Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126B809 + (01:11:48, 13 December 2024)
- ML20126B807 + (01:11:49, 13 December 2024)
- ML20126B806 + (01:11:50, 13 December 2024)
- 05000334/LER-1992-012-01, :on 921116,discovered That Pressurizer Heaters, Powered from Class 1E 480-volt Buses 8N & 9P,could Trip Emergency Bus Unit Substation.Caused by Inadequate Design Assumption.Trip Setting Under Review + (01:11:52, 13 December 2024)
- ML20126B803 + (01:11:53, 13 December 2024)
- ML20126B802 + (01:11:53, 13 December 2024)
- ML20126B801 + (01:11:57, 13 December 2024)
- PNO-II-80-034, on 800226,small Leak Observed from Reactor Water Storage Tank Cooling Sys.Estimated 270 Gallons of Water Contaminated Ground.Licensee Sampling of Storm Drain Sys Showed No Release.Contaminated Matl to Be Shipped + (01:11:58, 13 December 2024)
- ML20126B798 + (01:12:02, 13 December 2024)
- ML20126B797 + (01:12:02, 13 December 2024)
- ML20126B796 + (01:12:03, 13 December 2024)
- ML20126B794 + (01:12:04, 13 December 2024)
- ML20126B791 + (01:12:04, 13 December 2024)
- ML20126B790 + (01:12:05, 13 December 2024)
- IR 05000454/1992023 + (01:12:08, 13 December 2024)
- ML20126B785 + (01:12:08, 13 December 2024)
- ML20126B784 + (01:12:09, 13 December 2024)
- ML20126B780 + (01:12:10, 13 December 2024)
- ML20126B782 + (01:12:10, 13 December 2024)
- ML20126B778 + (01:12:11, 13 December 2024)
- B11560, Forwards Response to SER (NUREG-1031) Open Item 2.2 Re Diesel Generator Load Acceptance Test After Operation,As Discussed During 850208 Telcon W/A Ungaro.Response Fully Resolves Item + (01:12:12, 13 December 2024)
- ML20126B775 + (01:12:12, 13 December 2024)
- ML20126B774 + (01:12:13, 13 December 2024)
- ML20126B773 + (01:12:17, 13 December 2024)
- ML20126B770 + (01:12:17, 13 December 2024)
- ML20126B768 + (01:12:18, 13 December 2024)
- PNO-II-80-030A, on 800220,util Issued Press Release on Reactor Trip.Westinghouse & Licensee Have Completed Initial Set of Noise Measurement Tests & Will Compare Results W/Normal Operation Testing to Locate Noise + (01:12:19, 13 December 2024)
- ML20126B766 + (01:12:19, 13 December 2024)
- ML20126B765 + (01:12:20, 13 December 2024)
- PNO-III-80-039, on 800227,unit Shut Down Because of Tube Leakage in Steam Generator A.Leak Rate Was 1420 Gpd.Licensee Will Conduct Eddy Current Tests + (01:12:20, 13 December 2024)
- PNO-II-80-032, on 800226,combination of non-nuclear Instrumentation Power & Integrated Control Sys Power Tripped Reactor.Coolant Pumps Stopped,High Pressure Safety Injection Activated & Auxiliary Feed Pumps Activated + (01:12:24, 13 December 2024)
- ML20126B761 + (01:12:25, 13 December 2024)
- ML20126B759 + (01:12:27, 13 December 2024)
- ML20126B760 + (01:12:27, 13 December 2024)
- ML20126B758 + (01:12:28, 13 December 2024)
- ML20126B756 + (01:12:29, 13 December 2024)
- ML20126B757 + (01:12:29, 13 December 2024)
- PNO-III-85-043A, on 850530,control Rods F-12 & J-4 Found Stuck During Insp.Caused by Split Pin & Broken Piece of Tube Being Lodged in Guide Tube.Guide Tube Inserts & Internals Will Be Removed & Inspected + (01:12:30, 13 December 2024)
- ML20126B753 + (01:12:31, 13 December 2024)
- ML20126B751 + (01:12:32, 13 December 2024)
- ML20126B750 + (01:12:33, 13 December 2024)
- ML20126B749 + (01:12:33, 13 December 2024)
- PNO-V-80-009, on 800211,during Unloading of Seven 55-gallon Drums,Nrc Inspector Onsite Noticed That Two Drums Rattled. Caused by Vials Containing Radioactive Liquid.No Absorbent Matl Present as Required by DOT Regulations + (01:12:37, 13 December 2024)
- ML20126B747 + (01:12:38, 13 December 2024)
- ML20126B746 + (01:12:39, 13 December 2024)
- ML20126B745 + (01:12:43, 13 December 2024)
- ML20126B743 + (01:12:44, 13 December 2024)
- ML20126B744 + (01:12:44, 13 December 2024)
- ML20126B741 + (01:12:45, 13 December 2024)
- ML20126B740 + (01:12:49, 13 December 2024)
- L-92-337, Forwards Rev 36 to St Lucie Plant,Units 1 & 2 Physical Security Plan Per 10CFR50.54(p).Plan Withheld Per 10CFR2.790(a)(3) + (01:12:50, 13 December 2024)