ML20126B749
ML20126B749 | |
Person / Time | |
---|---|
Site: | Trojan File:Portland General Electric icon.png |
Issue date: | 09/25/1992 |
From: | PORTLAND GENERAL ELECTRIC CO. |
To: | |
Shared Package | |
ML20126B698 | List: |
References | |
ES-3.3, NUDOCS 9212220197 | |
Download: ML20126B749 (27) | |
Text
. _ . _ _ _ _ . . ._ _ _ . _ . _ - . _- _ _ . . - . . . _ _ ..-
t .
PORT 1AND GENERAL ELECTRIC COMP 4NJ:,! j c 7.. '
g 7y.. .
TROJAN NUCLEAR PIAFT b"I - 'C~' *
% nG l'. -
- /a . . , -; g , , , e ...
May 18, 1992 Revision 7
- QUAllTY-RELATED EVENT SPECIFIC EMERGENCY INSTRUCTION - ES-3.3 POST-STEAM GENERATOR TUBE RUPTURE COOLDOWN USING STEAM DUMP.
RESPONSIBLE DEPARTMENT OPERATIONS APPROVED BY em i DATE DI@
~ PR0(lEQU)E MANAGER EFFECTIVE DATE ~~3 b This procedure contains the following attachments:
- 1. RCS SUBC00 LING CURVE
- 2. ESTABLISHING S/G BLOWDOWN SAMPLING
- 3. STARTING AN INSTRUMENT AIR COMPRESSOR
- 4. RCP NUMBER ONE SEAL LEAK 0FF FLOW OPERATING RANGE
- 5. RCS C00LDOWN DATA A. PURPOSE
- 1. This procedure provides actions to cool down and depressurite the Plant to cold shutdown conditions following a steam generator tube rupture. This recovery method depressurises the RUPTURED S/G by dumping steam.
B. ENTRY CONDITIONS
- 1. This procedure is entered from EI-3. (STEAM GENERATOR TUBE RUPTURE),
Step 40. ONI 3-12, (STEAM GENERATOR TUBE LEAK), Step 30, when-plant staff selects the steam dump method.
- 2. ES-3.2, (POST-STEAM GENERATOR TUBE RUPTURE C00LDOWN USING STEAM GENERATOR BLOWDOWN), Step 10, when blowdown is not available and Plant staff selects steam dump method.
- This procedure has been extensively revised.
l ZNDM.443
l
. i REFERENCE PAGE FOR ES-3.3 i 1. AIMINISTRATIH FIElCIIMS h
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. AMERSE. CGtTAllEGNT CGEDITIGIS l
ACCisdefinedasContainmentPresgure>3.5psigDEContainment Radiation has been at any time 210 R/HR.
- 3. SI REINITIATIGt CRITERIA
, MANUALLY operate ECCS pumps as necessary AND CO TO ECA-3.1, (SCIR WITH IDSS OF REACTOR COOIANT - SUBC00 LED RECOVERY DESIRED), Step 1, if EITHER condition listed below occurs!
- RCS subcooling (25'F (<75'F ACC)
- PZR level can HDI be maintained >5% (>30% ACC) 4 M ITERIA CO 70 EI-2, (FAULTED STEAM GENERATOR IS01ATIG(), Step 1, if fdIRER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HpI been isolated I
- 5. COLD 12G UCIRCUIATIGt SWITG07ER CRITERIG(
IE RWST level decreases to <48%, IREN GO TO ES-1.3, (TRANSFER TD COLD LEG RECIRCUIATIGI), Step 1.
! 6. APW SUPPLY SWITCEOFER CRYTmt1A II CST level decreases to <9% IHIH supply AFW from Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIPLE TUBE RUPTURE M ITERIA 4
RETURN TO RI-3, (STEAM GENERATOR TURE RUPTURE), Step 1, if flIHER condition listed below occurs:
- Any INTACT S/G level increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGfTINDOUS ACTIG( STEPS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
] 7. Control RCS Pressure And Makeup Flow To Minimize RCS To S/G Leakage
- 9. RUPTURED S/G NR Level >14% g'
- 11. Control RCS Makeup And Letdown To Maintain PZR Level i
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs i
- 13. RCP Trip Criteria - Single Pump !
l ES-3.3 Revision 7
POST-STEAM GENERATOR TUBE RUPTURE COOLDOWN USING STEAM DUMP Action / Expected Response Response Not Obtained
- CAUTION *
- Steam should not be released from any S/G if water may *
- exist in its steamline. *
- It is assumed in this procedure that S/G radioactivity is *
- low and the dumping of steam will not present a release *
- hazard. An off-site dose calculation should be performed *
- prior to using this procedure.
- EDIE At least one RCP should be in operation while performing the steps outlined in this procedure.
- 1. Enerrise FZR Eeaters As Neceamary To Maintain FZR Pressure Ran=1 To auntund SLGs trennus ES-3.3 Page 2 of 27 Revision 7 ,
I l
l
REFERENCE PAGE FOR ES-3.3
- 1. AMINISTRATIVE FUNCTIMS )
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADVERSE CTE(TAINGMT_CGIDITIWS ACCisdefinedasContainmentPresgure>3.5psigQBContainment Radiation has been at any time 210 R/HR.
- 3. SI. REINITIATIGL GITERIA MANUALLY operate ECCS pumps as necessary AHD CO TO ECA-3.1, (SCTR WITE IDSS OF REACTOR C001 ANT - SUBCOOLED RECOVERY DESIRED), Step 1, if EITHER condition listed below occurst
- RCS subcooling <25'F (<75'F ACC)
- PZR level can HQI be maintained >5% (>30% ACC)
- 4. SECMDARY INTEMITY GITERIA GO TO EI-2, (FAULTED STEAN GENERATOR ISOLATIM), Step 1, if ElIHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HDI been isolated )
- 5. COLD LEG RECIRCUIATIM SWITG0FER GITERIM II RWST level decreases to <48%, IHEN CO TO ES-1.3, (TRANSFER TD COLD LEC RECIRCUIATIM), Step 1.
- 6. AFW SUPPLT SWITGOVER CRITERIA IE CST level hereases to (9%, IREN supply AFW f rom Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIPLE TUBE RUFTURE MITERIA RETURN TO EI-3, (STEAM CENERATOR TUBE RUPTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G level increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CM TINUOUS ACTI M STEPS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14% I
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
, 12. Depressurize RCS To Backfill From RUPTURED S/Gs
POST-STEAM CENERATOR TUBE RUPTURE C001.DOWN USING STEAM DUMP Action / Expected Response Response Not Obtained i
l
- 2. Clutch If SI Ace -1atera_Should i 0 De Isolated:
- a. Check the following: a. 00 TO RCA-3.1, (STIAM CENERATOR TUBE RUFTURR WITE ID6S OF
- PCS subcoollng based on REACTUR COOIANT - SUBC0012D core exit TC, - >25'T REC 0FERY DESIRED). Step 1.
l
(> ?5'T ACC) !
- PZR level - >$1 (>30%
ACC)
- b. RCS pressure - <1000 psig b. Do HQI isolate Si accumulators.
C(BITINUE WITE Step 3. MEEf RCS i pressure <1000 peig. IEEN do Steps 2.c. 2.d. and 2.e.
- c. Close power supply breakers
, for all SI accumulator outlet valves VALVE BREAKER MO-8808A B-2510 MO-8808B B-2610 MO-8808C B-2511 MO-8808D B-2611.
i
- d. Close all SI accumulator d. Vent any unisolated SI outlet valves: accumulator:
- M0-8808A- 1) Verify closed SI Accumulator
- MO-8808B Ng Supply (CV-8880)
- MO-8802C
- MO-8808D Step 2 continued on next page ES-3.3 Page 3 of 27 Revision 7
REFERENCE PAGE FOR ES-3.3
- 1. AMINISTRATIVE FUNCTIG4S
)
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. AuggsLC[gI&ImgI_QGEDITIWS ACCisdefinedasContainmentPresgure>3.5psigQRContainment Radiation has been at any time 110 R/HR.
- 3. SI REINITIATIM CRITERIA MANUALLY operate ECCS pumps as necessary A E GO TO ECA-3.1, (SGIR Wild IDSS OF REACTOR COOIANT - SUBC00I2D RECOVERT DESIRED), Step 1, if FJIHER condition listed below occurs:
- RCS subcooling <25'F (<75'F ACC)
- PZR level can HQI be maintained >5% (>30% ACC) 4 EXcGtIERY ILTEGEITT CRITERIA GO TO EI-2, (FAUI.TED STEAM GENERATOR ISOIATIW), Step 1, if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated )
- 5. COLD IJLC RECIRCUIATIGi SWITEROVER CRTmfm IE RWST level decreases to (48%, IREN GO TO ES-1.3, (IRANSFER 10 COLD IMG RECIRCUIATIN), Step 1.
- 6. AFW SUFFLY 1Rilinnuvam CETTRET_A IE CST level decreases to (9%, IHEN supply AW from Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIPLE TURE RUPTTfnN ERTTERTA RETURN TO II-3, (STEAM GENERATOR TUBE RUPTURE), 3tep 1, if EITHER cri.ht. tion listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CummDOUS ACTim Sms
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INIACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14% )
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill Frcm RUPTURED S/Gs
- _ _ _ - - - - - - _ - . .__------..-A
POST-STEAM CENERATOR TUBE RUPTURE COOLDOWN USING STEAM DUMP Action / Expected Response Response Not Obtained Step 2 continued
- 2) Open SI Accumulator N2 fill valve for accumulator to be vented:
ACCUMULATOR VALVE A CV-8875A B CV-8875B C CV-88750 D CV-8875D 1
- 3) Open SI accumulators N2 Y'"t (HPK-943).
