0%.s\

.

APR 2 31985 -

-

Carolina' Power and Light Company

' ATTN: Mr. E. E. Utley

' Executive Vice president

Power Supply and Engineering.

and Construction

-411 Fayetteville Street

Raleigh, NC 27602-

,

Gentlemen:

SUBJECT: REPORT NO. 50-261/85-13

On March 11 - April 10,1985, NRC inspected activities authorized by NRC Opera-

ting License No. DPR-23 for your H. B. Robinson facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative ' records, interviews with personnel, and observation of activities -

in progress.

Within the scope.of the inspection, no violation or deviations were identified.

.Should you have any questions concerning this letter, please contact us.

Sincerely,

h5/

David M. Verre111, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/85-13

cc w/ enc 1:

G.' P. Beatty, Jr. , Manager

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager-

bec w/ enc 1:

NRC Resident Inspector

Document Control Desk

State of North Carolina

RII -

RII

n:cdg PF ickson

04/;q/85 04b3 /85

.

8505200500 860423

PDR ADOCK 05000261

G PDR .

[ [d/l i