T.S.6.9.1.6

~

PIIILADELPIIIA ELECTRIC COMI%NY 3937004390 LIMER]CK GENERATING STATION P. O. BOX 2300 SANA 1DGA, PA 19464-2300 (215) 327-1200. EXT, 3000 January 14, 1993 DAg$,yE Docket Nos. 50-352 uuemcx cenensrino srAron 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Contro.1 Desk Washington, DC 20555

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports [or Limerick Units 1 and 2 for the month of December, 1992 forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, i s KWM/dtc

(

Enclosures cc: T. T. Martin, Administrator, Region I, USNRC (w/ enclosures)

T. J. Kenny, .USNRC Senior Resident Inspector LGS (w/ enclosures) l i

i 9301210024 921231 PDR -ADOCK 05000352 R PDR /i P{

g

. . .. -.- _ _ -.- ..- - . . - - - =.. . - . - - - - - . - . . - . -

3937004390

)

Docket No. #50-352-

} Attachment to Monthly

j. Operating Report for i December 1992 i

i j LIMERICK GENERATING STATION 4 UNIT 1 j DECEMBER 1 THROUGH DECEMBER 31, 1992 i

j I. NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES Limerick Unit 1 began the month of December at a nominal 100%

of rated thermal power. On Sunday, December 6, reactor power

{

was reduced to 90% for control valve testing and restored the

! same day. On Friday, December 11, a one hour report to the NRC was made for the loss of meteorological tower data and the loss of approximately 50% of the EPZ sirens due to adverse j weather conditions. -on Saturday, December 12, reactor power j was reduced to 44.3% to change out the Reactor Recirculation j Pump Motor Generator set brushes; power was restored to 100%-

j on December 14. On Thursday, December 31, per the load 4 dispatcher's request, power was reduced 100 MWe due to excess l generating capacity. Reactor power was restored to 100% of l rated on the same day. Unit 1 ended this cperating period at a nominal 100% of rated thermal power.

J i

4 i

j II. CHALLENGES TO MAIN STEAM SAFETY RELIEF VALVES

There were no challenges to the Main Steam Safety Relief 4 Valves during the month. ,

l i

4 i

e

, oprtgex1 i-i.

i 4

8 4

i i

-ey . . - . . ~ , ,, g ,--.7,y wis -, ,.o,,,, . , www--+--,env---i--.m--..--e m.<v

AVERAGE DAILY UNIT POWER LEVEL - * .

4 DOCMET NO. 50 - 352 UNIT LIMERICK UNIT 1

'DATE JANUARY 14, 1992 COMPANY PHILADELPHIA ELECTRIC COMPANY MARL MECK REPORTS SUPERVISOR BUSINESS UNIT

.LIMERICF. GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 1

MONTM DECEMBER 1992

' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (uwE-NET) 1 1057 17 1055 5 2 1050 18 1056 3 1055 19 1055 4

4 1050 20 1055

^

5 105t 21 1058 6 1038 22 1054 g 7 1049 23 1062 8 1050 24 1043 9 1047 25 1066 10 1044 26 1055 11 1040 27 105e 12 536 28 1066 13 954 29 1051 4

5 14- 1020 30 1051 15 1056 31 1032 16 .1057 l

4 4

4

. . , _ _ .__ _ . . , . _ . -__ . _ . _ . _ _ _ _ _ _ . _ _ . . _ , .. .,m.__ . _ - . _ . . ____ _. . .._ _ .. _ ... _ - _ ...__ ..__ .. _ . . . . .. _

1 OPERATING DATA' REPORT ) * -

l DOCFET NO. 50 - 352 -

4 DATE JANUARY 14, 1992 i

COMPLETED BV PHILADELPHIA ELECTRIC COMPANY kARL MECK

- REPORTS SUPERVISOR BUSINESS UNIT ,

LIMERICK GENERATING STATION i TELEPHONE (215) 327-1200 EXTENSION 3320

' OPERATING STATUS' 1 UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WAS ONE LOAD DROP i

__..________... . _ __ _ ..___.._ j

2. REPORTING PERIOD: DECEMBER, 1992 GREATER THAN 20% FOA RECIRC.  !

l

3. LICENSED THERMAL POWER (MWT): 3293 MOTOR GENERATOR SET BRUSH I l

4 NAMEPLATE RATING (GROSS MwE): 1138 l CHANGE AND HPCI LEAK REPAIR 1

5. DESIGN ELECTRICAL RATING (NET MwE): 1055 l-
6. MAxIuuu DEPENDABLE CAPACITV-(GROSS MWE): 1092 l

~7 . MAXIMUM DEPENDABLE CAPACITV (NET MwE): 1055 i

! 8. IF CHANGES OCCUR IN' CAPACITY RATINGS.(ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

(

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR R EST RI CT I ONS IF ANY: ,

t THIS MONTH VR-TO-DATE CUMULATIVE

11 HOURS IN REPORTING PERIOD 744 8.784 60,624 3 .... _... ______...___ .___________
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 6.240.4 47.549.2 3

'13. REACTOR FESERVE SHUTDOWN HOURS 0.0 0.0 0,0  !