- 4) WHEN SI accumulator is depressurized. IHEN close SI accumulator N2 fill valve opened in Step d.2).
- 5) Close SI accumulators N2 vent (HPK-943).
IE HQI able to vent all unisolated SI accumulators, THEN contact TSC for further assistance.
- e. Open power supply breake s for all SI accumulator outlet velves:
I VALVE BREAKER
. M0-8808A B-2510 M0-8808B B-2610 MO-8808C B-2511 MO-8808D B-2611 l l
' ES-3.3 Page 4 of 27 Revision 7
REFERENCE PAGE FOR ES-3.3
- 1. A3tMISTRATIVE FID8CTIWS }
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADFERSE CGtTADEGNT CGEDITIGIS ACCisdefinedasContainmentPresgure>3.5psigQRContainment Radiation has been at any time 2.10 R/HR.
- 3. SI RE MITIATIM CRITIRIA MANUALLY operate ECCS pumps as necessary AND GO TO ECA-3.1, (SCIR WITH IDSS OF REACTOR COO 1 ANT - SUBCOOLED RECOVERT DESILED) Step 1, if EITHER condition listed below occurst
- RCS subcooling <25'T (<75'F ACC)
- PZR level can HDI be maintained >5% (>30% ACC) 4 SECGID&RY INTEGRITY CRITERIA GO TO II-2, (FAULTED STEAM GENERATOR ISOIATIW), Step 1, if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressuritted and has HQI been isolated )
- 5. COLD LEG RECIRCUIATIM SWITCH 07ER CRITERIM IE RWST level decreases to <48%, IHEN GO TO ES-1.3, (TBANSFER TD COLD LEG RECIRCUIATIM), Step 1.
- 6. AZM fiUFFLY SWITCEOFIR CRITERIA II CST level decreases to (9%. IHEH supply AFV f rom Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIPLE TURE RUPTURE CEITERIA RETURN TO II-3, (STEAM GENERATOR TUBE RUPTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner e
- Any INTACT S/G has abnormal radiation
- 8. CGfTDfDOUS ACTIM STEFS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. g RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
4*
POST-STEAM GENERATOR TUBE RUPTURE COOLDOWN USING STEAM DUMP Action / Expected Response Response Not Obtained
- 3. Verift RUFITRED S/Ga Blowdown Establish Blowdown Sampling for Saanplina - IN SERVICE RUPTURED S/Gs. Use Attachment 2 ESTABLISHING S/G BLOWDOWN SAMPLING.
- 4. Tarifv ^' :r.aate Shutdown
@ Hargia:
- a. Notify Chemistry to sample RUPTURED S/Gs for boron concentration.
- c. Shutdown Margin - ADEQUATE c. Borate RCS as necessary to FOR COLD SHUTDOWN obtain desired RCS boron concentration.
- 2) REFER 70 01 11-8, (SEUTDOWN MARGIN), for aid in determination of desired RCS boron concentration-
- e. Borate RCS as necessary to maintain desired RCS boron concentration ES-3.3 Page 5 of 27 Revision 7
I REFERENCE PACE FOR ES-3.3
- 1. AIE11NISTRATIVE FUNCTIWS }
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALa)
- 2. ADHREE CGrIADetEl(T CGEDITIGIS ACCisdefinedasContainmentPresgure>3.5paigDEContainment Radiation has been at any time 210 R/HR.
- 3. ELREIMITIATIM CRIIIRIA MANUALLY operate ECCS pumps as necessary AND C0 TO ECA-3.1, (SCTR WITH IDSS OF REACTOR C001 ANT - SUBCOOIED RECORRY DESIRED), Step 1, if EITHER condition listed below occurst
- RCS subcooling <25'T (<75'F ACC)
- PIR level can HQI be maintained >5% (>30% ACC) 4 SECGED&1Y INZEIRIII_CRIZILIA 00 TO EI-2, (FAULTED STIAN CINERATOR ISOIATIW), Step 1 if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated )
- 5. COLD I2G RECIRCUIATIGI SWITCEOTER CRITERIGt IE RWST level decreases to <48%, IRI21 CO TO ES-1.3, (TRANSFER TO COLD LEC RECIRCUIATIGI), Step 1.
- 6. AFW SUFFLT SWITMOFER CRITERIA II CST level decreases to <9%, IBZH supply AW f rom Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIPLE.TURE RUFTURE CRITERIA RETURN TO EI-3,. (STEAM CENERATOR TURE RUPTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGtTINUOUS ACTIG( STEPS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14% II
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
POST-STEAM GENERATOR TUBE RUPTURE COOLDOWN USING STEAM DUMP Action / Expected Response Response Hot Obtained
- CAUTION
- AW Pumps will trip at a CST level of 35% unless blocked. *
- 5. thek DrrAM S/C Instig3 0
- a. INTACT S/Gs NR level ->7% a. Maintain total feed flow
(>14% ACC) >720 spm until NR level is >7%
(>14% ACC) in at least one INTACT S/G.
- b. Control feed flow to b. II NR level in any-INTACT S/G maintain NR level in all continues to increase in an INTACT S/Gs - BEW EEN 7% uncontrolled manner IHf2100 and 50% (BE WEEN 14% and M II-3, (STIAM CENERATOR TURE 50% ACC) RUFTURE), Step 1.
ES-3.3 Page 6 of 27 i
Revision 7
REFERENCE PAGE FOR ES-3.3
- 1. AMINIS3&TIVE FUNCTIWS l
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. AINERSE CMTADMENT CtMDITIGIS ACCisdefinedasContainmentPresgure>3.5psigDEContainment Radiation has been at any time 110 R/HR.
- 3. SI REINITIATIM GITERIA MANUALLY operate ECCS p imps as necessary AND GO TO ECA-3.1, (SGTR WITH IDSS OF REACTDR COOIANT - SUSC0012D RECOVERY DESIRED), Step 1, if EITHER condition listed below occurs:
- RCS subcocling (25'F (<75'F ACC)
- PZR level can HQI be maintained >5% (>30% ACC)
- 4. SECGmaRY INTEGRITT MITERIA GO 10 EI-2, (FAULTED STEAM GENERAIDR ISOIATIM), Step 1, if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated l
- 5. COLD LEG RECIRCUIATIGt SWITCROVER GITERIM II RWST level decreases to (48%, IEN GO TO ES-1.3, (TRANSTER TD COLD LEG RECIRCUIATIM), Step 1.
- 6. APW SUPPLT SWITGOVER CRITERIA IE CST level decreases to <9% IEN supply AFV f rom Service Water by opening MO-3045A and M0-3045B.
- 7. MULTIPLE TUBE RUPTURE GITIRIA RETURN 10 EI-3, (STEAM GENERATOR TUBE RUPTURE), Step 1. if ElIEE condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CMTINUOUS ACTIM STEFS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. g RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
~ . - .. ...-. -.-. --_ - . -- . _ -
POST-STEAM GENERATOR TUBE RUPTURE C00LDOWN USING STEAM DUMP Action / Expected Response Response Not Obtained HQIE Since RUPTURED S/Gs may continue to depressurize te less than the minimum RCS pressure necessary for continued RCP operation, cooldown to Cold Shutdown st.ould not be delayed.
- 6. Initiate Ret Coaldown To 350'F
- b. Maintain RCS cooldown rate-
- <100*F/hr
- c. Dump steam to condenser c. Dump steam using INTACT S/Gs from INTACT S/Gs: PORVs.
- 1) CONDENSER AVAILABLE 09 QE light on Permissive Status Panel - LIT Dump steam using INTACT S/Gs steam supply valve to Turbine
- 2) Verify INTACT S/Gs MSIV AFP.
- 3) Place Steam Dump Mode Selector in Steam Pressure Mode
- 4) Place ADIH LOLO TAVE INTERLOCK Switches in BYPASS
- 5) Operate Condenser Steam Dumps Step 6 continued on next page ES-3.3 Page 7 of - 27 Revision 7 l
[
REFERENCE PACE FOR ES-3.3
- 1. AMINISTRATIVE FUNCTIWS )
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALa)
J
- 2. ADVERSE CMTADeGINT CGtDITIGIS l
ACCisdefinedasContainmentPresgure>3.5psigDEcontainment Radiation has been at any time 110 R/HR.
] 3. SI REINITIATIM CRITERIA ,
l MANUALLY operate ECCS pumps as necessary mfd Go 70 ECA-3.1, (SGTR WITH l IDSS OF REACTOR C001 ANT - SUBCOOLED RECOVERY DESIHD), Step 1, if l EITHER condition listed below occurst l
- RCS subcooling (25'F (<75'F ACC)
- PZR level can HDI be maintained >51 (>30% ACC)
- 4. SECWD&RY DtTEGRITY CRITERIA CO 70 EI-2, (FAULTED STRAM GENER& TOR ISOIATIN), Step 1 if ElIEEE condition listed below occurs:
- Any S/G pressure is decreasing in ar. uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has EQI been isolated }
, 5. COLD LEG 18CIRCUIATIM SWITG0YER CRITERIM l IE RWST level decreases to <48%, IHEti CO TO ES-1.3, (TRANSFER TO COLD LEG RECIRCUIATIW), Step 1.
