Forwards Insp Rept 50-277/92-31 & 50-278/92-31 on 921116-20. No Violations Noted
ML20126B791
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/15/1992
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20126B793 List:
References
NUDOCS 9212220211
Download: ML20126B791 (3)


See also: IR 05000277/1992031

Text

. N$

.s

i

l

.

!

l

DEC 15 FB2

Docket Nos. 50-277

50-278

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT:- INSPECTION IREPOltT NOS. 50 277/92-31 AND 50-278/92-31

This letter transmits the report of the inspection conducted by Mr. J. E. lleall and other NitC -

personnel, during November 16-20, 1992, at the Peach Bottom Atomic Power Station in

Delta, Pennsylvania. Mr. Beall discussed the findings with Mr. Powers and members of

your staff at the conclusion of the inspection on November 20,1992.

This inspection was directed toward areas important to public health and safety. The '

inspection reviewed the adequacy of the design and procedures used to mitigate a fire

postulated in the cable spreading room directly below the combined control room for both

Peach Bottom units. The intent was to gain a high confidence that the operators and

equipment would successfully respond to a cable spreading room fire and safely shutdown the

plant. The inspection consisted of selective examinations of design calculations,-installed

equipment, operating procedures, interviews with personnel, and observations by inspectors. ,

Overall, the inspectors concluded that the Peach Bottom design and procedures were adequate

to achieve safe shutdown following a cable spreading room fire.

Sincerely.

Or!f,1T41 $1pc4 &n'

Jncque ?..Durt,

21011g Jacque P. Durr, Chief

Engineering Branch

Division of Reactor Safety

Enclosure: NitC Inspection Report Nos. 50-277/92 '11 and 50-278/92-31

9212220211 921215

PDR ADOCK 00000277

G- PDR I

,,

-- - . _ - ..- - - -- --. -.

- _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

.

DEC 15 G32

I hir. D. bl. Smith 2

cc w/ encl:

R. N. Charles, Chairman, Nuclear Review 11oard

D.11. hiiller, Vice President, Peach 110ttom Atomic Power Station

G. Rainey, Vice President, Nuclear Services Department

G. Cranston, General hianager, Nuclear Engineering Division

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

K. P. Powers, Plant hianager, Peach Ilottom Atomic Power Station

A. A. Fulvio, Regulatory Engineer, Peach llottom Atomic Power Station

G. J. Ileck, Jr., hiarager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department,

Atlantic Electric

B. W. Gorman, hianager, External Affairs

R. hiclxan, Power Plant Siting, Nuclear Evaluations

D. Poulsen, Secretary of Harford County Council

R. Ochs, hiaryland Safe Energy Coalition

J.11. Walter, Chief Engineer, Public Service Commission of hiaryland

Public Document Room (PDR)

Isal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Insocetor

Commonwealth of Pennsylvania

Thil - Alert (Thil A)

bec w/ encl:

Region 1 Docket Room (with concurrences)

-

E. Wenzinger, DRP

C. Anderson, DRP

DRS/ Ell SALP Coordinator

V. hicCree, OEDO

J. Shea, NRR

bec w/ Executive Summary Only:

C. Hehl, DRP

C. hiiller, PDI-2, NRR

T. Kenny, SRI-Limerick

B. Norris, DRP

D. Hokxty, EO

- - - _ _ - _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _ ___ __ _

,

DEC 1513R

Mr. D. M. Smith 3

Rl: RS RI:DRS

h 2/}i92 13M /92

OFFICIAL RECORD COPY

A:PB9231.)EB