Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000382/LER-1985-020, :on 850518,at 25% Power,Reactor Trip & Emergency Feedwater Actuation Signal Occurred.Caused by Low Water Level in Steam Generators.Sys Stabilized in Mode 3. Backwash Cycle Tested on 850520 + (21:41:49, 12 December 2024)
- ML20127F829 + (21:41:50, 12 December 2024)
- ML20127F828 + (21:41:51, 12 December 2024)
- IR 05000397/1985016 + (21:41:52, 12 December 2024)
- IR 05000438/1984021 + (21:41:53, 12 December 2024)
- ML20127F821 + (21:41:53, 12 December 2024)
- 05000293/LER-1985-005, :on 850221,rod Block Monitor Functional & Calibr Surveillance Tests Identified as Having Exceeded Required Test Interval.Caused by Personnel Error.Tests Performed & Personnel Counseled + (21:41:56, 12 December 2024)
- ML20127F812 + (21:41:57, 12 December 2024)
- ML20127F811 + (21:41:58, 12 December 2024)
- ML20127F810 + (21:41:59, 12 December 2024)
- IR 05000261/1985013 + (21:42:00, 12 December 2024)
- ML20127F804 + (21:42:01, 12 December 2024)
- ML20127F807 + (21:42:01, 12 December 2024)
- ML20127F799 + (21:42:02, 12 December 2024)
- ML20127F798 + (21:42:03, 12 December 2024)
- ML20127F796 + (21:42:04, 12 December 2024)
- ML20127F794 + (21:42:04, 12 December 2024)
- 05000413/LER-1985-034, :on 850515,diesel Generators 1A & 1B Experienced Invalid Automatic Start Following Detection of Undervoltage Condition on Essential Switchgear.Caused by Transmission Sys Disturbance + (21:42:06, 12 December 2024)
- ML20127F790 + (21:42:07, 12 December 2024)
- ML20127F785 + (21:42:08, 12 December 2024)
- ML20127F784 + (21:42:10, 12 December 2024)
- ML20127F782 + (21:42:11, 12 December 2024)
- IR 05000255/1985012 + (21:42:11, 12 December 2024)
- ML20127F779 + (21:42:12, 12 December 2024)
- ML20127F778 + (21:42:13, 12 December 2024)
- PY-CEI-NRR-1597, Monthly Operating Rept for Dec 1992 for Perry Nuclear Power Plant + (21:42:14, 12 December 2024)
- IR 05000338/1985001 + (21:42:15, 12 December 2024)
- ML20127F771 + (21:42:16, 12 December 2024)
- ML20127F770 + (21:42:16, 12 December 2024)
- IR 05000348/1985019 + (21:42:17, 12 December 2024)
- ML20127F767 + (21:42:18, 12 December 2024)
- ML20127F761 + (21:42:19, 12 December 2024)
- ML20127F764 + (21:42:19, 12 December 2024)
- ML20127F760 + (21:42:20, 12 December 2024)
- ML20127F759 + (21:42:21, 12 December 2024)
- ML20127F755 + (21:42:22, 12 December 2024)
- ML20127F754 + (21:42:22, 12 December 2024)
- 3F0193-09, Forwards Revised Monthly Operating Rept for Nov 1992 for Crystal River Unit 3,updating Items 11 Through 13 of Operating Data Rept + (21:42:23, 12 December 2024)
- ML20127F745 + (21:42:24, 12 December 2024)
- ML20127F742 + (21:42:25, 12 December 2024)
- ML20127F740 + (21:42:26, 12 December 2024)
- ML20127F736 + (21:42:26, 12 December 2024)
- ML20127F734 + (21:42:27, 12 December 2024)
- ML20127F732 + (21:42:28, 12 December 2024)
- ML20127F728 + (21:42:29, 12 December 2024)
- RBG-38014, Monthly Operating Rept for Dec 1992 for River Bend Station, Unit 1 + (21:42:30, 12 December 2024)
- IR 05000223/2003022 + (21:42:31, 12 December 2024)
- U-602087, Monthly Operating Rept for Dec 1992 for Clinton Power Station,Unit 1 + (21:42:32, 12 December 2024)
- ML20127F720 + (21:42:33, 12 December 2024)
- ML20127F719 + (21:42:34, 12 December 2024)
- ML20127F714 + (21:42:35, 12 December 2024)