- 6. APW SUPPLY SWITCEOFER CRITERIA II CST level decreases to (9%, IEEti supply AfW from Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIPLE TUBE RUPTURE CRITERIA RETURN TO EI-3, (STEAM CENERATOR TUBE RUPTURE), Step 1, if EITHER condition listed below occurs:
i
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. C M TINUOUS ACTIM STEPS
- 2. SI Accumulator Isolation
-4. Verify Adequate Shutdown Margin
- 5. INTACT S/Cs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
POST-STEAM GENERATOR TUBE RUPTURE C00LDOWN USING ETEAM DUMP Action / Expected Response Response Not Obtained Step 6 continued Dump steam using INTACT S/Gs steamline low point drain to condenser:
- 1) LOCALLY close MANUAL isolation for RUPTURED S/Gs steamline low point drain to condenser S/G MANUAL-ISO A MS-012 B MS-009 C MS-010 D MS-011
- 2) OPEN Steamline HP Drains to condenser.
Step 6 continued on next page i
ES-3.3 Page 8 of 27 Revision'7
l RETERENCE PAGE FOR ES-3.3
- 1. AIFIMISTRAflYE FUNCTIW!S g
- Monitor CST Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. AMERSE_CWTAIMEINT_CGEDITItMS ACC it defined as Containment Pres RMistionhasbeenatanytime110gure>3.5psig02 R/HR. containment
- 3. J 1EIKIIIAIEE ctITERIA MANUALLY operate ECCS pumps as necessary AND 00 TO ECA-3.1, (SCTR WITH IDSS OF REACTOR C001 ANT - SUD0001XD RECOFERY DESIAED), Step 1, if EITEER condition listed below occurst
- RCS subcooling (25'T (<75'T ACC) 1
- PZR 1evel can HQI be maintained >$% (>30% ACC) 4 SEUGED&1T INTEGRITT CRITERIA 00 TO E!-2, (FAULTED STEAM CINERATOR ISOLATIGI), Step 1, if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- 5. COLD _12G.1ECIRCUIATIGI RWITCEOTER_C11TERIGI I II RWST level decreases to (48%, IEEN GO TO ES-1.3, (TEANSPC To COLD I2C RECIRCUIATIW) Step 1.
- 6. AFW SUFFLT BWITCEOTER CRITERIA IE CST level decreases to <9%, IEEH supply AW f rom Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIF12 TURE RUPTURE CRITERIA RETURN TO EI-3, (STEAM CINERATOR TUBE RUPTURE), Step 1, if ElICQ condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGfTINT10DS ACTIGf ITIFS
- 2. SI Accumulator Isolatica
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/C, tevel And Total Teedficw
- 9. RI'"iURED S/e NR Level >14% I
- 12. Depressurite RCS To Backfill Trom RUPTURED S/Gs
.. .. - . -,-- .- . - _ _.- . . -.- - .-- ._ .. - - . - - _ _ - = - _ . . . . - _ . . - .
a POST-STEAM GENERATOR TUBE RUPTURE COOLDOWN USING STEAM DUMP Action / Expected Response Response Noc Obtained Step 6 continued
- 3) LOCALLY OPEN steamline low point drain trap bypass from INTACT S/G to condenser (Located on the ,
45' elevation between the Steam Dumps and the "B" Condenser)
C/G BYPASS VALVE A CO-390 B C0-395 C CO-400 D CO-405 II no INTACT S/G available AND RHR System HQI in service. IEEN perform the following
- Use FAULTED S/G DE
- 0010 BCA-3.1, (8011 WITE 1488 0F REACTOR 0001 ANT - SUBC0012D RECO U RY PE81 RED). Step 1.
l l
i ES-3.3- Page 9 of 27 Revision 7-
l REFERENCE PAGE FOR ES-3.3
- 1. AMINISTRATIVE FUNCIIGG l
- Monitor CSF Status Trees l
- Monitor Emergency Action Levels (EALs) 1
- 2. ADFERSE CMTADGENT CMDITIWS 4
ACCisdefinedasContainmentPresgure>3.5psigDEcontainment Radiation has been at any time 110 R/HR. ,
- 3. SI _1EIMITIATIWLCRIIERIA I
MANUALLY operate ECCS pumps as necessary AND 00 TO ECA-3.1, (SGTR WITH IDSS OF REACTDR C00! ANT - SUSC00I2D REC 0FERT DESIRED), Step 1 if EITHER condition listed below occurst
- RCS subcooling <25'F (<75'T ACC)
- PZR level can RQI be maintained >$% (>30% ACC)
- 4. SECGm&RT INTEGRITT CRITERIA C0 TU EI-2, (FAULTED STEAM CINEEATOR ISOIATIM), Step 1, if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has EQI been isolated I
- 5. COIA LEG RECIRCUIATIM EWITm07ER CRITERIW II RWST level decreases to (48%, IEN CO TO ES-1.3. (TRANSFER TV COLD 12G RECIRCUIATION), Step 1.
- 6. AFW SUPPLY SWITM OFIR CEITERIA II CST level decreases to <9%, IEN supply AfV from Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIPLE TfmE RUPTME Cu T'rWE TA #
RETURN 10 II-3, (STEAM CENERATOR TUBE RUFTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnonnal radiation
- 8. C2fIIN00DS ACTIst sTrPS
- 2. SI Acewnulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14% g
- 11. Centrol RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurite RCS To Backfill From RUPTURED S/Gs
POST-STEAM GENERATOR TUBE RUPTURL C00LDOWN USING STEAM DUMP Action / Expected Response Response Not obtained
- CAUTION *
- RCS and RUPTURED S/Gs pressures must be maintained less than *
- the RUPTURED S/Gs PORV setpoint. *
- 7. Centrol RCE_IIsamure ^-d Makais 0 FinL Io ut <-tm. ar's to s/c laakagei
- a. Perform the appropriate action from Table 1.
TABLE 1 RUPTURED S/Gs-LEVEL PZR LEVEL INCREASING DECREASING OTFSCALE HIGH
< 21%
- Increase RCS
(< 45% ACC) makeup flow makeup flow makeup flow l
- Depressurize
- Maintain RCS and RCS using and RUPTURED S/Gs Step 7.b pressures equal BEWEEN 21% Depressurize Turn on Maintain RCS and and 50% RCS using PZR RUPTURED S/Gs (BEWEEN 45% Step 7.b heaters pressures equal
- and 50% ACC) l __
BENEEN 50%
- Depressurize Turn on Maintain RCS and and 75% RCS using PZP RUPTURED S/Cs (BENEEN 50% Step 7.b hes'te rs pressures equal and 60% ACC)
- Decrease RCS makeup flow
> 75% Decrease RCS Turn on Maintain RCS and
(> 60% ACC) makeup flow PZR RUPTURED S/Gs
. heaters pressures equal-Step 7 continued on next page l
ES-3.3 Page 10 of 27 Revision 7
-- - - - , . , - . , , , _ . . . , _ . . , . - ~ , ..._.-.m ,, , . ~ , .-_ _ - _
w _ . , _ , . . _
REFERDiCE PAGE FOR ES-3.3
- 1. AIMINISTRATIVE FIDICTIWS )
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADFEESE CG(TAllemtT CGEDITIWS ACCisdefinedasContainmentPresgure>3.5psigDEContainment Radiation has been at any time 110 R/HR.
- 3. SI.REINITIATIGt CRITILIA MANUALLY operate ECCS pumps as necessary AND C0 TO ECA-3.1, (SCTR WITH IDSS OF REACTOE COOLANT - SUBCOOLED RECOVERT DESIRED), Step 1, if EITHER condition listed below occurs
- RCS subcooling (25'F (<75'T ACC)
- PZR level can HQI be maintained >$% (>30% ACC)
- 4. SECGWART INTEGRITY CRITERIA GO TO EI-2, (FAULTED STEAM CINERATOR IS01ATIW), Step 1, if ElIHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated I
- 5. COLD.12G RECIRCUIATIGt SWITGOFER GITERIM IE RWST level decreases to <48%, IEEN C0 TO ES-1.3, (TRANSFER TO COLD LEG RECIRCUIATIN), Step 1.
- 6. AFV SUFFLT BWIT G OVER CRITERIA II CST level decreases to <9%. IHEN supply AIV from Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIF12 TURE RUPTURE CRITERIA RETURN TO RI-3, (STEAM GENERATOR TUBE RUPTURE), Step 1, if EITHER condition listed below occurst
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGfTINUQUS ACTIG( STEFS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. g RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
FLs -STEAN GENERATOR TUBE RUPTURE C00LDOWN USING STEAM DLHP l A# tion.! . seted Response Response Not Obtained
}- a nn. e .
t l 1
Step 7 continued
- b. Use normal PIR spray as b. H letdown is in service. IRE required by Step 7.a use Auxiliary Spray. REFER 10 01 3-3, (FRES8URIZER SYSTEM OPERATI(st).
II EQI. IRE use one PZR PORV.
- 8. Chack_If RCfLCoeldern_Shonid_Re Stosands
- a. RCS temperature - (350'F a. REWEN 10 Step 4.
