Text
.
i.,
OPERATING DATA REPORT DOCKETN0l 50-613 DATE January 15. 1993 FERATING STATUS
' COMPLETED BYR.A. Willians TELEFHONE 704-382-5346
).UnitName: Catawba 1
- 2. Reporting Feriod: Decester 1,19??-Decester 31,1992
- 3. Licensed Thereal Power (HWth 3411
- 4. Nameplate Rating (Gress MWeh 1305t Notes tNameplate Rating
$. Design Electrical Rating (Net MWeh il45 (Bross MWel calculated as
- 6. Marious Dependable Capacity (6 toss MWe):
1192
'1450.000.MVA x.90 power
- 7. Maximus Dependable Capacity (Net MWeh
!!E9 factor per Page lii,
- 8. If Changes Cccur in Capacity Ratings (Itess Nusber 3 Through 7) Since Lass NURES-0020..
Repet t. Give Reasons
- 9. Power level le Which Restricted, if Any (W c MWah
- 10. Reason For feestrictions, if any:
This Month Yr.-to-Date Cuaulative
-11. Heur: In Reporting Period 744.0 8784.0
~65833.0
- 12. haber Of hours Reactor Was Critical 744.0 6396.4 45786.6
-13. Reactor Reserve Shutdoan Hours
--0--
--0--
~--0--
t-
- 14. Hours Benerator On-Line 744,0 6339.9
-47734.0 15; Unit Reaerve Snutdown Hours
--0--
--0 --
~0--
[i6.GrossThermalEnergyGenerated(MWHI 2515031
- 21050503 154536908
- 17. Gross Electrical Energy Generated (MWH) 90075
7455815-54325219 DB. Met Electrical Energy Benerated (MWH) 855709 7031547 50965241
- 19. Unit Service Factor 100.0 72.2 72.5 20;UnitAvailabilityfactor 100.0 72.2 72.5:
- 21. Unit Capacity factor (Using CC Net) 101.9 70.9 60.3 22; Unit Capacity Factor (Using CER Net)
-100.5 69.9-67.6
- 23. Unit Forced Outage Rate 0.0 0.1 11.1-
- 24. Shutdcun Scheduled Over Next 6 Nonths (Type, Date, and Duration of Eachh None p
y
'25. If Shut Ocun At End Of Repcrt Perled. Estisated Date of Startupt
-26; Units in Test Status (Prict to Ceasercial Operaticch.
Forecast
-Achieved
-lNITIAL CRITICALITY--
--INITIAL ELECTRICITY COMMERCIAL OPERATION 9301210016 930115 PDR ADOCK 05000413 R
~
= _ _ _ _ -
2:*
OPERATINGDATAREFORT DDCKET NO -
50-413-UMli Catawba 1-DATEinniinry i s. 1993 COMPLElEDBY R.A. Willians TELEFfl0NE ' - 704-38?-5346 '
p
-MONTH Decenter,1992 QQ AVERASE DAILY FDWER LEVEL EQ-AVERASE DAILY POWEll LEVEL i
(MWe-Net)
(MWe-Net) l!
I' 1151 17 1146 l
2 -'
1151 18 1153 J
3 1151 19 1155 I
4-1045 20 1152 f;
5 1150 21
-1156
~6 1153 22 1154
'7 1152 23 1148 '
J 8-t153 24
!!54 4
iy I-'
9 1156 25 1157-
. 10.
1159 26
!!56 f.
115B 27 1156-I
-LE 1157-28 1154 13'
-1157 2r 115e h-14
'1156 30
'1154 -
- 15 1154 31 1152 16 1153 -
j; I
l:-
p
-L !
~
-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME ~ CATAWBA 1 DATE ul/1d/93
' REPORT MONTH December 1992 COMPLETED BY N.
C.
51MMUNS TELEPHONE t/04)-Juz-bZbJ (1).
- 2) g_
(4)
(5)
E HOD T
A OF LICENSE N
Y' S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE t
ll-P 92 4 F
A IIA FILTER TURBINE CONTROL OIL PRESSURE DECREASE t
i (1gForced (2
(3 (4gxhibitG-Instructions
' eason-ethod:
A-Equi ment FailureB-Main enance or test (Explain)
S Scheduled 1-Manual for PreDaration of, Data 2-Manual Scram Entry Sheets For Licensee.