14. HOURS GENERATOR ON-LINE. 744.0 6.116.3 46.558.2
15. UNIT' RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
16. GROSS THERMAL ENERGY' GENERATED (MwH) 2.400.475 19.744.549 141.733.465
17. GROSS ELECTRICAL ENERGY GENERATED (WWH) 796.61J 6.474.200 45.975.140 j

i 18. NET ELECTRICAL ENERGY GENERATED (MWH) 767.553 6.229.061 44.040.517 ,

PAGE 1 OF 2

. ,. .. . . . . ._ . , _ . . . . . . . . . . - . . . _ . . . _ _ . , ._ -. _ _ . . .. .m .. ..m._____.m . . . . . _. = _.._

OPERATING DATA REPORT'(CONTINUED) DOCKET NO. 50 - 152 - ~.

6

............= - --.... . .  ;

DATE JANUARY 14 1992 THIS MONTH YR-TO-DATE CUMULATIVE -

19. UNIT SERVICE FACTOR 100.0 69.6 76.8
20. UNIT AVAILABILITY FACTCR 100.0 69.6 76.8
21. UNIT CAPACITY FACTOR (USING WDC NET) 97.8 67.2 68.9 *
22. UNIT CAPACITY F A CTOR (USING DER NET) 97.8 67.2 68.9
23. UNIT FORCED OUTAGE RATE O.0 9.9 5.3 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TVPE. DATE. AND DURATION 08 EACH)r
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST, STATUS.(PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED s INITIAL CRITICALITV 12/19/84 12/22/84 INITIAL ELECTRICITV MID APRIL 85 4/13/85 COMMERCIAL OPERATION 1ST OTR 86 2/01/86 4

k I

i PAGE 2 OF 2

- m - . ~ , . . . _ . . _ . .___.I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 39370'04390.

I i j

UNIT NAME LIMERICK UNIT 1 l

DATE JANUARY 14, 1992 * .  !

j REPORT MONTH DECEMBER. 1992 COMPLETED BY PHILADELPHIA ELECTRIC COMPANV  !

KARL MECK I REPORTS SUPERVISOR  !

BUSINESS UNIT  !

LIMERICK CENERATING STATION j TELEPHONE (215) 327-1200 EXTENSION 3320.

{ METHOD OF . LICENSEE lSYSTEMICOMPONENTI CAUSE AND CORRECTIVE

' TYPE DURATION REASON l$ HUTTING DOWN  :

EVENT l CCDE l CODE I ACTION TO NO. DATE (1) -(HOURS) (2)'l REACTOR (3) REPORT a 1 (4) 1 (5) l PREVENT RECURRENCE I

'l -

t  :

34 1 921206 'S 000.0 B '4 N/A HB VALVEX LOAD WAS REDUCED 10% TO PERFORM  !

MAIN TURBINE CONTROL VALVE 'ESTING 35 921212 15 '000.0 B 4 N/A CB MOTORX LOAD WAS REDUCED 56%'FOR RECIRC. MOTOR I GENERATOR SET BRUSH REPLACEMENT  !

' 36 921231 'S- 000,0 ' M' 4 N/A EA l ZZZZZZ LOAD WAS REDUCED'10% DUE TO LOW ELECTRICAL DISTRIBUTION SYSTEM DEMAND J _-_. . ,

I i

j' i t (1) ( 2') (3) (4)

F FORCED REASON'- METHOD EXHIBIT G - INSTRUCTIONS t S'- SCHEDULED A -.EOUIPMENT. FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA  :

B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRV SHEETS FOR LICENSEE  !