- 9. Check RUPTnern g/Ga MR Imm1 - Refill RUPTURED S/Gs to 64%
0 >14% (50% ACC) using feed flow.
II either of the following conditions occurs. IBM stop feed flow to RUPTURED S/Gs
- RUPWRED S/G pressure decreases in an uncontrolled manner.
- RUPTURED C/G pressure increases to 1100 psig.
ES-3.3 r se 11 of 27 Revision 7
- - - , , - - ,w ~, . - , , . , , - . . , , ,
REFERENCE PACE FOR ES-3.3 9
- 1. AIIIINISTEATIVE FUNCTIMIS l
- Monitor CST Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADFERSE CTEfTADeGNT OWEITIGIS ACCisdefinedasContainmentPresgure>3.5psigQRContainment Radiation has been at any time 110 R/HR.
- 3. SI_REIMITIATIG( CRITE11A MANUALLY operate ECCS pumps as necessary AND 00 70 BCA-3.1, (SCTR WITE IDSS OF EMACTOR C001 ANT - SUBCOOLED REC 0 FEET DESIRED), Step 1, if EITHER condition listed below occurst
- RCS subcooling <25'r (<75'F ACC)
- PZR level can HQI bo maintained >5% (>30% ACC)
- 4. SECGED&1T INTEGRITY CRITERIA 00 TO EI-2, (FAULTFD STEAN CINERATOR 1801ATIM), Step 1, if EITHER condition listed below occurst
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated l
- 5. COLD LEG RacIRCUIATimt BWITCROTER CRITE115 lE RWST level decreeses to <48%. IR E 00 To ES-1,3, (TBANSFER TO COLD LEG RECIRCUIATIGI), Step 1.
- 6. AFW .SUFFLT EWITCEDVER CRITERIA II CST level decreases to <9%. IRE supply AFV from Service Water by opening MO-3045A and MO-3045B.
- 7. ItDLTIPLE TURE RUPTURE CRITERIA RETURN 10 E1-3, (8TIAN GENERATOR TURE RUPTURE), Step 1. if EITHER condition listed below occurst
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGffDfDOUS ACTIGt ETEFS 2.
SI Accumulator Isolation
.s . Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. g-RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
. Revision 7
__m__ a
.,9e+* , e, :
s , ,+ e #
,+,/ s.
- f ,,s 6
% .* \h *y %* '.
sf,p 6#
g / #
,, .. n$ $
6,,
,e < , s/ *,
r ,3 g'sc - ,.
++
, s, pp,.s , ..
(5#s
- @ ,a , 0 g .'
- . - p*
,.Sj',se. ,A** C# ,,.* 6
.. ,44 .. #o
. . gs +, ..
+* ,+ p + , ,te.
. .. ,e ,,,
.* g$ s.Y
~ ~
p.z*, .1 $Y
q' r o9
.h epeur
- e s' , s. ,
5 Ss.C* c ,v t*
,*ge @t
@* . W
$0 66
- \* 4,T 4
Cr p
., pt ge 96*
t.;
s.
., ; . e ,ses.
,4
- n,.
<ee O \ .. S.S . ,, -
t .
1 REFERENCE PACE FOR ES-3.3
- 1. A!E11MISTRATIYE FultCT1WS )
- Monitor CST Status Trees j
- Monitor Emergency Action Levels (EALa)
- 2. ADFIRSE CGrTADemtT CGEDITIGIS
- ACCisdefinedasContainmentPresgure>3.5peigQRContainment Radiation has been at any time 110 R/ER.
- 3. 81.REINITIATIm( CRITERIA l MANUALLY operate ECCS pumps as necessary AND 0010 ECA-3.1, (SCTR WITE j IASS OF REACTOR C001 ANT - SU5000L3D RECOVERY DESIRED), Step 1, if j EITHER condition listed below occurst l
- RCS subcooling (25'T (<75'T ACC)
- PIR level can HQI be maintained >5% (>30% ACC)
- 4. SECGEMRY DtTEGRITT CRITERIA
- CO TO EI-2, (FAULTED STEAM CINERATOR ISOIATION), Step 1, if EITHER condition listed below occurs i
- Any S/G pressure is decreasing in an unctatrolled manner and has NOT been isolated
- Any S/G is completely depressurized and han HQI been isolated )
- 5. COLD.12G.1ECIRCUIATIst.sWITmDrzt CRITERIst H RWST level decreases to (48%, IREN 00 TO ES-1.3, (TEANSFEE TD COLD LEG RECIRCUIATIW), 8tep 1.
- 6. AFW EUFPLT SWITCROFIR CRITERIA H CST level decreases to (9%, IREN supply AFV from Service Water by
- opening MO-3045A and MO-3045B.
- 7. MULTIPLE TURE RUPTURE CRITERIA RETUIN TO EI-3, (STEAM CINERATOR TUBE RUPTURE), Step 1, if EITHER condition listed below occurs
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGtTINDOUS ACTIGt ITIFS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14% !
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
POST-STEAM CENERATOR TUBE RUPTURE C001.DOWN USING STEAM DUMP Action / Expected Response Response Not Obtained
- 11. Control RCILMakaun Flow And
@ laidown To Maininin FZR. Imglg
- a. PZR level - >21% (>45% ACC) a. Increase RCS M/U flow as necessary to maintain level >21%
(>45% ACC). 00 TU 8tep 12.
OB8ERVE CAUTI(Bf prior to Step 12.
- b. PZR level - <75% (<60% ACC) b. Decrease RCS M/U flow as necessary to maintain level <75%
(<60% ACC). 00 70 Step 13.
- CAUTION *
- During rapid RCS depressurization void formation may occur in *
- the reactor vessel head. This may result in r pid PZR level a t
- changes during depressurization, PZR spray, or pressurisation *
- 12. Destsaantine m Tn_Ministias ,
~
@ RCS-In-Saccadarv ' - h==st
- a. Use normal PZR spray a. H letdown is in service, IRDi use auxiliary spray. REFER TO DI 3-3, (PRESSURIZER SYSTEM OPEBATI(BI). H HQI, IlU21 use one PZR PORV.
- b. Turn on PZR heaters as necessary
>25'T (>75'F ACC)
ES-3.3 Page 13 of 27 Revision 7 l
l
REFERENCE PAGE FOR ES-3.3
- 1. AIMINISTRATIVE FtElCTIWIS
)
e Monitor CSF Status Trees
- Monitor Emergency Action Levels (Eats)
- 2. ADFERSE CG(TAI]SEENT CGEDITICEIS ACCisdefinedasContainmentPresgure>3.5psisQRContainment Radiation has been at any time 110 R/HR. r
- 3. El REINITIATICM CRITERIA MANUALLY operste ECCS pumps as necessary AND 00 TO ECA-3.1, (SGTR WITH IDSS OF REACTOR COOIANT - SUB00012D RECOVERY DESIRED), Step 1, if ElHER condition listed below occurst
- RCS subcooling (25'T (<75'T ACC)
- PIR level can HQI be maintained >5% (>30% ACC) 4 SECGID&RY INTEGRITY CRITERIA 00 70 EI-2, (FAULTZD STEAM GENERATGR ISOIATIGI), Step 1, if 11HER condition listed below occurst
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated )
- 5. COIR LEG _18CRCHIAIIGLSKIERQEER_CKIIE11Gi II RWST level decreases to <48%, HEN GO TO ES-1.3, (TRANSFER TD COLD LEG KECIRCUIATIGI), Step 1.
- 6. AFW SUFFLY.5WITCIOVER CRITERIA II CST level decreases to <9%, HEN supply AFV from Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIP12 T1TRE RUPTtfBE CR YTER f A RETURN TV EI-3, (STEAM GENERATOR TURE RUPTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGtTINDOOS ACTION STEFS
- 2. SI Accumulator Isolation 4 Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level-And Total Feedflow
- 9. RUPTURED S/G NR Level >14% I
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
AJ__.__.1_m_. sa_ 'i._L.-4 ,1 _._.A .____-_..______su__a.__Ja -JL__.1..-- _ A d_-__.AA _>,aa_ -.__.._._:1 _2_ 4.a~ e.. m_._ .-_C4, wh.sA .- _ _ '.A-w__
POST-STEAM GENERATOR TUBE RUPTURE C00LDOWN USING STEAM DUMP Action / Expected Response Response Not Obtained i
- 13. Check If nera chauld Be j 0 StospedI i
- a. Check the followingt a. 00 TO Step 14.
- RCP number one seal differential pressure -
) (200 psid 1
i QE
- RCP number one seal leakoff flow - LESS THAN THE LOWER LIMIT OF THE OPERATING RANGE OF 2 ATTACHMENT 4, RCP NUMBER ONE SEAL LEAK 0FF FLOW OPERATING RANGE
- b. Stop affected RCPs
- 14. h ck IF REW Staten Pma Be F1 meed in ServiceI
- a. Check the followingt a. RETURN TO Step 9.
- RCS temperature - <350'T
- RCS pressure - <380 psig
- b. Place RHR in service in cooldown mode. REFER TD OI 4-1, (RESIDUAL REAT REMOVAL) l ES-3.3 Page 14 of 27 Revision 7
RETERENCE PACE FOR 15-3.3
- 1. AIMMISTRATIVE FUNCTIGIS )
- Monitor CF Status Trees
- Monitor Emeagency Action Levels (Eats)
- 2. ADVERSE CGtTAIIGEINT CGEDITIGtS ACC is defir.ed as Containment Presgure >3.5 pais 01 Containment Radiation has been at any time 110 R/HR.