C-Refueling 3-Automatic Scram Eyent Report'(LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-Ol61)
E-Operator Araining & License Examination 1
F-Administrative (5)
H-Other (Explain) (Explain)
G-Operator Err 9r Exhibit I - Same Source r
= - --N
I
.l
+,.
4 c
l DOCKET: 50-413.
UNIT: Catawba 1 Date: : 01/15/93 NARRATIVE
SUMMARY
7 MONTH: December 1992 Catawba Unit 1 began the month of December operating at 100% full power. The unit operated at or near 100% full power until 12/4 when the unit commenced a load decrease.. The unit held at 75% power frorn 0401 to 1036 due to turb!no control oil pressure problems. The unit v'as returned to 100% power at 1725.
The unit operated at or near 100% full power for the remainder of the month.
+
Prepared by N. C. Simmons -
Telephone:' 704-382-5263-l-
9 MONTHLY REFUELING-INFORMATION RECUEST-1.
Facility name:-Catawba.
Unit 1 2.
Scheduled next refueling shutdown: October 1993-3.
Scheduled restart following refueling: January 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMCIICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter. require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in design or new operating procedures).
7.
Number of Fuel.assemblics (a) in the core: 193 (b) in the spent fuel pool: 408 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by.
present licensed capacity: -September 2009-DUKE POWER COMPANY DATE:
January 15. 1993 Name.of
Contact:
N.
C.
Simmons-Phone:
704-382-5263
>__.__..._.-_._.__._._m
. - ~
?
s h
DFERATING MIA FEPORT t
DDCKEI N0 Jg0-414 NIElanuary 15. 1993 _
QMFA11NS $1AIV$
EQMFLETED BY,,, P.A. Willi n s TELEPHONE 704+3BP-53a6 l
- 1. L' nit hee C.tamba 2 j
2.ReportingFeriod Datester1,1992-Detester 31,1992 e
- 3. l.icensed thersal Foser (MWth 3411
- 4. Naseplate Pating (Stoss MWeh 13058 Notes eWateplate Rating
- 5. tesign Electrical Rating (Net MWe):
1845 (6rossMWelcalculatedas l
6.ManisuspependableCapstity(6tessMWe):
1192 1450.000 MVA
.90 power
- 7. Ba 1 sus Dependable Capacity that MWel 1129 factor per Page lit,
- 9. If Changes Occur in Capacity Rattrigs (Itess Musbtr 3 through 7) Sihte tant NURE6 0020.
Report ilve F4easons,
L Power level 16 Which Restricted, if Any (Net MWe):
10.ReasonforRestrictions,'fany:
.t This Month Yr. to-Date Cuaulative t
- 11. Hours In Reperting ferica 744.0 8704.0
$$849.0 12, Wester Of Hours Reactor Was Critical 659.5 B348,8 42646.4
- 13. Reactor fieserve Shutdown M rs
--0 ~
-+-0--
--0--
- 14. Hours Generaior On-Line 648.0 B292.4
-41845.6 3
- 15. Unit Reserve Shutdoun Hours
-0 ~
--0
- ~
16, Gress Iternal Energy Generated (MWH) 2101088 27564969 132691146
- 17. Gross Electrical. Energy Generated (MWH) 746557
'9785070 46960975 t
.18. Net Electrical Energy Generate 1 (Mt!HI 704240 9273457 44127326
- 19. Unit Service Factrr 87.1 94.3 74.9-20._ Unit Availat.ility Fatter 87.1 -
94.3-74.9
- 21. Unit Capatity factor (Using M!tC Net) 63.8 93.5 69.9
- 22. Unit Capatity Factor (Using OfR Ret)
B2.7 92.2-69.0
.l g
- 23. Unit forced Outage Rate.
12.9 1.6 11.1
- 24. Shutatun Scheduled Over West 6 Months (Type, Date, and Duratten of Eachl:
l
- n,.rnalin g-n nii m an; 1993 - 68 ctnyx
- 25. If Shut Denn At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Coakercial Operationit.
Fcrecast Achieved l-IN!!!AL CRiflCAl.lTV
_ INITIAL ELECTRIC!Ty COMMERCIALOPERATION I:
I I
h
., ~.. _,,,.,
..--..,,..,,_-e._.-,..
