Text
- _ _ -
OkiFMIN5 LMf1 FEP0fi DDCIET ND 5 H 69 141E Z w ry I k 1993 ggtr.1[O Stug5 00Ki1ETEDEV F.A J11]jle1 _
t TELEfH3NE 704-3?M3%
- 1. Unit Name: EGuire 1
- 2. Feperling Fer st d: Leceste# 1, 19924 etesber 31, 19??
- 3. Litenus Iternal Ft.er (Nt):
3411 4, hateplate f attrg (Gitas Nel:
13?9 htes INaseplate Paling
- 5. Design llettittel Retirg (Net Ne):
1100 (Gross W e) talculated as
- 6. Patinut tepr.datle Capttty (Lit 4s Ne):
1171 100.000 NA r.90 purr 7, Martaum Def endable Captity (Net Ne):
1129 fatttr p r Page 111
- 9. l' Changes Ottur in Capacity 4 tings (lties tLeter 3 Through 7) Since Last U ES 0020.
Repcrt. Give Te w s:
h fuer Ltwel 10 Whitt Festricte1, If Any (Net Na):
- 10. Feason f or Festr ic tlins, If ar>yi This Mct:th VI.-tt44te Cumulative
!!. Huri In Pepttir,g f eritd 7%.0 8724.0 97176.0
- 12. k2er 3f Heurs feactor Was Crittral 7H.0 6962.7 tE856.2
- 13. Leactor fieserve Shutaan Mrs -
--0-- -
- 14. Hours Generater On L;te 7%.0 6041.6 60122.5
- 15. Unit heur we Shutet. a Hours
--0--
-- 0 -- 16. Crcss Theraal Energy Generated (M) 25Ed99 227E83B0 20977%41 l
- 17. Grcss Electrical Energy Generated (NW B77077 7B15505 72175330
- 10. Het Electrical Energy Beherated (NM 64 03 7495262 69916335 li ' Unit Service Fa: tor 100.0 77.9 70.1
- 20. Unit Availatility f atter 100,0 77,9 70,1
- 21. Unit Ca;:4tity fatter (Ustng MDC het!
100.5 75.5 61.6
- 22. Unit Capcity f atter (Using Dik Net) 96.2 72.2 60,1
- 23. Unit forced Cuta0t Rate 0.0 22.1 13.6 24, 5%tdtwn Bctehlea Over Next 6 enths (lyn, Date, and hration ef f acMi
_ Re[uelinn - March 12 1993 - 84 dayn
- 25. If Shet han At End Of Leport brica. Estieated Date of Startup:
- 26. Units in Test Statn (frier to Ceasercial Operation):
Forecast khleved INITIAi.CFillLAllii INITIAL ELECTRICliY COMl'<.CI AL CPEF$110N 9301210011 930115 PDH ADOCK 0D000369 R
DFEEAllNS 0ATA REf0k1 DOCIET ND
$0-369 UNIT M: Suite i DATEJanuarv 15. 1993 COMPLEilD By P. A.Jillian TELEFHONE 704-3025M6 M0hiH
- H elter. 1992 (11 AVERAGE DAILY POWLR LEVEL LA1 AVffABEDAILYF0WERLEVEL (Ne-Net).
(MWe-Net)
I 1136 17 1139
-2 1136 10 1140 3
1079 19 1139 i
4 1136 20 1140 5
--1139 21 1139 6
1139 22 1139~
7 1139 23 1140 8
1139 24 1139 9
1137 25 1139 10 1137 26 1140 113B 27 1139
-~
12 1139 28 1139 13 1139 29 1139 Ii 14 1139 30
!!39-l:
15 1139 31 1140 L
16 1139 l.
. ~.,. -.... -.
UNIT SHUTDOWNS AND POWER REDUC ~ IONS DOCKET NO.
50-369 UNIT NAME HCou t h t.
1 DATE 01/19/93 REPORT MONTH Decenber 1992 COMPLETED BY -~TI.'C.
d imsv:45 TELEPHONE
(/v4)-362-5z63 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS
- N R/X NO.
