Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116G811 + (03:29:33, 13 December 2024)
- U-602617, Responds to RAI Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves + (03:29:33, 13 December 2024)
- ML20116G793 + (03:29:34, 13 December 2024)
- RBG-20698, Revised Final Deficiency Rept DR-182 Re Limitorque Corp Motor Operator Failure on Feedwater Isolation Valve. Operator Returned to Vendor & All Damaged Parts Replaced. Vendor Tested Operator to Insure Proper Operation + (03:29:34, 13 December 2024)
- TXX-4460, Final Significant Deficiency Rept SDAR-176 Re Equipment Hatch Cover in Reactor Containment Bldg W/Attachments Bearing Against I Beams When Positioning Cover.Item Not Reportable Per 10CFR50.55(e) + (03:29:35, 13 December 2024)
- ML20116G777 + (03:29:36, 13 December 2024)
- ML20116G779 + (03:29:36, 13 December 2024)
- RBG-20695, Final Deficiency Rept DR-289 Re Misconnected Voltage Regulator Wires on HPCS Diesel Generator Supplied by Ge. Initially Reported on 850306.Voltage Regulator Wires Reterminated & HPCS Diesel Generator Revised + (03:29:37, 13 December 2024)
- RBG-20711, Interim Deficiency Rept DR-242 Re Fracture of Pinion Gear in Limitorque Motor Operator of RHR Sys safety-related Valve.Interim or Final Rept Will Be Provided by 850515 + (03:29:38, 13 December 2024)
- ML20116G745 + (03:29:38, 13 December 2024)
- 05000282/LER-1992-014-02, :on 921007,CR Responded to Fire Alarm in Area of MSSV Header for Number 12 Sg.Caused by Personnel Error. All Valves Adjusted to Nominal Setpoint + (03:29:40, 13 December 2024)
- 05000373/LER-1996-008-05, :on 960628,foreign Matl Injected Into SW Tunnel Caused Dual Unit Shutdown Due to Inadequate Work Control. Floor & Wall Repair Work in Lake Screen House Was Stopped + (03:29:42, 13 December 2024)
- 0CAN079605, Submits Proposed Change to ANO QA Manual Operations.Change Will Change Audit Frequencies.Nrc Approval Requested Prior to Implementation + (03:29:43, 13 December 2024)
- ML20116G710 + (03:29:44, 13 December 2024)
- ML20116G706 + (03:29:45, 13 December 2024)
- 05000440/LER-1992-019, :on 921009,valve Positioning Error Resulted in Inoperability of Both SLCS Trains.Caused by Personnel Error. Operator Responsible for Valve Positioning Error Counseled Re Event + (03:29:46, 13 December 2024)
- ML20116G691 + (03:29:47, 13 December 2024)
- ML20116G688 + (03:29:49, 13 December 2024)
- ML20116G683 + (03:29:50, 13 December 2024)
- ML20116G671 + (03:29:51, 13 December 2024)
- ML20116G670 + (03:29:51, 13 December 2024)
- ML20116G662 + (03:29:52, 13 December 2024)
- ML20116G658 + (03:29:53, 13 December 2024)
- 05000456/LER-1992-011-06, :on 921007,inadequate Testing Frequency for Afp Start on RCP Bus Undervoltage.Caused by Procedural Deficiency.Instrument Slave Relay Surveillances Increased from Quarterly to Monthly Per TS 4.3.2.1 + (03:29:55, 13 December 2024)
- ML20116G648 + (03:29:56, 13 December 2024)
- NRC-96-0087, Provides Response to NRC 960628 Request for Util to Confirm Commitment to Resolve Fuel pool-related Issues Re DER 95-1021,96-0235 & 96-0306.Resolution in Progress + (03:29:57, 13 December 2024)
- 05000382/LER-1985-011, :on 850321,several Samples of O & H Concentration in Gas Decay Tank Not Taken.Caused by Misunderstanding Between Personnel.Samples Subsequently Taken.Technicians Given New Instructions + (03:29:58, 13 December 2024)
- ML20116G639 + (03:29:59, 13 December 2024)
- ML20116G638 + (03:30:00, 13 December 2024)
- BSEP-96-0294, Requests Changes to Svc/Distribution List for NRC Correspondence & Documents Re Plant + (03:30:01, 13 December 2024)
- ML20116G634 + (03:30:04, 13 December 2024)
- ML20116G631 + (03:30:05, 13 December 2024)
- ML20116G626 + (03:30:06, 13 December 2024)
- ML20116G630 + (03:30:06, 13 December 2024)
- RBG-37-686, Responds to NRC Re Violations Noted in Insp Rept 50-458/92-21.Corrective Actions:Listed Procurement & Receipt Insp Requirements Will Be Included in Procedure EDP-EQ-22 + (03:30:07, 13 December 2024)
- ML20116G622 + (03:30:08, 13 December 2024)
- ML20116G624 + (03:30:08, 13 December 2024)
- ML20116G620 + (03:30:09, 13 December 2024)
- ML20116G618 + (03:30:10, 13 December 2024)
- ML20116G616 + (03:30:11, 13 December 2024)
- 05000328/LER-1992-014-01, :on 921007,LCOs 3.6.4.1 & 3.0.5 Were Entered Because of Hydrogen Analyzer Inoperability.Caused by Low Reagent Gas Pressure for Train a Hydrogen Analyzer. Replacement pop-off Valve Ordered + (03:30:13, 13 December 2024)
- ML20116G613 + (03:30:14, 13 December 2024)
- ML20116G607 + (03:30:15, 13 December 2024)
- ML20116G605 + (03:30:16, 13 December 2024)
- ML20116G589 + (03:30:16, 13 December 2024)
- ML20116G587 + (03:30:17, 13 December 2024)
- ML20116G580 + (03:30:18, 13 December 2024)
- ML20116G572 + (03:30:19, 13 December 2024)
- ML20116G551 + (03:30:20, 13 December 2024)
- ML20116G541 + (03:30:21, 13 December 2024)
- ML20116G537 + (03:30:21, 13 December 2024)