ML20126B740
ML20126B740 | |
Person / Time | |
---|---|
Site: | Diablo Canyon, San Onofre, Humboldt Bay, Rancho Seco, 05000128 |
Issue date: | 01/07/1980 |
From: | Edson K CALIFORNIA, STATE OF |
To: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
Shared Package | |
ML16340A838 | List: |
References | |
NUDOCS 8003190734 | |
Download: ML20126B740 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P7111999-10-26026 October 1999
[Table view]Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217M8851999-10-0808 October 1999 Informs of Staff Determination That Listed Calculations Should Be Withheld from Public Disclosure,Per 10CFR2.790, as Requested in 990909 Affidavit ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20212J7481999-09-29029 September 1999 Forwards Insp Rept 50-133/99-02 on 990915.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20211Q4001999-09-0707 September 1999 Forwards Final Version of Nuclear Science Ctr TS Pending Official Approval from Nrc.Revised TS Simply Incorporates Changes That Were Proposed in Previous Ltrs with Exception of Minor Mod ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211J7731999-08-31031 August 1999 Forwards Insp Rept 50-312/99-03 on 990802-06.No Violations Noted.Insp Included Decommissioning & Dismantlement Activities,Verification of Compliance with Selected TS & Review of Completed SEs ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements HBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20211H7481999-08-13013 August 1999 Forwards Amend 126 to License DPR-54 & Safety Evaluation. Amend Changes Permanently Defueled Technical Specification (PDTS) D3/4.1, Spent Fuel Pool Level, to Replace Specific Reference to SFP Level Alarm Switches with Generic Ref ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 1999-09-07 Category:INCOMING CORRESPONDENCE MONTHYEARML20217L9491999-10-21021 October 1999
[Table view]Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20211Q4001999-09-0707 September 1999 Forwards Final Version of Nuclear Science Ctr TS Pending Official Approval from Nrc.Revised TS Simply Incorporates Changes That Were Proposed in Previous Ltrs with Exception of Minor Mod 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 HBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held HBL-99-012, Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal1999-07-0707 July 1999 Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal ML20210H9541999-07-0707 July 1999 Informs NRC of Change to Rancho Seco Decommissioning Schedule,As Described in Licensee Post Shutdown Decommissioning Activities Rept ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20210N9871999-07-0101 July 1999 Appeals Denial of Documents Re Sept 1996 Osre for San Onofre Nuclear Generating Station.Requests Copies of Sept 1996 Osre Rept & Any More Recent Osre Repts ML20209B3571999-06-28028 June 1999 Submits Response to GL 98-01,Suppl 1 Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701. Disclosure Encl ML20209B4831999-06-25025 June 1999 Requests NRC Approval of Six Relief Requests from ASME Code Requirement for Containment ISI Exams.Six Relief Requests, Provided as Enclosures 1-6,are as Listed ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20209D2501999-06-24024 June 1999 Informs That Util Has Revised All Sections of Rancho Seco Emergency Plan (Rsep),Change 4,effective 990624 ML20196G0431999-06-22022 June 1999 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Smud Rancho Seco Nuclear Generating Station ML20196A9801999-06-17017 June 1999 Responds to NRC 990420 RAI Re Proposed risk-informed Inservice Testing & GL 96-05 Programs at Songs,Units 2 & 3. Revised Pages to risk-informed Inservice Testing Program, Encl ML20195G8091999-06-14014 June 1999 Forwards Response to RAI Made During 990511 Telcon Re LARs 184 & 170 for SONGS Units 2 & 3.Amend Applications Proposed