calculation Manual,Iaw Recommendations of GL 89-01 ML20236U9731998-07-28028 July 1998 Amend 176 to License DPR-35,changing Plant TS 3/4.5.B Bases to Incorporate Ultimate Heat Sink Temp to 75 F as Required by Amend 173 ML20249B8311998-06-19019 June 1998 Amend 175 to License DPR-35,modifying Plant TS Section 3.6.A.4 W/Respect to Monitoring Requirements for Vessel Flange & Adjacent Shell Differential Temp During Heatup & Cooldown ML20198R7041997-10-30030 October 1997 Amend 174 to License DPR-35,adding Footnote to TS 3.7.A.5, Primary Containment. Footnote Provides one-time Exception to Reverse Flow Testing Requirement for Containment Isolation Check Valve 30-CK-432 ML20148U6401997-07-0303 July 1997 Amend 173 to License DPR-35,evaluating Unreviewed USQ Associated W/Operation of Plant to Credit Use of Containment Overpressure to Suppl NPSH for Emergency Core Cooling Pumps & Increase Accident Analysis Design UHS Temp ML20140B0201997-05-28028 May 1997 Amend 172 to License DPR-35,revising TSs Definition 1.M, Primary Containment Integrity, Note 6 on Table 3.2.A for High Flow Main Steam Line Instrumentation & Table 3.2.D for Typo ML20137R8051997-04-0707 April 1997 Amend 171 to License DPR-35,revises TS Safety Limit 2.1.2, Minimum Critical Power Ratio & Associated Bases Section & Note 5 to Table 3.2.C.1, Instrumentation That Initiates Rod Blocks ML20147D8731997-02-10010 February 1997 Amend 170 to License DPR-35,revising Definition of operable- Operability,Tss & Associated Bases Section for TSs 3.9.B.2 & 3.9.B.3 ML20134L6931996-11-12012 November 1996 Amend 168 to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6, TS 6.5.B.8 ML20128N8561996-10-0404 October 1996 Amend 167 to License DPR-35,changing TSs to Implement 10CFR50,App J,Option B ML20116L3141996-08-12012 August 1996 Amend 166 to License DPR-35,modifying Definition of Core Alteration & Limiting Condition for Operation,Surveillance Conditions & Bases Section Associated W/Ts 3.7.C ML20096H2691996-01-23023 January 1996 Amend 165 to License DPR-35,revising TS to Convert Current percentage-based Scram Time Limits to notch-based Limits in TS 3.3.C & Updating Bases for notch-based Limits in TS 3/4.3.C ML20092C5711995-09-11011 September 1995 Corrected Tech Spec Page to Amend 164 to License DPR-35, Changing Control Value for Reactor High Pressure Trip Level Setting 76 Psig ML20086A1551995-06-22022 June 1995 Corrected TS Pages of Amend 164 to License DPR-35 for Plant ML20085K9791995-06-15015 June 1995 Amend 164 to License DPR-35,revises Reactor High Water Level Trip Level Setting for Group 1 Isolation ML20081L8891995-03-27027 March 1995 Amend 162 to License DPR-35,reducing Reactor Pressure Setpoint at Which Shutdown Cooling Sys Automatically Isolates ML20081H8941995-03-22022 March 1995 Amend 161 to License DPR-35,re Changes to Listed TS & Addition of Sections 3.7.B.1.f & 3.7.B.2.e to Require That Both Trains of Standby Gas Treatment & CR Air Filtration Sys Operable ML20081J0321995-03-22022 March 1995 Amend 160 to License DPR-35 Re Changes to TS to Revise Allowable Leak Rate MSIVs ML20080T7161995-03-0808 March 1995 Amend 159 to License DPR-35,removing TS Requirement, Instrumentation That Initiates Control Rod Blocks to Have Scram Discharge Instrument Volume-Scram Trip Bypassed Operable in Run & Startup Modes ML20080J7201995-02-16016 February 1995 Amend 158 to License DPR-35,relocating Alarms for Drywell to Suppression Chamber Vacuum Breaker to Different Annunciator Panel ML20078Q3281995-02-0202 February 1995 Amend 157 to License DPR-35,removing TS Section 4.5.H.4 Which Requires Testing & Calibration of Pressure Switches in Certain ECCS Lines ML20072H9641994-08-22022 August 1994 Amend 156 to License DPR-35,increasing Allowed out-of-svc Time from 7 Days to 14 Days for Ads,Hpcis & Rcics ML20070A1321994-06-22022 June 1994 Amend 155 to License DPR-35,increases Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changes Max Loads Allowed to Travel Over Spent Fuel Assemblies from 1,000 to 2,000 Lbs ML20070B3361994-06-21021 June 1994 Amend 154 to License DPR-35,removing Scram & Group I Isolation Valve Closure Functions Associated W/Main Steamline Radiation Monitors ML20029E6811994-05-16016 May 1994 Amend 153 to License DPR-35 Changing TS by Revising Wording for License ML20065R4451994-05-0505 May 1994 Amend 152 to License