- 3. El REMITIATIG( CRITE11A MANUALLY operate ECCS pumps as necessary AHD 00 TO ECA-3.1, (SCTE WITE ID88 0F REACTom C001 ANT - SUB000 LED RECOVERY DESIRED), Step 1, if EITHER condition listed below occurst
- RCS subcooling <25'T (<75'T ACC)
- PZR level c u ROI be maintained >5% (>30% ACC)
- 4. EECGEDhET INTEGRITT CRITERIA 00 TO EI-2, (FAULTED STEAM CINERATOR 1801ATIW), Step 1 if EITHER condition listed below occurst
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated }
- 5. COLD LEC RECIRCUIATIGE EWiltEOTER CRITERIGI II RWST level decreases to <48%, IREN 0010 ES-1.3, (TBANSFER 10 COLD IEG RECIRCUIATIM), Step 1.
- 6. AFW EUFPLT IWIT M OTER CRITERIA II CST level decreases to <91, IREN supply AFV from Service Water by opening MO-3045A and M0-30453.
- 7. SIBLTIFI2 TURE RUFTURE CRITIKIA RETURN 10 RI-3, (STEAM GENERATOR TURE RUFIVEE), Step 1, if EITHER condition listed below occurs
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGtTINDODS ACTIGI EIEFS
- 2. SI Accumulator Isolation 4 Verify Adequate Shutdown Margin
- 5. INTACT S/Cs Level And Total Feedflow
- 9. RUf31 RED S/G NR Level >14% '
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
. -. - _. - . _ _ = - - - _ . - - . - - .. -, - .- . _ - - - _ __ . . -_ - .... - -
POST-STEAM GENERATOR TUBE RUPTURE C00LDOWN USING STEAM DUMP Action / Expected Response Response Not Obtained
- 15. h tinum Rcs cooldown To cold Shutdownt
- b. Maintain RCS cooldown rate - <100'F/hr
- c. Use RHR System if in service in cooldown mode
- d. Dump steam to condenser d. Dump steam using INTACT S/Gs from INTACT S/Gs PORVs.
- 1) CONDENSER AVAIIABLE C9 QB light on Permissive Status Panel - LIT Dump steam using INTACT S/Gs steam supply valve to Turbine
- 2) Verify INTACT S/Gs MSIV ATP.
l Step 15 continued on next page l
ES-3.3 Page 15 of 27 Revision 7 4
.m.-. ,.m,- ,
r ~* +- -c -+wn- + -=--w c - e- *-m = w w e e w e-n - -- re--rws---m -e --~'r *- --- -
r-- -~ --- - = -+re
l REFERENCE PAGE FOR ES-3.3 3
- 1. AMINISTRATIYE FtBICTIES )
- Monitor CSF Status Trees
- Monitor Emergency Action Levcis (EALs)
- 2. ADFERSE COBrfADemfT OmtrITICIIS ACCisdefinedasContainmentPresgure>35psigDEContainment Radiation has been at any time 110 R/HR.
- 3. EI REIMITIATIWI CRITIKIA MANUALLY operate ECCS pumps as necessary AND 0010 BCA-3.1, (SCTR WITE
]
IASS OF REACTUR C00! ANT - SUBC0012D RECOFERY DESIRED), Step 1, if EITHER condition listed below occurs
,
- RCS subcooling (25'T (<75'T ACC)
- PZR level can HQI be maintained >$% (>30% ACC)
- 4. EECGID&RY INTEGRITY CRITERIA GO K. 41-2, (FAULTED STEAM CENERA10E 1801ATIGI), Step 1, if EITHER
- condition listed below occurs
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated l
- 5. COLD LEG RECIRCUIATIGI WITMOFER CRITERIGI II RWST level decreases to <48%, IEEN 00 70 ES-1.3, (TRANSFER 70 COLD 12G RECIRCUIATIWI), Step 1.
- 6. AFW SUFFLT SWITCEOTER CRITERIA II CST level decreases to <9%, IEEN supply AW from Service Water by opening MO-3045A and MO-30458.
- 7. IfDLTIFIA TURE RUPTURE CRITERIA RE! URN 10 EI-3, (STEAM GENERATOR TURE RUFTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGITIWDOUS ACTIGt STEFS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
- 13. RCP Trip Criteria - Single Pump ES-3.3-Revision 7
p l
POST-STEAM GENERATOR TUBE RUPTURE C00LDOWN USING STEAM DUMP Actien/ Expected Response Response Not Obtained i
Step 15 continued
- 3) Place Steam Durep Mode Dump steam using INTACT S/Gs Selector in Steam steamline low point drain to Pressure Mode condenser
- 4) Place IQIX LOLO TAVE 1) LOCALLY close MANUAL INTERLOCK Switches in isolation for RUPTURED S/Gs BYPASS steamline low point drain to condenser
- 5) Operate Condenser Steam Dumps S/0 MANUAL ISO A MS-012 B MS-009 C MS-010 D MS-011
- 2) OPEN Steamline HP Drains to condenser.
- 3) LOCALLY OPEN steamline low point drain trap bypass from INTACT S/G to condensert (Located on the 45' elevation between the Steam Dumps and the "B" Condenser) v S/G BYPASS VALVE A CO-390 B CO-395 C CO-400 D CO-405 l Step 15 continued on next page- 1 I
ES-3.3 Page 16 of 27 Revision 7
REFERENCE PAGE FOR ES-3.3
- 1. AMINISTIATIVE FtBICTIMS )
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADVERSE CGtTAI19 TENT O[EfDITIGtS ACC is defined as Containment Presgure >3.5 psis QR Containment Radiation has been at any time 110 R/HR.
- 3. EI.REINITIATIarf CRITERIA MANUALLY operate ECCS pumps as necessary AND 00 TV BCA-3.1, (SCTR WITE 1D88 0F REACTOR COO! ANT - SUSC001JED RECUTIET DESIRED), Step 1, if EITHER condition listed below occurs
- RCS subcooling (25'T (<75'T ACC)
- PZR level can HQI be maintained >51 (>30% ACC)
- 4. SECGEMY IMTEGEITY CRITERIA 00 TO EI-2, (FAULTED STEAM CINERATOR ISOIATIW), Step 1 if EITHER condition listed below occurs
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated I
- 5. COWI2G RECIRCUIATIGt EWITCR0fEK CRITI115 LE RWST level decreases to <48%, IRIN CO 70 Es-1.3, (TRANSFER TO COLD LEC RECIRCUIATIGI), Step 1.
- 6. AFW BUFFLY IEfITCROVII CRITERIA 1E CST level decreases to (9%, IREN supply AFV from Service Water by opening MO-3045A and MO-30458.
- 7. MULTIF12 TURE RUPTTIRE CRITIRIA 2
RETUEN TO RI-3, (STEAM CENERATDR TUBE RUPTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGtTINDOUS ACTIGt BTEPS
- 2. SI Accumulator Isolation 4 Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level->14% )
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTVRED S/Gs
POST-STEAM GENERATOR TUBE RUPTURE 'JOLDOWN USING STEAM DUMP Action /E.xpected Response Response Not Obtained Step 15 continued II no INTACT S/G available &HD RER System EQI in service. IllEH perform the following:
- Use FAULTED S/G QE .
- 00 TO ECA-3.1, (SCM WITI 1485 0F REACTOR OCImfT - SUB00012D RECORRY DESIRED), Step 1.
- 16. Chack RCS Temperatures - (200'T RETURN TV Step 9.
- 17. Eraluate. lena-Tem Plant Atatust
- a. Maintain cold shutdown conditions
REFERENCE PAGE FOR ES-3.3
- 1. AMINISnATIVE PUNCTINS }
- Monitor CST Status Trees
- Monitor Emergency Action Levels (EALa)
- 2. ADFERSE CGITADemfT CMDITIES ACCisdefinedasContainmentPresgure>3.5ps,lgDBcontainment Radiation has been at any time 210 R/HR.
- 3. SL11Df1T14TJGI CRITERIA MANUALLY operate ECCS pumps as necessary AND 00 TO ECA-3.1, (SGT1 WITE IASS OF REACTOR C00! ANT - SUB000 LED ARCOVERY DESIRED), Step 1, if IIIRIE condition listed below occurs:
- RCS subcooling (25'F (<75'T ACC)
- 4. BBCGtD&1Y INTEGRITT MITE 11A 00 TO EI-1, (FAULTED STEAM CENIIATOR ISOLATIW ), Step 1, if EITHER condition listed below occurs
- Any S/G pressuti is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HDI been isolated )
- 5. COLD LEG RECIRCUIATIGt MITm0TER MITERIG(
II RWST level decreases to <48%, IHIH CO TO ES-1.3, (TRANSFER TO COLD LEG KECIECUIATICBI), Step 1.
- 6. AFW EUFFLY WITGOVER MITERIA IE CST level decreases to <9%. IREN supply AW from Service Water by opening MO-3045A and MO-30458.
