ML20126B780

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-454/92-23 & 50-455/92-23 on 921117-20.No Violations Noted
ML20126B780
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/08/1992
From: Snell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20126B783 List:
References
NUDOCS 9212220206
Download: ML20126B780 (2)


See also: IR 05000454/1992023

Text

, o: ()q,O

,4

Docket No. 50-_454 DEC 0 81992

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Opus West III

1400 Opus Place

Downers Grove, IL 60515

Dear Mr. Reed:

SUBJECT: ROUTINE RADI0 CHEMISTRY INSPECTION AT THE BYRON NUCLEAR GENERATING

. STATION ON NOVEMBER 17 THROUGH 20, 1992

This refers to the routine safety inspection conducted by Dr. J. House of this

office on November 17 through 20, 1992. The inspection included a review of

authorized activities for your Byron facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during this inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with. personnel. In

addition, our. Mobile Laboratory was at the site during the inspection to

perform independent measurements of radioactivity.

No violations of NRC requirements were identified during the-course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC:

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,-

William Snell, Chief

Radiological Controls Section.2

Enclosure: Inspection Report

--No. 50-454/92023(ORSS)

No. 50-455/92023(DRSS)

See Attached Distribution:

.RHI RI I RI

-210025

use/sd ber Snell

p i V o.l8k hgg\

\ ki

$A 88M35$$$j4

a -

- .

.

..

. .

.

.

. , .

. 7-

'

Commonwealth Edison Company 2

8 992

Distribution

cc w/ enclosure:

M. Wallace, Vice President,

PWR Operations

T. Kovach, Nuclear

Licensing Manager

T. Schuster, Nuclear Licensing

Administrator

R. Pleniewicz, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspectors, Byron,

Braidwood,. Zion

Richard Hubbard

J. -W. McCaffrey, Chief, Public

Utilities Division

Licensing Project Manager, NRR

Robert Newmann, Office of Public -

Counsel, State of Illinois Center

Robert M. Thompson, Administrator

Wisconsin Division of Emergency

Government

State Liaison Officer

!

-,