Letter Sequence Request |
|---|
|
|
MONTHYEARML20116G5511992-11-0202 November 1992 Forwards Application for Amend to License DPR-66,consisting of Proposed Change Request Number 202,revising Ts,To Allow Pool Capacity to Be Increased to 1,627 Storage Locations, Including Two Storage Cans for Defective Fuel Project stage: Request ML20127M7381993-01-25025 January 1993 Forwards Request for Addl Info Re 921102 Application for Amend to License,Changing TS to Allow Spent Fuel Pool Capacity to Be Increased to 1,627 Storage Locations Project stage: RAI ML20012G5371993-02-23023 February 1993 Responds to NRC 930125 Request for Addl Info Re 921102 TS Change Request 202 on Reracking of Spent Fuel Pool.Required Calculations Will Be Performed Using KENO-V.a & CASMO-3 Codes Project stage: Request ML20036C1731993-06-0808 June 1993 Forwards Request for Addl Info Re Proposed Change That Would Revise TS to Permit Increase in Spent Fuel Pool Capacity Project stage: RAI ML20045D6781993-06-24024 June 1993 Informs of Staff Need for Certain Info So Review of Proposal to Increase Spent Fuel Capacity for Facility,Can Continue Project stage: Approval ML20045E1691993-06-28028 June 1993 Provides Clarification of Concerns & Correction to Inaccuracy in Re Amend Proposal for Unit 1 Spent Fuel Pool Expansion Project stage: Approval ML20045H2491993-07-0909 July 1993 Forwards Response to 930608 Request for Addl Info Re Proposed TS Change Request 202,submitted Via Util .Encl Addresses NRC Concerns Re Seismic Analyses Performed to Rerack Spent Fuel Pool Project stage: Request ML20046C9621993-07-26026 July 1993 Forwards Request for Addl Info Re Licensee 921102 Application to Amend App a TS for Facility Project stage: RAI ML20056E3981993-08-16016 August 1993 Provides Response to Addl Info Request Re TS Change Request 202.Concerns Re Diver Operations & Rack Decontamination During Replacement of Spent Fuel Pool Storage Racks Discussed Project stage: Other ML20056E4021993-08-16016 August 1993 Provides Response to Addl Info Request Re TS Change Request 202.Concerns Re Heavy Loads & Thermal/ Hydraulic Parameters During Replacement of Spent Fuel Pool Storage Racks Discussed Project stage: Other ML20057A2221993-09-0303 September 1993 Provides Clarification of Info Submitted on 930816,which Responded to NRC 930713 Rai,In Response to N Wagner Request Re Control of Heavy Loads & Thermal/Hydraulic Parameters Associated W/Replacement of Spent Fuel Pool Storage Racks Project stage: Other ML20057B3431993-09-0808 September 1993 Clarifies Util Position Re Implementation of App a of Reg Guide 8.38, Radiological Precautions During Diving Operation During Planned Spent Fuel Pool Rerack Mod Project stage: Other 1993-06-08
[Table View] |
Text
%
f$
a ley Power Station Beave Shippingport. PA 150774b4 (412) 39 1 5255 JOHN D. SIEBER November 2, 1992 Vice President - Nuclear Group U.
S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 l<roposed operating License Change Request No. 202 (TAC No. M84673)
Enclosed are the following:
1.
An application for amendment to the above license to allow the spent fuel pool ste: age capacity to be increased to 1627 storage locationa, including two storage cans for defective fuel.
2.
Documents designated Attachment A,
B, C and D which set forth, respectively, the change in the technical specifications, the safety analysis (including the no significant hazards evaluation),
the typed replacement technical specification pages, and a report entitled " Spent Fuel Pool Modification for Increased Storage Capacity, Beaver Valley Power Stati.on Unit 1."
This change has been reviewed bv the Onsite Safety Committee and Offsite Review Committee and was determined to be safe based on the attached safety analysis, i
The reque ed target date for apprc/a1 of this proposed change is November 1,
.993.
If you have any questions regarding this submittal, p J.se contact R.
N. Ireland at (412) 393-5251.
Sincerely.
g D.
Sieber ec: Mr.
L.
W.
Rossbach, Sr. Resident Inspector 1-l i
1 Mr.
T.
T.
Martin, NRC Region I Administrator Mr. A.
W.
DeAgazio, Project Manager i
Mr. T.
M.
Gerusky, Director BRP/ DER Mr.
R. Janati, BRP/ DER Mr.
M.
L.
Bowling (VEPCC'
'211129029 921102 9
ADOCKOSOOggj4 DR