- 7. HULTIFLE TURE RUPTURE MITERIA RETURN 10 ZI-3, (STEAM CINERATOR TUBE RUPTURE), Step 1, if EITHER condition listed below occurst
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INIACT S/G has abnormal radiation
- 8. CGfTINUOUS ACTIG( STEFS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
( 5. INTACT S/Gs Level And Total Teedflow l 7. Control RCS Pressure And Makeup Flow To Minimize RCS To S/G Leakage
- 9. I RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurire RCS To Backfill From RUPTURED S/Gs
- - . . _ - .. . - . _ . - _ . - . . . . . - - . - - . - - . - - - . - - _ . - . . - - . - . - . . = .
i .
i 1
RCS SU3 COOLING CURVE
< i I
-I . ,
2GCO._ ,
, a I
/ .
i I . M
' - > I t
_ _.L_ - .
i
---+ -. p 1 .,
-j .
~ -
! e s
E. 0 00..-
i . -
[
- m. ~ ._
At w ! ," l -
l -,
w _ --.
~ a.-
m .. . __ i i . - m- t ._ -_
i .t._- '
el
.s, .- p'. t y >
' 'l ' '
D. 1500;_- .- ,
.. . . f s
' ' ' ' t m t.
SUBCOOLED / ' '
n}
i i . ! / -- .
[
g .
, . .R.EGI.ON 1
.f
.I:
. i if . ,4 e . . .
gl; y ,
i, 4
irti . . i
+
- i e
- p. _
e
' I i* /,"e ,
j p. g i
, , i , ,
. i ,
i gie' 1003,. ,
, , , i . ..f , . . . . . .
,l t
, i , i i 4 , . . < > if. , < i i .
i I *.1 , s i i t .. . . . i ces I f ( 1 e i e s i , .
- g a e i . e e i a . , if .. ., # . 6 4
, , i . . . . . f ..., , , , .
i g,
. ,,e
, p . , 4
, , . . . , , f , .
s' m 5 0 0,.. '
= '
SUPERHEATED. ,
' i
~
REGION..
I L 1 # ,
if .t
- - f !
l '
0 57 l
-300 400 500 6ho ': 7bo 200 !. e t
RCS Temperature (*F) 5 k
+
Attachment 1 .
Page 1 of 1 .
-ES-3.3 Fage 18 of 27-Revision 7
. ._. , _ - _ . . _ . . . _ . . . . . _ . _ _ _ .a._._..._- . . - _ , _ . , . - . . . - . - . . _ .
i l
l REFERENCE PAGE TOR ES-3.3 l
- 1. AMINISTEATIVE FUNCTIWS ) ,
- Monitor CST Status Trees
- Monitor Emergency Action Levels (EAls)
- 2. ADFERSE CGtTADeGNT CGEDITICEIS ACCisdefinedasContainmentPresgure>3.5psigQEContainment Radiation has been at any time 110 R/HR.
- 3. 51.REINITIATIG( CRITERIA MANUALLY operate ECCS pumps as necessary AND 00 TO ECA-3.1, (SCTR WITE IDSS OF REACTOR C001 ANT - SUBC0012D RECOVERT DESIRED), Step 1, if EITHER condition listed below occurst I
- RCS subcooling (25'T (<75'F ACC)
- PIR level can HQI be maintained >5% (>30% ACC) l 4 SECGEI11Y INTEdITY CRITERIA 00 TO EI-2, (FAULTED ETEAM CINERATOR ISOIATION), Step 1, if E1IRIE condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has EQI been isolated l
- 5. COLD. LEG RECIRCUIATIGt SWITCROFER CRITERIG(
IE RWST level decreases to <48%, IREN GO TO ES-1.3, (TRANSFER TO COLD 12C RECIRCUIATIGE), Step 1.
- 6. AFW SUFFLT BWIT G 0FER CRITERIA II CST level decreases to (9%, IREN supply ATW f rom Service Water by opening M0-3045A and MO-3045B.
- 7. ItDLTIPLE TURE RUPTTIRE CRITERIA RETURN TO II-3, (STEAM CENERATOR TUBE RUFTURE), Step 1, if EITHER ll condition listed below occurs
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGfTINDOUS. ACTIG( RTIFS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level i 12. Depressurice RCS To Backfill From RUPTURED S/Gs
, 13. RCP Trip Criteria - Single Pump ES-3.3 Revision 7 t
'P i ESTABLISHING S/G BLOWDOWN SAMPLING
] ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **
CAUllM 2
- If loss of off-site power occurs after SI reset, then only *
'
- those loads initiated by the shutdown sequencer will *
- restart on the EDG. *
- occur until the, reactor trip breakers are closed. *
- 1. Reset SI.
- 2. Reset CIS:
- Reset CIS Phase A i
- Reset CIS Phase B
- 3. Verifying an Instrument Air Compressor in service by performing the followings
- a. Check an Instrument Air Compressor available
- Any Instrument Air Compressor running
- BCW Pump running
- BCW cooled by Service Water
- b. II an Instrument Air Compressor is available, TH E GO TO Step 4 of this attachment.
- c. II power is available to any Instrument Air Compressor, IEE ,
restore cooling from BCW and Service Water AND LOCALLY start an Instrument Air Compressor.
- d. II an Instrument Air Compressor is now available. IEE GO TO Step 4 of thia attachment.
- e. LOCALLY start the Diesel Air Compressor. REFER TO OI-T 67, (TWIFORARY BACKUF DIESRL AIR CGtFRESSOR).
- f. II an Instrument Air Compressor is now available, IREN GO TO Step 4 of this attachment.
- g. LOCALLY start an Instrument Air Compressor using Attachment 3 ,
STARTING AN INSTRUMENT AIR COMPRESSOR.
Attachment 2 Page 1 of 3 ES-3.3 Page 19 of 27 Revision 7
REFERENCE PAGE FOR ES-3.3
- 1. AIMINISTRATIH FUNCTIIMS
)-
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADfEESE CMTAllSMfT OGIDITIMS ACCisdefinedasContainmentPresgure>3.5psigQRContainment Radiation has been at any time 110 R/HR.
- 3. SI.511MITIAIIM CRITERIA MANUALLY operate ECCS pumps as necessary &HD 00 TO RCA-3.1, (SCIR WITE 1488 0F REAC1DR C001 ANT - SUE 000 LED RECOVERT DE8 IRED), Step 1, if EITHER condition listed below occurs:
- RCS subcooling-<25'F (<75'F ACC)
- PIR level can HQI be maintained >$% (>30% ACC)
- 4. REctEm&RT IlrTEGRITT CRITERIA 00 TO El-2, (FAULTED STEAM GENIEATOR ISOIATIW), Step 1 if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has RQI been isolated l
- 5. C012 LEG RECIRCUIATIGE BWITCROVER CRITERIM II RWST level decreases to (48%, IREN 00 To Es-1.3, (TBANSFER TO COIS LEC RECIRCUIATIGt), Step 1.
- 6. AFW EUFFLY BM11T'anTER cRYTERYA II CST level decreases to <91, IREN supply AfW from Service Water by opening MO-3045A and MO-30458.
- 7. 9tDLTIFI2 TURE RUP1 vine cRYTumf A RE1UEN TO II-3, (8 TEAM GENIEATOR TURE RUFTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGtTINDOUS ACTIG( ETEFS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPIVRED S/G NR Level >14% I
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
l l
d i ESTABLISHING S/G BLOWDOWN SAMPLING i
- 4. Establish Instrument Air to Containment:
- a. MANUALLY or LOCALLY open Instrument Air Supply To e
- Containment (CV-4471)
I
- b. II Instrument Air pressure is RQI normal. IREN LOCALLY verify air compressors and air dryers operating correctly.
REFER 10 (MI-51. (IDSS OF INSTittMENT AIR).
- CAUTION
- j
- The following steps will block Auxiliary Feedwater Pump auto *
- start signals. If Auxiliary Feedwater is needed, then the *
- pumps will have to be MANbALLY started.
- j *
- l i 5. Verify Al and A2 energized.
- 6. Block BOTH AFP Auto Start on loss of Main Teed Pumps.
l 7. Block BOTH AFP Auto Start on Lo-Lo S/G 1evel at Panels C49A and C49B.
(Key Numbers 0-2 and 0-3) l EDIE
- A PRM-10 ALERT can be bypassed at Panel C-41.
,
- A PRM-10 HIGH alarm can be cleared by local flushing.
- 8. Reset S/G Blowdown Eample CIS.
4
- 9. Establish CCW flow to SCII equipment by opening the following valves:
] Train An-
- CV-3303
!
- CV-3287 DE Train B:
- CV-3304
- CV-3288 Attachment 2 Page 2 of 3 ES-3.3 Page 20 of 27 Revision 7 t
-. ~. . - _ . . . . - . . . . _. , _ . , _ , _ . ., ._..,...,,_.m , , . . . y. , ~ .
. ~~. _._- _ . . - - - - . - - - _ . - _ . - . .--- . - - - - -
i i
RETERENCE PAGE FOR ES-3.3
]
- 1. AMINISTRATIYE FullCTIGIS l 4
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADVERSE C(n(TAIIEEHI_QtMDITItatS ACC is defined as Containment Pres ure >3.5 psis QB Containment Radiation has been at any time 210 R/RR.