DPR-35,removing Low Condenser Vacuum Scram & Reducing Turbine First Stage Setpoint to Bypass Turbine Control Valve Fast Closure & Turbine Stop Valve Closure Trip Signals ML20065H4371994-04-0606 April 1994 Amend 151 to License DPR-35,changing TS to Support 24-month Fuel Cycle ML20059J1651993-11-0404 November 1993 Corrected Amend 149 to License DPR-35,correcting Administrative Errors ML20059J3081993-11-0303 November 1993 Amend 150 to License DPR-35,reducing Main Steam Isolation Valve Low Turbine Inlet Pressure Setpoint to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode to 785 Psig ML20057D7551993-09-28028 September 1993 Amend 149 to License DPR-35,revising TS to Specify LCO & SRs for Inservice Code Testing ML20035C6701993-04-0202 April 1993 Amend 148 to License DPR-35,changing Low Pressure Isolation Signal from HPCI Steam Inlet Piping to Reactor Vessel as Sensed by Analog Trip Sys ML20035B1641993-03-25025 March 1993 Amend 147 to License DPR-35,revising RPS Instrumentation Surveillance Test Intervals from 1 Month to 3 Months, Provides for 12- & 6-hr Allowable out-of-svc Times for Repairs,Tests & Deletes Water Level Perturbation ML20127P5571993-01-27027 January 1993 Amend 146 to License DPR-35,revising Scram Insertion Times to Reflect Use of Advanced GE-10 Design in Fuel Cycle 10 ML20128E8571993-01-27027 January 1993 Corrected Page Two of Amend 146 to License DPR-35 ML20127P5311993-01-25025 January 1993 Amend 145 to License DPR-35,revising TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per-cycle & Performance Discharge Test Every Five Yrs ML20126F2931992-12-16016 December 1992 Amend 144 to License DPR-35,incorporating Asterisk Referencing Footnote Granting Relief to Allow One Train of SGTS & Crheaf Sys Operable Prior to & During Refueling Activities ML20116M5571992-11-16016 November 1992 Amend 143 to License DPR-35,revising TS by Relocating Parts of Section 3/4.12, Fire Protection ML20101T5131992-07-15015 July 1992 Amend 142 to License DPR-35,revising Surveillance Interval for Local Leak Rate Testing of Main Steam Isolation Valves & Personnel Airlock Door Seals ML20094S4401992-04-0707 April 1992 Amend 141 to License DPR-35,revising Auxiliary Electrical Sys to Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys & Improving Clarity of Tech Specs ML20100Q2011992-01-29029 January 1992 Amend 140 to License DPR-35,revising Thermal & Pressurization Limit Curves of Figure 3.6.1 & 3.6.2 of Tech Specs ML20091C8651991-07-29029 July 1991 Amend 139 to License DPR-35,changing Tech Spec by Imposing New Limit of 2 Gpm Increase,Over Any 24 H Period,Of Reactor Coolant Leakage Into Primary Containment from Unidentified Sources ML20076C9361991-07-17017 July 1991 Corrected Amend 138 to License DPR-35,adding Correct Page 217a of Tech Specs ML20081K5261991-06-19019 June 1991 Amend 137 to License DPR-35,establishing Revised Basis for Safety Analysis Based on Results of LOCA Analysis Performed Using GE SAFER/GESTR-LOCA Application Methodology ML20070F1141991-03-0404 March 1991 Amend 135 to License DPR-35,changing Surveillance Requirements for Redundant Core & CCS & Allowing out-of-svc Period for CCS & LPCI Pumps ML20070B8201991-01-29029 January 1991 Amend 134 to License DPR-35,changing Expiration Date from 080826 to 120609 1999-09-24 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARML20216G5871999-09-24024 September 1999
[Table view]Corrected Page 1 to Amend 182 to License DPR-35,reflecting New Licensee,Entergy ML20209G3781999-07-15015 July 1999 Amend 182 to License DPR-35,modifying TS Table 4.6-3, Reactor Vessel Material Surveillance Program Withdrawal Schedule ML20196D0071999-06-16016 June 1999 Application for Amend to License DPR-35,changing TS Re Reactivity Control by Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8101999-05-11011 May 1999 Application for Amend to License DPR-35,requesting NRC Review & Approval of Change to TS Section 3/4.5.C, HPCI, Sys,Section 3/4.5.D, RCIC Sys & Bases Associated with Sections ML20206H9651999-05-0505 May 1999 Application for Amend to License DPR-35,modifying Licensing Basis for EDG on-site Diesel Fuel Storage Requirement & Corresponding TSs ML20203B5721999-02-0505 February 1999 Redacted Application for Amend to License DPR-35, Transferring FOL & Matls License 20-07626-04 from Boston Edison to Entergy Nuclear