ML20116G624

From kanterella
Jump to navigation Jump to search
Intervenor Exhibit I-GANE-75,consisting of Minutes of Nuclear Safeguards Committee Meeting on 910131
ML20116G624
Person / Time
Site: Neely Research Reactor
Issue date: 06/28/1996
From: Desai P
AFFILIATION NOT ASSIGNED
To:
References
REN-I-GANE-075, REN-I-GANE-75, NUDOCS 9608080224
Download: ML20116G624 (2)


Text

L l-(7/Ne T5 MES=f DOCUTED MINUTES [DF THE NUCLEAR SAFEGUARD COMMITTEE MEETING OF January 31, 1991

'96 JL'L 18 P12 :33 Members Present:

S. Abdel-Khalik, K.

Barefield, P.

Desai, N.
Gordan, B.
Livesay, J.

Mahaffey (vice c,

-.,s C 'E J G hf chair),

H. Neumann, J. Vickery.

pie n W Others Present:

R.A. Karam, B. Statham Distributions:

(1)

Agenda for the meeting _

(ii)

Minutes of the committee meeting of November 15, 1990 (iii)

Draft Procedures 9510 & Portions of 2002 needing revision (iv)

Form A drafts from J.

Powers The vice-chair called the meeting to order at 1:40 P.M.

1.

The minutes of the committee meeting of Nov. 15th were approved with a minor revision that includes the name of the PI requesting the form A approval.

2.

Procedure Approval A.

Procedure 9510 was tabled B.

Procedure 2002, reflecting minor modification of a previously approved version was approved with minor changes.

The revised version is available at the NNRC.

3.

Form A Approvals J.

Powers was approved as the PI with the i

understanding that H. Neumann will discuss with the PI the efficiency of the synthesis.

H.

Neumann was asked to report back to the committee on the issue.

4.

NNRC Information Items (i)

The committee discussed the status of security precautions at the NNRC during these times of international tension. It was recommended that a motion detector be installed at the main entrance to announce the arrival of a person.

(ii) The cooling tower is being renovated by using DOE funds ($28,000).

(iii)NNRC has conducted a security audit of the facility (iv) The SRP Project has been successfully completed.

NUCLEAR REGULATORY COMMISSION Docket No.fo-I 60 - R E d EXHIBIT NO.

7I In he matter of G4 Tc 4.h O staff O Applicant 3 intenenor O Other 9608080224 960628 C kloned El Received O Rejected Reporter QLW PDR ADOCK 05000160 ones C M B-4' witnee.

K*eu O

PDR y

Nuclear Safeguard Committee Minutes for January 31, 1991 Page 2 The next meeting of the committee was scheduled for March 21st at 1:00 P.M.

The meeting was adjourned at 3:10 P.M.

Respectfully submitted, Prateen Desai

~

n