- 3. 51..REINITIATIGf MITERIA I MANUALLY operate ECCS pumps as necessary AlfD 0010 BCA-3.1, (8CTR WITE IDSS OF REACIUR COOLANT - SUB00012D RECOVERY DESIRED), Step 1, if 1 MIER condition listed below occurst
- RCS subcooling (25'T (<75'T ACC)
- PZR level can RQI be maintained >5% (>30% ACC)
- 4. SECTEtD&RY INTEGRITY CRITERIA 00 TO EI-2, (FAULTED STEAM CINERATOR IS01ATIGE), Step 1, if HIHH condition listed below occurst
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has EQI been isolated l
- 5. COLD 12G RECIRCtP_ATIGI EWITMOTER GITERICEE H RWST level decreases to (48%, IEDi CO TO ES-1.3, (TRANSFER TO COLD 12G RECIRCU1ATI(BI), Step 1.
- 6. AFW SUFFLY MfIT M OTER CRITERIA H CST level decreases to (9%, IEDi supply AW f rom Service Water by opening MO-3045A and M0-30455.
i
- 7. IIULTIFI2 TURE RUFTURE CRITERIA RETURN TO EI-3, (8 TEAM CBIERATOR TURE RUPTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnomal radiation
- 8. CGtTINDOUS ACTIGl..RTRS 2.. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
1 ;
j i
+
ESTABLISHING S/G BLOWDOWN SAMPLING j
i
- 10. Coordinate with Chemistry to establish S/G Blowdown sampling for j RUPTURED S/Gs:
! a. Open RUPTURED S/Gs Blowdown Comunon Sample ISO:
! C0tfl0N i S/G SAMPLE
! ISO
)
A CV-2811 B CV-2880-C CV-2814 D CV-2809
, b. Request chemistry sample RUPTURED S/Gs.
l
- 11. RETURN 10 Procedure Step in effect.
I l
l I
1 l
l Attachment 2 Page 3 of 3 :
ES-3.3 Page.21 of 27. I Revision-7 -
I l . ..
l
REFERENCE PAGE FOR ES-3.3
- 1. AIMINISTRATIVE FUNCTIGIS )
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. AINERSE.CGffADeGNT CGIDITICEtS ACCisdefinedasCon.ainmentPresgure>3.5psigDEcontainment Radiation has been at any time 210 R/HR.
- 3. SI 111MIIIAIlCELEXIII11A MANUALLY operate ECCS pumps as necessary &!iD 00 10 ECA-3.1, (SGTR WITR LOSS OF REACTDR C001 ANT - SUBC0012D RECOF51T DESIRED), Step 1, if EITHER condition listed below occura
,
- RCS subcooling <25'T (<75'T ACC)
- PZR level can liQI be maintained >5% (>30% ACC)
- 4. SECG m&RT Ilf11 EITT MITERIA CO TO EI-2, (FAULTED STEAM CENERATOR ISOIATIGI), Step 1, if elm condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated I
- 5. COLD . IAG . EECIRCUIATIGt . WITm0fE1 MITERIG(
IE RWST level decreases to <48%, IllI21 CO TO ES-1.3, (7tANSTER 10 COLD LEG RECIRCUIATICBI), Step 1.
- 6. AFW SUFFLY SWIT m 0FER CRITERIA 1E CST level decreases to (9%, Ill]2i supply ATV f rom Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIP12 TURE RUPTmr CRf'rTRf A RETURN TO EI-3, (STEAM CENERATOR TUBE RUPTURE), Step 1 if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGffINDOUS ACTIG( STEPS
- 2. SI Accumulator Isolution
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Cs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTVRED S/Us
Revision 7 1
a STARTING AN INSTRUMENT AIR COMPRESSOR
,= ,
K01E ,
This attachment provides instructions to start an Instrument Air Compressor under a variety of conditions.
l
- 1. H power is available to an Instrument Air Compressor. Dil2f 00 TO Step 2 of this attachment. E power is HQI available. Dil2i prepare to re-energise the Sullair or the A Joy Instrument Air Compressor by performing the followings a) Open all bus AS_ breakers:
- A-501 Bus A5 Feeder e A-502 A Heater Drain Pump
- A-503 A Cooling Tower Makeup Pump
- A-504 LC B09 Feeder
- A-505 LC B05 Feeder
- A-506 A5 to A6 Bus Tie i
- A-507 LC B07 Feeder
- A-508 LC B13 Feeder
- A-509 LC B15 Feeder
- A-510 Startup Auxiliary Feed Pump b) Open all bus B07 breakers:
- B0712 LC B07 Feeder
- B0713 MCC B35 Feeder
- B0714 Sullair Air Compressor Feeder
- B0722 North Stator Cooling Water Pump Feeder
- B0723 A Joy Air Compressor
- B0724 North CRDM Feeder c) Open the B05 to B07. bus tie breaker (B0532).
Attachment 3-Page 1 of 4 ES-3.3 ~
Page 22 of.27:
Revision 7
...-.-....a----- . --.-.,.-......-. - - .. .- .- . . . ,
a REFERENCE PAGE FOR ES-3.3
- 1. AIMINISIIATHLElltCTINS g
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs) 4
- 2. ADVERSE CMTADMElfT .CWDITIWS ACC is defined as Containment Presgure >3.5 psig QB Containment 4
Radiation has been at any time 110 R/HR.
' IDSS OF REACTOR COOIANT - SUBCOOIAD RECOVERY DESIRED), Step 1, if EITHER condition listed below occurs:
I
- RCS subcooling (25'F (<75'F ACC)
- PZR level can HQI be maintained >5% (>30% ACC)
- 4. SECG(D&RY INTEGRITY CRITERIA C010 EI-2, (:yAULTED STIAM CINEEATOR ISOIATIW), Step 1, if ElIRIE condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated )
- 5. COLD . LEG RECIRCUIATIM BWITm0'91 CRITERIGf IE RWST level decreases to <48%, IRQi CO TO ES-1.3, (TEANSFER TO COLD LEG RECIRCUIATIM). Step 1.
- 6. AFW SUFFLY SWITMOTER CRITI1IA II CST level decreasea to (9%, IHIH supply AW f rom Service Water by opening M0-3045A and MO-3045B.
1
- 7. MULTIPLE TUBE RUFTME CRITERIA RETURN TO EI-3, (STEAM CINERATOR TUBE RUPTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CMTDfDOUS ACTIM STEFS
- 2. SI Accumulator Isolation
- 4. Verify ..dequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Cs 13 RCP Trip Criteria - Single Pump ES-3.3 Revision 7
_ . . _ _ _ . _ _ _ . . _ . . _ . _ .- . _ . _ . _ . . _ . ~ . . _ _ _ .__ _ _ . _ - - _ . .. . _
STARTING AN INSTRUMENT AIR COMPRESSOR EQIE Equipment is provided locally to perform the-following step.
- 2. II cooling is available~to the Instrument Air Compressor which is to be started. IEEN GO TO Step 3 of this attachment. If cooling is NQI available, IEEN establish fire main cooling to the Instrument Air Compressor which is to be started by performing either a, b, or c.
- a. II the A Joy Air Compressor is to be started, IEEN:
- 1) Attach one-inch hose from Fire Main Drain between Sprinkler Valves (FP-043) and (FP-044) to the Air Compressor Inlet Drain (BC-041).
- 2) Attach one-inch hose to Compressor Outlet Drain (PP-3885A) and route to a suitable drain.
- 3) Shut Bearing Cooling Water Supply Valves (BC-032) and (BC-038) and Return Valve (BC-044).
- 4) Open the following valves:
- Compressor Outlet Drain (PP-3885A)
- Fire Main Drain-
- Bearing Cooling Water Supply (BC-041)
- b. If the' Sullair Air Compressor is to be started.- IEEN:
- 1) Attach one-inch hose from Fire Main between-Sprinkler Valves (FP-043) and (FP-044) to the' Air Compressor Inlet Drain (BC-077).
- 2) Attach one-inch hose;to Compressor Outlet' Drain (BC-078)'
and route to a suitable drain.
- 3) Shut Bearing Cooling Water Supply Valve (BC-073) and Return Valve (BC-076).
- 4) Open the following valves:
- Compressor Outlet Drain (BC-078)
-* Fire Main Drain-
- Bearing Cooling Water Supply-(BC-077) l Attachment 3 Page 2 of 4 ES-3.3 Page 23 of 27 Levision 7
_ - . ~ . . . _ _ _ _ _ _
r REFERENCE PACE FOR ES-3.3
- 1. AIEfINISTIATIVE FUNCTIWS
)
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADFERSE CGtTADWGNT CGIDITIGIS ACCisdefinedasContainmentPresgure>3.5psigQEContainment Radiation has been at any time 210 R/HR.
- 3. SI REE(ITIATIM CRITERIA MANUALLY operate ECCS pumps as necessary AND CO TO ECA-3.1, (SCTR WITH IASS OF REACIDR C001 ANT - SUBCOOLED RECOVERY DESIRED) Step 1, if EITHER condition listed below occurst
- RCS subcooling (25'F (<75'T ACC)
- PZR level can HQI be maintained >5% (>30% ACC)
- 4. SECG(D&5Y INTEGRITY CRITERIA GO 70 EI-2, (FAULTED STEAM CENERATOR ISOIATIGI), Step 1, if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated }
- 5. COLD LEG RECIRCUIATIGt SWITCROFEE CRTTERIGt H RWST level decreases to (48%, IHIH GO 70 ES-1.3, (TRANSFER 70 COLD LEG UCIRCULATIGI), Step 1.