CODE CODE PREVENT RECURRENCE 17-P 92 3 S
B HB VALVEX CONTROL VALVE MOVEMENT TESTING l
l (1)
(2)
(3)
(4)
Method:
Exhibit G - Instructions F Forced Reason-S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entn* Sheets For Licensee (NUREG-Ol61))
Event Reoort (LER 3-Autonatic Scran C-Refueling 4-Other (Explain)
File D-Regulatory Restriction E-Operator training & License Examination (5)
F-Administrative Exhibit I - Same Source G-Operator Error (Explain)
H-Other (Explain)
)
l DOCKET: 50 309 UNIT:
tAcGuiro 1 Dato: 01/15/03 f4ARRATIVE SU!AfAARY fAOf4TH: December 1992 lAcGuiro Unit 1 began the month of December operating at 100% full power. The unit operated at or near 100% full power until 12/3 at 0950 whon the unit commenced a load decrease. The unit hold at 78% power frorn 1503 to 1935 for a control valve movement test. The unit returned to 100% on 12/4 at 0135. Tho unit operated at or noar 100% full power for the romainder of the month.
Prepared by N. C. Simmons Tolophono: 704-382-52G3
~
ligl[IllLY REFUELTilG INFORMATION REQUEST 1.
Facility name:-_McGuire.
Unit 1 2.
Scheduled next refueling shutdown: March 1993 l
3.
Scheduled restart following refueling: June 1993
{
TIIE PROJECT MANAGER !!AS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CIIANGE OR LICENSE AMENDMENT.
THEREFORE, QUESTIONS 4 TIIROUGli 6 WILL NO LONGER BE MAINTAINED IN TilIS REPORT.
4.
Will refueling or resumption of operation thereaf ter require a 1'
technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (now or different design - or
- supplier, unreviewed design or performance analysis
- methods, significant changes _in design or new operating procedures).
7.
Number of Fuel assemblics (a) in the core: LU (b) in the spent fuel pool: 519 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:
January 15, 1992 Name of
Contact:
N.
C.
Simmons Phone:
704-382-5263
)
?
i m~~
m.mmm.,.--u
.-w,wi e.--
w.
,,rw..c.
..,,-w-,%,-,,c, e.
.-...-w w
.m-.
,U,e
,e N,.r miv..n
.wy.,-r
,ww,,
,--g
l l
OFEF ATING LATA FEFD?f DDtlEl ND 50-370 LAT[ MV.!rn[5,1993 MjMj,LJiq LUMillEDIV R.A. Willl111_
TELEPHONE,704-3924346
- 1. Unit hate: P i tre i
- 2. Reprttig feried Detester 1, 199 M etester 31,1992
- 3. Littised itersal Foner t%ti 3411
- 4. Nase; late httrig (Gross Nel; 13 % 4 Notes #Nastplate Patitg
- 5. Cettp Electrical Rating (het Nr):
1180 (Gross MWe) talculated as
- 6. Movie:s teprcable Ca;auty Gross Ne):
1171 1450.000 PVA x.90 peer
- 7. Faxieas Depet.dable Capa: tty tNet Phe):
1129 fatter per Page tal, B. If Ct an;es Occer ir, Ca;6: tty Ratir.p titess Nutter 3 thrngh 7) Since Last NURES-0020.
Fep rt. Give Feasons:
- 9. Ptwer Leetl 10 Which Festricted, if Any (Net Ne):
- 10. Feason Ftr Festrictions, If any:
This Nnth Yr.-to-tate Cumulative
- 11. Hars In Feartin; Ferted 744,0 8784.0 77472.0
- 12. Naaber Of Hours Featter Was Critical 744.0 6214.9 59416.4
- 13. Reacttr Reserve Shutdc=wn Heurs
--0--
--0--
--0--
- 14. H ats Generator On-Line 744.0 6144.2 58497.1
- 15. Unit Feurve Shutdenn Hars
--0--
--0--
0--
- 16. Bross Thermal Energy Bererated (NH) 2533105 20311126 191407556
- 17. Gren Electrical Energy Cenerated (NH) 891063 70B8786 66919701
- 18. Wet Electrical Energy Becerated (N41 B57762 67BM34 64160965
- 19. Unit Service Fatter 100.0 70,0 75.5
- 20. Unit Availatility facter 100.0 70.0 75.5
- 21. Uutt Capacity factor (Ustng GC Net) 102.1 69.4 72.4
- 22. Unit Captity Factor (Using DER Net) 97.7 65.4 70.2
- 23. Unit Forced Cutage Cate 0.0 3.7 7.6
- 24. Shutdown Sche hled Over hest 6 k nths (Type, tate, and Duration of Each):
None
- 25. If Shut Dean At End Of Reprt Feriod. Estimated Date of Startupt
- 26. Units In Test Status (Frier to Ccteercial Operationi:
Forecast Achieved g
IN!ilALCft!11CAllTY IN111AL ELECTRICITY C091MI A!. 0?EM11DN 1
I l
-)
4 OPERA 11N6 DATA AEFORT 7
DOCrti ND 50-170
)
UN!!_
McGuire 2 _.