Restriction on Operation with Channel of RAS or Efas in Tripped Condition ML20195K4201999-06-11011 June 1999 Forwards LERs 99-003-00 & 99-004-00 Re Manual Esfas (Reactor Trips) Due to Problems with Main Feedwater Control.Two Events Are Being Reported Separately Because Actual Causes Are Considered Different & Independent of Each Other ML20195H1561999-06-10010 June 1999 Forwards MORs for May 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 & 3 ML20195E4981999-06-0808 June 1999 Forwards Application for Amends 188 & 173 to Licenses NPF-10 & NPF-15 for SONGS Units 2 & 3,respectively.Amends Would Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 Re Small Break LOCA Charging Flow & Main Steam Safety Valve Setpoints ML20195D1851999-05-27027 May 1999 Forwards Rancho Seco Annual Rept, IAW Plant Permanently Defueled TS D6.9.4 & D6.9.6b.Rept Contains Shutdown Statistics,Narrative Summary of Shutdown Experience,Er Info & Tabulation of Facility Changes,Tests & Experiments ML20195B8511999-05-27027 May 1999 Forwards Change 4 to Rancho Seco Emergency Plan, Incorporating Commitments Made to NRC as Outlined in NRC .Emergency Plan Includes Two Listed Supporting Documents ML20196L3191999-05-24024 May 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements for Songs,Unit 2.Rept Covers Period of 970916-990226 1999-09-07 Category:STATE/LOCAL GOVERNMENT TO NRC MONTHYEARML19332B6251989-10-18018 October 1989
[Table view]Expresses Concern Re Potential Safety Implications at Plant,Particularly That Plant Could Have Suffered Undetected Damage Which Could Pose Future Dangers for Californians ML20246F5621989-06-20020 June 1989 Forwards Constituent Raising Concerns That Reactor Will Be Started in Spite of Problems W/Bolts on Thermal Shield.Response Requested ML20247D0631988-09-0707 September 1988 Requests Response to Encl B Moller 880830 Petition,Per 10CFR2.206,to Show Cause Why Facility Should Be Shutdown Based on Poor Mgt & Release of Radioactive Water to Environ ML20151R3791988-03-21021 March 1988 Request That Restart of Facility Before 880607 Be Evaluated Solely on Public Safety Considerations by NRC ML20154P0161988-02-0808 February 1988 FOIA Request for All Records Written or Signed by R Vollmer & Sent or Copied to H Denton,R Engelken & D Eisenhut & Written or Signed by D Eisenhut Sent or Copied to H Denton, R Engelken & R Vollmer ML20196F5621988-02-0808 February 1988 FOIA Request for Computer Printout of Central Files Accession List for Plant from 1980 to Present ML20205R1451988-02-0808 February 1988 FOIA Request for Documents Re Commission 810901-851231 Meetings About Plant ML20238D4581987-12-0808 December 1987 Notifies of New Address ML20215J0191987-06-19019 June 1987 Informs That Based on Review of Fes for Decommissioning,No State Comments or Recommendations Offered ML20204F2681987-03-19019 March 1987 Requests Removal from Distribution List for Listed Dockets ML20214V7421986-11-28028 November 1986 Opines That Maintaining Spent Fuel at Current Location Under Appropriate Safeguards Currently Imposed Is Immeasurably Better than Transportation to Unavailable Site Via Potentially Dangerous Means of Transportation ML20206M4691986-08-14014 August 1986 Criticizes Des for Plant Decommissioning as Inadequate for long-term Radioactive Matls Storage in Seismically Active Area.Concerns Which Must Be Addressed in Fes Discussed. NEPA & Ceq Requirements Not Met ML20204E5661986-07-28028 July 1986 Ack Receipt of Re Extension of Comment Period on Des for Decommissioning of Facility to 860815.Recommends Public Hearing Be Scheduled within 1 Month of 860815 ML20207G1831986-07-14014 July 1986 Ack Receipt of Reply to 860610 Request for Public Hearing in Humboldt Bay Region on Des.Disappointment Expressed Re Decision Not to Continue Public Hearing.Wishes to File Petition for Leave to Intervene ML20207G0481986-07-0707 July 1986 Requests That Public