Forwards Updated Exam Schedules & Notes Re Operator Licensing Natl Exams,Requalification Exams for FY93-96 & Generic Fundamental Exams for Oct 1992 & Feb & Jun 1993,per Generic Ltr 92-06
ML20116G706
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/05/1992
From: Shelton D
CENTERIOR ENERGY
To: Gallo R
Office of Nuclear Reactor Regulation
References
2097, GL-92-06, GL-92-6, NUDOCS 9211120091
Download: ML20116G706 (3)


Text

}

(

CENTERCOR ENERGY O,nt!d C. Shelton 300 Mad: son Avenue Oce hesident Auc' ear Toledo. OH 43652-0001 DusBesse (419)243 2300 Docket Number 50-346 License Number NPF-3 Serial Number 2097 November 5, 1992 Mr. Robert M. Gallo 3

Chief, Operating Branch OVFN-10D22 United States Nuclear Regulatory Commission Vashington, D. C.

20555

Subject:

Operator Licensing Examination Schedule (Genaric Letter 92-06)

Dear Mr. Gallo:

As requested by Generic Letter 92-06, " Operator Licensing Natior,al Examination Schedule", attached are Davis-Besse's updated examit:ation schedules and notes for:

1.

Operator Licensing Examinations for tiscal years 1993, 1994, 1995 and 1996 2.

Requalification Examinations for fiscal years 1993, 1994, 1995 and, 1996 and, 3.

Generic Fundamental Examinations for October 1992, and February, June 1993.

4 Should you have any questions, please contact Fr. R. V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366.

Sincere}y yours, j

f <W..b/h(h a

4 e

GAB /tby C

/ /

attechmente cc:

A. B. Davis, Regional Administrator, NRC Region III J. B. Hopkins, NRC/NRh DB-1 Senior Project Manager

~

S. Stasek, DB-1 NR': Senior Resident I.. psetor vdSNRC Document Control Desk Utility Radiological Safety Board 12 0 01*Creveland Eiectnc muminatmg rW^l '

  • aa cu==

i 9211120091 921106 Uv Toledo Edison PDR ADOCK 05000346 I

[

V PDR 1

,~'

Docket Numbar 50-346 License ilumber NPF-3.

-Serial Numbar 2097 Attachment-

-Page 1 Notes for National Examination Schedule for Toledo Edison Note 1 7.

Date (Veek 7) 11/30/92 (NRC Examination)

Nots 2 During the NRC scheduled requalification. examination'(Navember 1994) for fiscal year.(FY),19Eli Davis-Besse is-scheduled to besin a refueling outage,-10/94 - 12/94. -Toledo Edison vill provide its requalification-schedule for FY 1995 in response to.ths 1993 National-Examination-Schedule update.

General Comment for Item A, Proposed Operator: Licensing Examinations Schedule The initial licensing examinations schedule during the'requalification period are dependent on the number of candicates' required to be-re-examined due to failure during the' initial:axamination.

f it 4

l l.

I' l'--

L'

,,.---.,_...,._,.u..

-.L....__.,._~a.-...._-.-;_,

~.. -..

l J

NRC' FORM 536 U.S. NUCLEAR REGlJLATORY COMMISSION APPRovto oroue: NG. 315&#131 l

I q

EXPtRES: t/St/M e

EST1 MATED BURDEN PER atSPONSE To COMPLY W"N futs 4

thFORMAftoN NCTON REQUEST: 2 HOURS.

FOAWAAC OPERATOR LICENSING coyuENr$ nEoAmNo sunoEN ESnum to rHE, ourcN 4

l EXAMINATION DATA "5

a * ** '"S*' '**C" tuNea nu). u S. wu i

aEoutAreav couwss.cs, wAs>aNoToN, oc 2masacot, ANo 7:

THE PAPEAWORK RW PACUECT ptSo4139, OFFICE OF MANAGEMENT ANO B@ET WASHINOW, DC 205G3.

rAcitny NRC REGION

?

Davis-Besse Nuclear Power Station III 4

i A. PROPOSED OPERATOR LICENSING TiXAMINATION SCHEDULE FY 19 93 FY 1994 FY 19 9 5 FY 19 96 poios/M m/ sol,9l) potot/.2] os/so/.2ft )

po/ci/9.!t_. ce/so/93 )

co/ot/ 23. ce/so! 96.)

i 1.

ASSCNED :: ATE 4

pen c v.Eac i.sTTEn easca 11/92 11/93 11/94 11/95 NUMBEACF PEA 0TOA CPERATCRS

{

{

NUuBER OF SENCA PEACTOR cpEuroas - msTANT 1

1 1

I NuvaEn ci sENica MEA:*ca caEwreas-uaom E

?

NUMB 5A C8 SENCA 4EAM CPESTOAS - UMf!EO i

l 2.

AS$GNC3 CATE pea oEsEac LET Em ot.4Ses 05/93 05/94 05/95 05/96 4

NuwaEm os accica opEurcas 4

3 3

NeueEn os sEsca auc-ca l

C# ERAT 3 J - MTANT 3

NOVSEP OF SENICA GEACTOR ceEacens - uponA E 5

2 2

4 i

N.ueEn y sEsca patron crEurcas - uurrEs i

B. PROPOSED REQUAllFICATION EXAMINATION SCHEDULE FY 19 93 FY 19 94 FY 1995 FY 19 96 Octot' 3 oe/30/.7))

1 */01/3.)_ oolu/2,4 )

po/o1/E ce/ao/L po/ci/.9_5 os/2o/91 10/19/92 10/93 Note 2 10/95

2. DA'5 (W2Ed 2) 10/26/92 10/93 Note 2 10/95 11/02/92 11/93 hote 2 11/95 3

3

4. DATE (WEEK a) 11/09/92 11/93 Nete 2 11/95 11/16/92 11/93 lo r ' 2 11/95
6. CATE (WEFK 6)

Note 1 11/23/92 l '. /93 Note ?

11/95 1

C. PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FY OCTOBER 1992 FEBRUARY 19 93 JUNE 1993 ESTIMATED NUMBER OF CANDIDATES i