DAtt 2;Lnua ry. 15. 1993 COMPLETEDBY P.A. Willi m TELEPHONE 7044P24346 7
f E Nill _ _IfHiber. 1972
-r t
LA,Y AVERASE DA!LY PDWER LEVEL LA1 AVERAGE DAILY F0WER LEVEL (MWe-Neu (MWe Net) 1 11 11 17 1154 2
1151 19 1153 3
!!}2 19 1152 t
4 1152 PO 1153 1152 El 1153 6
1152 22 1154 I
7 1152 23
!!55 8
1152 24 1154 i
9 1152 25 1153 l
10 -
1152 26 1154
- 11 1153 27 1153 l.
l
-12 1153 29 1153 13
!!53 29 1154 l
14 1153 30 1153
-15 1153-31 1154
.16 1153 c
a l
L
._..._..._..u-,
-,. ___ u.- _....- _...._,.
...~.....a.
_.. -. - - -,. -, ;,,. -. J:
.2.,
_. -. a : ;.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 i
UNIT NAME n u,u 1 H r. 2 DATE vif A d/ 9 3 i
REPORT MONTH December 1992 COMPLETED BY Id.
C.
s1MMUI4d l
TELEPHONE (4041-362-dz6; (1)
R)
(3)
(4)
(5)
(2 MET-i l
E HOD I
T A
OF LICENSE
.N Y
S SHUT EVENT SYS-CAUSE AND CORRECTIVE i
I O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE i
NO SHUTDOWNS OR REDUCTION S l
l l
l 1
b I
I l
z (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions i-S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain)
File (NUREG-Ol61))
E-Operator Training & License Examination F-Administrative (5)
H-Osher (Explain) (Explain)
G-Operator Error Exhibit I - Same Source l
r 4
e i
- DOCKET: 50-370 UNIT:
McGuiro 2
)
Date: 01/15/93 NARRATIVE
SUMMARY
MONTH: December 1992 McGu!ro Unit 2 began the month of December operating at 100% full power. The unit operated at or near 100% full powei for the ent!ro month.
t Prepared by N. C. Simmons -
Telephone: 704 382-5263 5
-,$v-4-
l',,a
+. ', -.
,v,L,
,wr,,,
,w, y
,-~n,-e,v,-m-
,e,
,--,w
+n, m ----,i,,,,,
- .,n--
e
,e>.
wa.,,p---nwA,.:, --
-r -,n-sw
liQNTHLY REFUELIllG INFORMATION REQUEST F
1.
Facility name:_McGuire, Unit a
'2.
Scheduled next refueling shutdown: July 1993 3.
Scheduled restart following refueling: Sentember 1993 Tile PROJECT MANAGER !!AS BEEN ADVISED BY SEPARATE COMMUNICATIO!! OF ANY T.S.
CilANGE OR LICENSE AMENDMENT. TilEREFORE,
QUESTIONS 4 TilROUGli 6 WILL NO LOllGER DE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in design or new operating procedures).
Number of Fuel assemblies (a) in the core: J33 (b) in the spent fuel pool: 741 8.
Present licenned fuel pool capacity: 1A61 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 i
DUKE POWER COMPANY DATE:
January 15, 1993 Name of.
Contact:
11.
C.
Simmons Phone:
704-382-5263-
..l...--.-----
n,
- m,-,,.v.-,w w~,~w.-r,.wmma
~~.e-.w.-ne.
g
-r
.,+-~v.mn++
v-,'m-