..-.....s
I
. t 0FEEA11NS DATA REF0Ai I
- D0ttEl h3 50-414 LNii _,,,,(AD 4a 2 DALE lanuar% l.i J993 COMPLETEDBV R.A. Willi m l
iflEPHONE,,_704 30P 5346 l
-r M IN DMeeter.1992 d
BJ, AVERAGEDAILYF0dERLEVEL MJ, AVIEAGEDAILYPOWERLEVEL Gse het)
UWe Net) 570 17 0
2 790 18 18 3
1131 19
- BB?
4 115,7 20 1151 5
111) 21 1156 6
1154 P2 1153-7
!!50 23
~1147 8
1149 24 1156 r
9.
1153 25 1157 10 1142 26 1156 11-1124 27 1157 r
(2 1143 25 1155 13 -
1t59 29 1153 14 735 30 1153 1
15 -
0-31 1152
- 16 0
l-9 w'v. wh9,c', --
5--,--,
y e--
,em<=r,
.r-emy..m.-
u v
-r
. +..
-v>=m 3'-
m,
=v e.
e
-y y-
.-q
%=r w--
r
^
UNIT SHUTDOWUS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME CKIAwria z 1
DATE 01/1d / 9 3 i
REPORT MONTH December 1992 COMPLETED BY u.
c.^ simvied t
TELEPHONE tsus)-362-326; (1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COHPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 15-P 92 1 S
B IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION 16-P 92 1 S
B IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION 17-P 92 1 F
B HF FILTER
'2A' COOLING TOWER SCREEN CLEANING S
92-12-14 F
48.00 H
3 HH HTEXCH REACTOR / TURBINE TRIP ON LO-LO STEAM GENERATOR LEVEL DURING FEEDWATER TEST 6
92-12-16 F
48.05 D
HB HTEXCH CRITICAL PATH CHANGED TO STEAM i
GENERATOR POWER OPERATED RELIEF VALVES BEING RETURNED TO SERVICE (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equihnent Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or tesu 2-Manual Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram Report (LER Evenu (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File 2
E-Operator Araining & License Examination F-Ahinistrative (5)
G-Operator Error (Explain)
Exhibit I - Sane Source d-Other'(Explain) l 4
i 4
-+
3 w
=
-n
-w r
DOCKET: 50-414 UNIT:
Catawba 2 Dato:
01/15/03 NARRATIVE
SUMMARY
MONTH; Decernbor 19u2 Catawba Unit 2 began the month of December at 14% power. The unit remalnr.J at 14% power until 0024 for nuclear instrumentation calibrations. During puxor escalation, the Unit hold at 20% power from 0434 to 0810 for nuclear instrumentation calibrations. During power oscalation, the unit doctcased at 1911. The unit hold at 70% power from 2120 to 12/2 at 2153 for ricroon cleaning on tho *2A' cooling tower. Tho unit reached 100% power on 12/3 at 0555, The unit exporlonced a reactor /turbino trip on 12/14 at 1534 on stcam generator Lo-Lo level dt. ring a feedwater pump test. The unit tomalnod off-line until 12/18 due to both steam generator power oporr. tor relief valvos being out of service at the time of the trip and one of the two were required to restart the unit. The unit was placed on-lino on 12/18 at 1537 and reachod 100% full power on 12/19 at 1725. The unit operated at or near 100% full power for the romalnder of the month.
Prepared by N. C. Simmons Tolophone: 704-382-5263
liq 11IliliLREGELING INFORMATIO!! REQUEST 1.
Facility namos Catawba.
Unit 2 2.
Scheduled next refueling shutdown: January 1993 3.
Scheduled restart following refueling:,_ April 1993 r
T!!E PROJECT MANAGER !!AS DEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.G.
Cl!ANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 Ti!ROUGil 6 WILL NO LONGER BE MAINTAINED IN TilIS REPORT.
4.
Will refueling or resumption of operation thereaf ter requiro a technical specification change or other licenso amendment?
D If yes, what will those be?
I If no, has reload design and coro configuration boon reviewed by Safety Review Committoo regarding unroviewod safety questions?
D.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (now or different design or-
- supplior, unroviewed design or performance analysis methods,-
significant changen in design or now operating proceduros),
t 7.
Number of Fuel assemblion (a) in the core 191
'(b) in the spent fuel pool PaQ
[
8.
Prosent licensed fuel pool capacity: M1.Q Size of requested or planned-increases -
9.
Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE:
January 15, 1993 Name of
Contact:
ll. C. Simmona Phone:
704-382-5263 i
l