ML20202B4821999-01-21021 January 1999 Application for Amend to License DPR-35,using New Values for post-accident Containment Pressure in Plant NPSH Analyses Performed for ECCS Pumps.Calculations Supporting Request, Encl ML20198G5731998-12-21021 December 1998 Application for Amends to License DPR-35 & Matls License 20-07626-04,transferring PNPS from Boston Edison to Entergy Nuclear.Proprietary Info Encl.Proprietary Info Withheld. Pages 608 Through 621 of Incoming Submittal Not Included ML20198H5591998-12-21021 December 1998 Amend 180 to License DPR-35,authorizing Boston Edison Co to Change Updated FSAR Section 10.7, Salt Service Water System, to Address Single Failure Vulnerability ML20198A2321998-12-11011 December 1998 Amend 179 to License DPR-35,revising TSs 3/4.5.F.1, Core & Containment Cooling Sys, to Extend Allowed Outage Time for Emergency Diesels ML20195B8931998-11-10010 November 1998 Amend 178 to License DPR-35,modifying Various Pilgrim Nuclear Power Station TS Pages to Correct Typographical Errors,Remove Inadvertent Replication of Info & Update Various Bases Sections ML20236X4631998-07-31031 July 1998 Amend 177 to License DPR-35,relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Offsite Dose Calculation Manual,Iaw Recommendations of GL 89-01 ML20236U9731998-07-28028 July 1998 Amend 176 to License DPR-35,changing Plant TS 3/4.5.B Bases to Incorporate Ultimate Heat Sink Temp to 75 F as Required by Amend 173 ML20249C7081998-06-26026 June 1998 Application for Amend to License DPR-35,correcting Typos & Updating Bases.Changes Are Considered Administrative ML20249B8311998-06-19019 June 1998 Amend 175 to License DPR-35,modifying Plant TS Section 3.6.A.4 W/Respect to Monitoring Requirements for Vessel Flange & Adjacent Shell Differential Temp During Heatup & Cooldown ML20217H2681998-03-25025 March 1998 Application for Amend to License DPR-35,modifying Tech Specs 3.6.A.1 & 4.6.A.1 as It Pertains to Primary Sys Boundary, Thermal & Pressurization Limitations & Surveillance Requirements & Basis 3/4.6.A.Calculation Encl ML20203D4851998-02-20020 February 1998 Application for Amend to License DPR-35,to Change TS 3/4.5.B & Bases to Incorporate Ultimate Heat Sink Temperature 75 F, as Required by Amend 173.Request Fulfills Commitment to Submit TS Amend for UHS Temperature by First Quarter 1998 ML20203A0781998-02-11011 February 1998 Application for Amend to License DPR-35 UFSAR Section 10.7, Clarifying Design Basis for Salt Water Svc Water Sys ML20198R7041997-10-30030 October 1997 Amend 174 to License DPR-35,adding Footnote to TS 3.7.A.5, Primary Containment. Footnote Provides one-time Exception to Reverse Flow Testing Requirement for Containment Isolation Check Valve 30-CK-432 BECO-LTR-97-107, Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed1997-10-24024 October 1997 Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed BECO-97-096, Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-14331997-09-19019 September 1997 Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-1433 ML20148U6401997-07-0303 July 1997 Amend 173 to License DPR-35,evaluating Unreviewed USQ Associated W/Operation of Plant to Credit Use of Containment Overpressure to Suppl NPSH for Emergency Core Cooling Pumps & Increase Accident Analysis Design UHS Temp ML20140B0201997-05-28028 May 1997 Amend 172 to License DPR-35,revising TSs Definition 1.M, Primary Containment Integrity, Note 6 on Table 3.2.A for High Flow Main Steam Line Instrumentation & Table 3.2.D for Typo ML20137R8051997-04-0707 April 1997 Amend 171 to License DPR-35,revises TS Safety Limit 2.1.2, Minimum Critical Power Ratio & Associated Bases Section & Note 5 to Table 3.2.C.1, Instrumentation That Initiates Rod Blocks ML20147D8731997-02-10010 February 1997 Amend 170 to License DPR-35,revising Definition of operable- Operability,Tss & Associated Bases Section for TSs 3.9.B.2 & 3.9.B.3 BECO-LTR-97-002, Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld1997-01-24024 January 1997 Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld ML20135C1271996-11-26026 November 1996 Application for Amend to License DPR-35,modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consistent W/Lco 3/4.7.A.2.a.4 ML20134L6931996-11-12012 November 1996 Amend 168 to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6, TS 6.5.B.8 