Hearing on Des for Facility Be Held in Eureka,Ca ML20206R8201986-07-0101 July 1986 Forwards Change Numbers 3-9 for County of Orange Incident Response Plan for San Onofre Nuclear Generating Stations ML20211H3461986-06-13013 June 1986 Requests That Public Hearing on Des for Decommissioning Be Held Prior to Close of Comment Period on 860815.Project Has Potential long-term Consequences for Natural States of Bay & Surrounding Land Area ML20206A0561986-06-11011 June 1986 Forwards Comments on Des for Decommissioning of Plant ML20206A0461986-06-11011 June 1986 Forwards Transmitting Comments on Des for Decommissioning of Plant ML20206C9331986-06-10010 June 1986 Expresses Appreciation for 60-day Extension of Public Comments on Des Re Decommissioning of Plant & Requests Public Hearing on Des Be Convened in Humboldt Bay Region ML20198K8681986-05-29029 May 1986 Requests Extension of Public Comment Period for 60 Days Re Des for Decommissioning of Facility.Public Hearing Should Be Held in Local Area to Allow Max Public Comment ML20197D8231986-04-0202 April 1986 Suppls FOIA Request for Info Re NUREG-1055 ML20197D7931986-02-10010 February 1986 Suppls FOIA Request for Info Re NUREG-1055,including Notes Taken During Onsite Interview & Case Study C Team Notebook ML20197D7831985-12-26026 December 1985 Requests App P,Item 101 Documents from FOIA-84-293 Reviewed by Case Study C Study Team & Info Which Case Study C Conclusion Based On.Disagrees W/Closeout of FOIA-84-516 ML20138F9301985-11-0808 November 1985 Requests List of All Documents,Records & Other Info Upon Which Conclusions of Case Study C in NUREG-1055 Based. Conclusions May Prove to Be of Considerable Significance in Review of Reasonableness of Facility Costs ML20129D2921985-07-0202 July 1985 Requests Review of Encl Util 850205 Application for Financing 421,Suppl 2 Re Pollution Control,Solid Waste Disposal & Sewage Disposal Facilities.State Pollution Control Financing Authority Approved Suppl 2 on 850220 ML20129C7311985-07-0202 July 1985 Requests NRC Review & Comments on Description of Application 240 Re Sale of Bonds to Finance Project.Certificate of Pollution Control Facilities Encl ML20140E6811985-01-0404 January 1985 Forwards State of CA Regional Water QC Board 841221 Comments on Environ Rept for Decommissioning of Humboldt Bay Power Plant Unit 3,for Use in Evaluating Proposal ML20093L2821984-07-26026 July 1984 Comments on Naymark Jul 1984 Answers to Commission Questions Re Nuclear Svc Corp 1977 Audit of Facility Work of Pullman Power Co.Commission Should Not Settle for Less than Full Resolution of Safety Issues ML20101U6481984-06-19019 June 1984 FOIA Request for Three Categories of Documents Re Qa,Per Study of Facility QA Program & NUREG-1055, Assurance of Quality in Nuclear Const Projects ML20084D1091984-04-26026 April 1984 Forwards Petition for Review of ALAB-763 & Notice of Appearance for Filing.W/O Encl.Related Correspondence ML20083Q4451984-04-13013 April 1984 Requests Extension Until 840504 to File Petition for Review of ALAB-763 & Extension to Page Limits for Petition.Related Correspondence ML20087P9651984-04-0202 April 1984 Forwards Council Resolution 1865 Stating Concerns Re San Luis Obispo County Emergency Response Plan.City of Pismo Beach Considers Plan Inadequate & Assumes No Responsibility for Liabilities Associated W/Plan ML20087L7051984-03-23023 March 1984 Telecopy Ltr Urging Assurance That Alleged Safety Hazards Checked & Thoroughly Evaluated Before Granting License ML20087L7301984-03-23023 March 1984 Requests That License Not Be Granted Until Allegations by Employees of Plant Resolved ML20087L6951984-03-23023 March 1984 Telecopy Ltr Expressing View That No Low Power License Should Be Granted Until All Safety Questions & Allegations Resolved ML20079Q2871984-01-23023 January 1984 Objects to Authorization of Plant Operations Prior to Resolution of