DEC 15 FB2
Docket Nos. 50-277
50-278
Mr. D. M. Smith
Senior Vice President-Nuclear
Philadelphia Electric Company
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT:- INSPECTION IREPOltT NOS. 50 277/92-31 AND 50-278/92-31
This letter transmits the report of the inspection conducted by Mr. J. E. lleall and other NitC -
personnel, during November 16-20, 1992, at the Peach Bottom Atomic Power Station in
Delta, Pennsylvania. Mr. Beall discussed the findings with Mr. Powers and members of
your staff at the conclusion of the inspection on November 20,1992.
This inspection was directed toward areas important to public health and safety. The
'
inspection reviewed the adequacy of the design and procedures used to mitigate a fire
postulated in the cable spreading room directly below the combined control room for both
Peach Bottom units. The intent was to gain a high confidence that the operators and
equipment would successfully respond to a cable spreading room fire and safely shutdown the
plant. The inspection consisted of selective examinations of design calculations,-installed
equipment, operating procedures, interviews with personnel, and observations by inspectors.
,
Overall, the inspectors concluded that the Peach Bottom design and procedures were adequate
to achieve safe shutdown following a cable spreading room fire.
Sincerely.
Or!f,1T41 $1pc4 &n'
Jncque ?..Durt,
21011g
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure: NitC Inspection Report Nos. 50-277/92 '11 and 50-278/92-31
9212220211 921215
ADOCK 00000277
G-
I
,,
--
- .
- ..-
-
-
-- --.
-.
- _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
.
DEC 15 G32
I
hir. D. bl. Smith
2
cc w/ encl:
R. N. Charles, Chairman, Nuclear Review 11oard
D.11. hiiller, Vice President, Peach 110ttom Atomic Power Station
G. Rainey, Vice President, Nuclear Services Department
G. Cranston, General hianager, Nuclear Engineering Division
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
K. P. Powers, Plant hianager, Peach Ilottom Atomic Power Station
A. A. Fulvio, Regulatory Engineer, Peach llottom Atomic Power Station
G. J. Ileck, Jr., hiarager, Licensing Section
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Director, Generation Projects Department,
Atlantic Electric
B. W. Gorman, hianager, External Affairs
R. hiclxan, Power Plant Siting, Nuclear Evaluations
D. Poulsen, Secretary of Harford County Council
R. Ochs, hiaryland Safe Energy Coalition
J.11. Walter, Chief Engineer, Public Service Commission of hiaryland
Public Document Room (PDR)
Isal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Insocetor
Commonwealth of Pennsylvania
Thil - Alert (Thil A)
bec w/ encl:
Region 1 Docket Room (with concurrences)
E. Wenzinger, DRP
-
C. Anderson, DRP
DRS/ Ell SALP Coordinator
V. hicCree, OEDO
J. Shea, NRR
bec w/ Executive Summary Only:
C. Hehl, DRP
C. hiiller, PDI-2, NRR
T. Kenny, SRI-Limerick
B. Norris, DRP
D. Hokxty, EO
- - - _ _ - _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _
___
__
_
,
DEC 1513R
Mr. D. M. Smith
3
Rl: RS
RI:DRS
h2/}i92
13M /92
OFFICIAL RECORD COPY
A:PB9231.)EB