- 6. AFW.SHPPLY_SWITC20fER. CRITERIA H CST level decreases to <9%, IHIH supply AFW f rom Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIPLE TURE RUPTPar CRTTERTA REIURN TO EI-3, (STEAM CENERATOR TUBE RUFTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 6. GmunUQUS ACTION SMS
- 2. S1 Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14% )
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
STARTING AN INSTRUMENT AIR COMPRESSOR
- c. If the B Joy Air Compressor is to be started,- IEEN:
- 1) Attach one-inch hose from Fire Main Drain between Sprinkler Valves (FP-043) and (FP-044) to the Air Compressor Inlet Drain (BC-042).
- 2) Attach one-inch hose to Compressor Outlet Drain (PP-3885B) and route to a suitable drain.
- 3) Shut Bearing Cooling Water Supply Valves (BC-033) and (BC-039) and Return Valve (BC-045).
- 4) Open the following valves:
- Compressor Outlet Drain (PP-3885B)
- Fire Main Drain
- Bearing Cooling Water Supply (BC-042)
- 3. Disable all air compressors which do not have cooling water available.
- 4. Start the desired air compressor by performing the applicable portion of this step:
- a. If the A Joy air compressor is to be started IEEN:
- 1) Close A-501, bus A5 f eeder breaker, to energize bus AS.
- 2) Close A-507, LC B07 transformer high side breaker.
- 3) Close B0712, LC B07 feeder.
- 4) Start the A Joy air compressor.
- b. II the Su11 air air compressor is to be started, IHEN:
- 1) Close A-501, bus A5 f eeder breaker, to energize bus AS.
- 2) Close A-507, LC B07 transformer high side breaker.
- 3) Close B0712 LC '07 feeder.
- 4) Close B0714 to energize Sullair air compressor.
- 5) LOCALLY start Su11 air air compressor.
(
Attachment 3 l' Page 3 of 4 ES-3.3 Page 24 of 27 Revision 7
REFERENCE PAGE FOR ES-3.3
- 1. AIMINIS11ATIVE FGICTIGIS
}
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADFDSE CGfTADGEElff CMDITIGIS ACCisdefinedasContainmentPresgure>3.5psigQEContainment Radiation has been at any time 110 R/HR.
- 3. SI REINITIATIG( CRITERIA MANUALLY operate ECCS pumps as necessary AND GO TU BCA-3.1, (SGTR WITH IDSS OF REACTOR C001 ANT - SUBCOOLED REC 0FIRT DESIRED), Step 1, if EITHER condition listed below occurs:
- RCS subcooling (25'F (<75'F ACC)
- PIR level can HQI be maintained >5% (>30% ACC) 4 SECGtD&RY INTEGRITY CRITERIA GO 10 EI-2, (FAULTED STEAM GENERATOR IS01ATION), Step 1, if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HDI been isolated )
- 5. COLD IAG RECIRCUIATIGl SWITMOTER CRITERIG(
H RWST level decreases to <48%, 'DLEN GO TO ES-1.3, (TRANSFER 70 COLD LEG RECIRCUIATIGI), Step 1.
- 6. AFW SUPPLY ! Win:nuvam URTTERTA IE CST level decreases to <9%, 'DIEN supply AIV f rom Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIFLR Tirar atrPTURE cRT11taTA RETURN TO EI-3, (STEAM GENEEATOR TUBE RUPTURE), Step 1, if EITHER condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGfTINDOUS ACTIG( STEPS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14% '
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
I l
1 l
STARTING AN INSTRUMENT AIR COMPRESSOR I
- c. II the B Joy Air Compressor is to be started. IRE:.
- 1) Place the B Joy air concpressor in OFF. .
- 2) Reset lockout relay 86-B02.
- 3) Place the B Joy air compressor controller in constant and select lead Number 2.
- 5. RETURN TO Frocedure Step in effect.
t I
i l
l Attachment 3 Page 4 of 4 ES-3.3 Page 25 of 27-Revision 7
i REFERENCE PAGE FOR ES-3.3
- 1. AMINISTRATIVE FUNCTIWS }
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EAls)
- 2. ADVERSE CGITADeGNT CMDITIMS ACCisdefinedasContainmentPresgure>3.5psigQEcontainment Radiation has been at any time 110 R/HR.
- 3. S1.REINITIATIM CRITERIA MANUALLY operate ECCS pumps as necessary AND GO TO ECA-3.1, (SGTR WITE IDSS OF REACTOR C001 ANT - SUBCOOLED RECOVERY DESIRED), Step 1 if EITHER condition listed below occurs:
- RCS subcooling (25'T (<75'F ACC)
- 4. SECGNDART INTEGRITY CRITERIA GO TO EI-2, (FAULTED STEAM CENERATOR ISOIATIN), Step 1, if ElIHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated )
- 5. COLD 12G RECIRCUIATIM SWITEROVER CRITERIM II RWST level decreases to (48%, IEEN GO TO ES-1.3, (TRANSFER 70 COLD LEG RECIRCUIATIW), Step 1.
- 6. AFW SUPPLT SWITCROFER CRITERIA IE CST level decreases to <9%, IHEN supply AW from Service Water by opening M0-3045A and MO-3045B.
- 7. HULTIFI2 TUBE RUPTURE CRITERIA RETURN TO RI-3, (STEAM CINERATOR TUBE RUPTURE), Step 1, if ElIEEE condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnonnal radiation
- 8. C M TINUOUS ACTI M STEPS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
- 9. RUPTURED S/G NR Level >14%
- 11. Control RCS Makeup And Letdown To Maintain PZR Level
- 12. Depressurice RCS To Bt.ckfill From RUPTURED S/Gs
n 6 fE '
?
-: =
5
- d \\' ]
x\ $
hs \\\ X E s \A A4 k<dh' \\\\\N I l
.c 4 \ k l
x\\
t [l
' ' x x Lo 3 MN N%,%\}\\W d'E \s \'\sk Qs\\\ l k j s11 r kN\\ sh\'4x' i -
0
~
\ ~ '
C N
.2 - - - - - - - -
o o
8 8 o o 8 g o o 8 8g $
~ O h "'
- y a
~ 2 2 @ 8
~ wxg =
a SEAL DIFFERENTIAL PRESSURE - psig
l i
REFERENCE PAGE FOR ES-3.3 i l 1. AIEMISTRATIVE FGtCTIGtS }
- Monitor CSF Status Trees
- Monitor Emergency Action Levels (EALs)
- 2. ADVERSE CGtTAIletENT CGEDITIGtS ACC is defined as Containment Presgure >3.5 psig QE Containment
! Radiation has been at any time 210 R/HR.
l
- 3. SI.EE RJTIATIGi CRITIBIA MANUALLY operate ECCS pumps as necessary AND GO TV ECA-3.1, (SGT1 WITH LOSS OF REACTOR C001 ANT - SUBC00 LED RECOVERT DESIRED) Step 1, if EITHER condition listed below occurs:
- RCS subcooling (25'F (<75'F ACC)
- PZR level can HQI be maintained >5% (>30% ACC)
- 4. SECGIIERT INTEGRITY CRITILIA GO TO EI-2, (FAULTED STEAM GENERATOR ISOLATIGI), Step 1, if EITHER condition listed below occurs:
- Any S/G pressure is decreasing in an uncontrolled manner and has NOT been isolated
- Any S/G is completely depressurized and has HQI been isolated I
- 5. COLD LEG RECIRCUIATIM SWITMQUR CRITERIG(
H RWST level decreases to <48%, IEN GO To ES-1.3, (TIANSFIR TO COLD 12G RECIRCULATIGI), Step 1.
- 6. APW SUPPLY SWITCROVER CRITERIA E CST level decreases to <9%, IEN supply AW from Service Water by opening MO-3045A and MO-3045B.
- 7. MULTIFI2 TUBE RUPTDRE CRITERIA RETURN TO EI-3, (STEAM GENERATOR TUBE RUPTURE), Step 1, if EITHER l condition listed below occurs:
- Any INTACT S/G 1evel increases in an uncontrolled manner
- Any INTACT S/G has abnormal radiation
- 8. CGtTINDOUS ACTIGt BTEPS
- 2. SI Accumulator Isolation
- 4. Verify Adequate Shutdown Margin
- 5. INTACT S/Gs Level And Total Feedflow
)
- 9. RUPTURED S/G NR Level >14%
- 11. Control RC3 Makeup And Letdown To Maintain PZR Level
- 12. Depressurize RCS To Backfill From RUPTURED S/Gs
RC: D_ _5_ 1.
00R: Omerattent
- QA RECORD WHEN COMPLETED *** CFP: POW $T OP 2.2.2 Letter No. N/A
$ystem No. N/A No. of Pages:
RCS COOLDOWN DATA Docueent Date:
Reference:
RC$ Cooldown Data [1.3.3
- 1. Record the following data, every fifteen minutes, during the RCS cooldown:
RCS WR COLD LEG TEMP RCS RCS PRESS C00LDOWN TIME TE- TE- TE- TE- RATE FIR- PI-413B 423B 433B 443B (*F/hr) 405 403 Approved: Date:
Shift Manager Attachment 5 .
l- Page 1 of 1 ES-3.3 Page 27 of 27 t,
, Revision 7