Allegations.Independent Audit of Design Review & Comprehensive QC Reinsp & Ofc of Investigations Review of Qa/Qc Breakdown Causes Recommended ML20079M2381984-01-23023 January 1984 Suggests Completion of IE Investigation Re Causes of Qa/Qc Breakdown,Independent Audit of Util/Bechtel Design Review & Comprehensive QC Reinsp of All safety-related Hardware by Independent Body Before Authorizing Operation ML20079Q6121984-01-19019 January 1984 Requests Thorough Investigation of Worker Allegations About Safety,Poor Quality,Intimidation & Falsification of Records. Investigation Should Be Completed Prior to Allowing Low Power Operation ML20079K0441984-01-19019 January 1984 Requests NRC Investigation of Allegations Re Qc/Qa Breakdown,Possible Mgt Coverup of Problems & Worker Harassment.Investigation Should Be Completed Before Authorizing Plant Operation ML20079J1411984-01-19019 January 1984 Recommends Complete Investigation Into Causes of Qa/Qc Breakdown,Independent Audit of Design Review & Comprehensive Independent QC Insp of All safety-related Hardware ML20079H3261984-01-19019 January 1984 Requests NRC Authorize Complete Investigation Into Causes of Qa/Qc Breakdown,Authorize Independent Audit of Util/ Bechtel Design Review & Authorize Comprehensive QC Reinsp of All safety-related Hardware ML20079J2471984-01-18018 January 1984 Urges Serious Allegations Re Qa/Qc Be Investigated Prior to Plant Operation ML20079H8651984-01-18018 January 1984 Urges Full Investigation of Allegations of Potential Safety Problems Be Undertaken Before Granting Util License to Operate ML20079J1561984-01-17017 January 1984 Urges Careful Investigation Into Alleged Safety Problems & Violations Prior to Licensing ML20079J0871984-01-17017 January 1984 Requests NRC Require Independent Design Review Audit, Comprehensive QC Reinsp of Plant & Investigation of Root of Apparent Overwhelming Problems Before Authorization of Operation ML20079J0601984-01-17017 January 1984 Urges Extraordinary Steps Be Taken to Investigate All Allegations of Inadequacy in QA Program in Order to Allay Public Concern About Safety of Opening Facility ML20079H4171984-01-17017 January 1984 Recommends Fair Public Hearing & Thorough Investigation of All Credible Allegations Re Potential Safety Problems at Facility ML20079E3301984-01-13013 January 1984 Advises That Governor Deukmejian Supports Util Request for Authority to Operate at Modes 3 & 4.No Safety Hazards Presented by Precriticality Operation.Testing Can Provide Valuable Info Re Operation of Plant ML20079J1271984-01-12012 January 1984 Discusses Allegations by Util Workers Re Poor Const QC & Unsafe Bldg Practices.Nrc Should Perform Complete Review of Util/Bechtel Design Review & Reinsp of Plant Safety Features by Outside,Independent Authority 1989-06-20 |
Text
~ ~ ' ' ~ ~ -
- 'J.*.._,
O ;
- tateofGaliforttia GOVERNOR'S OFFICE
"(
OFFICE OF PLANNii4G AND RESEARCH g, 1400 TENTH STREET S ACR AMENTO 95814 EOMUND G. GROWN Jn, 4 oovenmon
/ */)Y
\
hDO ,?'/QY l 9 h 'Y y
- Q bh
%D'O ' ),h
/
January 7, 1980 70 vg0, Mr. Samuel J. Chilk Secretary Nuclear Regulatory Commission Matomic Building 1717 H Street, N.W.
Room 1135 Washington, D.C. 20555
Dear Mr. Chilk:
The Governor's Office of Planning and Research is analyzing land use around existing California nuclear facilities and may sponsor related legislation.
I understand that the Nuclear Regulatory Commission defines low population zones around existing plants (Title 10, CFR, Part 100, Section 100.3) and requires maps of such zones f rom applicants for operational permits in their final analysis safety report. It would help our analysis if you would send copies of the maps of low population zones around the follow-ing nuclear power plants: Humboldt Bay, Rancho Seco, San Onofre, and Diablo Canyoa.
Thank you very much for your assistance.
Sincerely yours, Karen Edson l l
t KKE:1gh I
8008190 13H /