ML20128N8561996-10-0404 October 1996 Amend 167 to License DPR-35,changing TSs to Implement 10CFR50,App J,Option B ML20116L3141996-08-12012 August 1996 Amend 166 to License DPR-35,modifying Definition of Core Alteration & Limiting Condition for Operation,Surveillance Conditions & Bases Section Associated W/Ts 3.7.C ML20111B4121996-05-0101 May 1996 Application for Amend to License DPR-35,revising TS to Reflect Implementation of 10CFR50 App J,Option B ML20108C0781996-05-0101 May 1996 Application for Amend to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Util QA Manual ML20108C0261996-05-0101 May 1996 Application for Amend to License DPR-35 Re Core Alteration & LCO & Surveillance Conditions Associated W/Secondary Containment BECO-96-042, Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control1996-05-0101 May 1996 Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control BECO-LTR-96-040, Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant1996-04-25025 April 1996 Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant ML20096H2691996-01-23023 January 1996 Amend 165 to License DPR-35,revising TS to Convert Current percentage-based Scram Time Limits to notch-based Limits in TS 3.3.C & Updating Bases for notch-based Limits in TS 3/4.3.C ML20092C5711995-09-11011 September 1995 Corrected Tech Spec Page to Amend 164 to License DPR-35, Changing Control Value for Reactor High Pressure Trip Level Setting 76 Psig BECO-95-074, Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 111995-07-14014 July 1995 Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 11 ML20086A1551995-06-22022 June 1995 Corrected TS Pages of Amend 164 to License DPR-35 for Plant ML20085K9791995-06-15015 June 1995 Amend 164 to License DPR-35,revises Reactor High Water Level Trip Level Setting for Group 1 Isolation ML20081L8891995-03-27027 March 1995 Amend 162 to License DPR-35,reducing Reactor Pressure Setpoint at Which Shutdown Cooling Sys Automatically Isolates ML20081H8941995-03-22022 March 1995 Amend 161 to License DPR-35,re Changes to Listed TS & Addition of Sections 3.7.B.1.f & 3.7.B.2.e to Require That Both Trains of Standby Gas Treatment & CR Air Filtration Sys Operable ML20081J0321995-03-22022 March 1995 Amend 160 to License DPR-35 Re Changes to TS to Revise Allowable Leak Rate MSIVs ML20080T7161995-03-0808 March 1995 Amend 159 to License DPR-35,removing TS Requirement, Instrumentation That Initiates Control Rod Blocks to Have Scram Discharge Instrument Volume-Scram Trip Bypassed Operable in Run & Startup Modes ML20080J7201995-02-16016 February 1995 Amend 158 to License DPR-35,relocating Alarms for Drywell to Suppression Chamber Vacuum Breaker to Different Annunciator Panel ML20078N4751995-02-0909 February 1995 Application for Amend to License DPR-35,increasing Reactor High Water Level Isolation Trip Level Setting ML20078Q3281995-02-0202 February 1995 Amend 157 to License DPR-35,removing TS Section 4.5.H.4 Which Requires Testing & Calibration of Pressure Switches in Certain ECCS Lines BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly1994-11-22022 November 1994 Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-2011994-11-22022 November 1994 Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 ML20078K7881994-11-22022 November 1994 Application for Amend to License DPR-35 to TS Re Change to MSIV Leakage Requirement 1999-09-24 |
Text
..
f*
yo UNITED STATES j'
,j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 20666 4001 s...../
BOSTON.EDIS0N COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.164 License No. DPR-35 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Boston Edison Company (the licensee) dated February 9, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Sprcifica-tions as indicated in the attachment to this license amendment.
9506280215 950615 PDR ADOCK 05000293 P
PDR a
O f
3.
This license amendment is effective as of its date of issuance and shall be implemented within 90 days.
FOR THE NUCLEAR REGULATORY COMISSION -
Ledyard B. Marsh, Director Project Directorate I-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
June 15, 1995
ATTACHMENT TO LICENSE AMENDMENT NO.164 FACILITY OPERATING LICENSE NO. DPR-35 DOCKET N0. 50-293 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
Remove Insert 3/4.1-2 3/4.1-2 3/4.2-7 3/4.2-7 3/4.2-9 3/4.2-9 l