C - REFUELING 3 - AUTOMATIC SCRAM. EVENT. REPORT (LER) l D - REGut.ATORY RESTRICTION 4 OTHER..(EXPLAIN) FILE (NUREG-0161) 1 I

E -' OPERATOR. TRAINING +. LICENSE EXAMINATION F,- ADMINISTRATIVE (5)  ;

G - OPERATIONAL ERROP (EXPLAIN) (

'H- OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE I

's i

t i

e g -

3937004390-i l

! +

i

] -Docket No. #50-353 j Attachment to Monthly j _. Operating Report for j December.1992-i 5

5 -LIMERICK GENERATING STATION i UNIT 2 i DECEMBER *a, THROUGH DECEMBER 31, 1992 i I. NAT.RATIVE

SUMMARY

OF OPERATING EXPERIENCES .

l Limerick Unit 2 began-the month of December in end-of-cycle coastdown at a nominal 79% of-rated thermal power with core

! flow maximited. On Friday, December 4, both Recirculation l Pumps tripped due to the End of Cycle / Recirculation Pump Trip j- Breaker Opening logic being initiated during performance of j surveillance testing, a manual scram was initiated per plant i procedures. On Sunday, December 13, post scram pcwer ascension was completed with reactor power at 80% rated 4

thermal power. On Monday, December 28, load was reduced 100 i MWe to perform control rod pattern adjustments, power was

restored that same afternoon. Unit 2 ended this operating i- period at a nominal 69% of rated thermal power, in end-of-

!- cycle coastdown.

1 h

i l

{ II. CHALLENGES TO MAIN STEAM SAFETY RELIEF VALVES

! There were no challenges to the-Main Steam Safety Relief

! Valves during the-month.

1 i

i l

l oprtgex2 i

I i

i-i t

..-, ., . ~ . -

., . ., a a

AVERAGE DAILV UNIT POWER LEVEL 3937004390- .

i i

DOCKET NO. 50 - 353 - -

. i

. ;I UNIT LIMERICK UNIT 2

...___ .... _..._....__ ..... [

-DATE JANUARY 14, 1992 COMPANY PHILADELPHIA ELECTRIC COMPANY I KARL MECK ,

REPORTS SUPERVISOR  !

BUSINESS UNIT LIMERICK OENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320

' MONTH DECEMBER 1992

  • s DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 8 (MWE-NET) (MWE-NET) 1 805 17 .771 i i

2 1842 18 778  !

t 3 752 19 768 4 324 20 766 i ,

5- 0 21 767  :

I

'6 0 22 756 l i .

'7 0 23 755 i 8: O 24 735 F

9 O .25 745 '

10 0 26 736 a

+

3 11 0 27 729 j ,.  !

12 403 28 729  ;

i 1*- 746 29 709 1- 791 30 705

15 L782- 31 698  !

1 16 782

{.  !

n . - ~ . -- . ,_ - . . ~ . - . . - ~ . - . . -.-.~..~--.-.- .

--n .. - -.- - . . . = . . - - . . --..-..a - uw 3937004390 OPERATING DATA REPORT *

  • DOCKET NO. 50 - 353 ,

CATE JANUARY 14 1992 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY KARL MECK REPORTS SUPERVISOR BUSINESS UNIT LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 OPERATING STATUS

1. UNIT NAME: LIMERICK UNIT'2 NOTES: THE REACTOR wAS MANUALLY {

____________..... _..._ .__ ._.___ i

2. REPORTING PERIOD: DECEMBER. 1992 SCRAMMED AFTER BOTH RECIRC. ) i l
3. LICENSED THERMAL POWER (MWT): 3293 PUMPS TRIPPED DURING 4 NAMEPLATE RATING (GROS $ MWE): 1138 SURVEILLANCE TESTING.
5. DESIGN ELECTRICAL RATING (NET MWE): 1055
6. MAxluuM DEPENDABLE CAPACITV (GROSS MWE): 1092 l
7. MAXIMUM DEPENDABLE CAPACITY (NET MwE): 1055 l
8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONSi 9.' POWER LEVEL TO WHICH RESTR."~dD. IF ANY (NET MWE):

10.. REASONS F OR RESTRICTIONS. IF ANY; i

THIS MONTH VR-TO-DATE CUMULATIVE j

11. HOURS IN REPORTING PERIOD 744 8.784 26.136
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8.784.0 23.372.3

' 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 564.0 8.557.3 22.656.5

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16.. GROSS. THERMAL ENERGY GENERATED (WWH) 1.366.894 26.694.754 71.968.150
17. GROSS ELECTRICAL ENERGY GENERATED.(MwH) 435.710 8.821.470 23.753.106
18. NET ELECTRICAL ENERGY. GENERATED (MWH).. 415.583 8.489.182 22.863.047 i PAGE 1 OF 2

l 3937004390 OPEAATING DATA FEPORT (CONTINUED) DOCKET NO. 50 - 353 * ~.l<

DATE JANUARY 14, 1992 l

i.

THIS MONTH YR-TO-DATE- CUMULATIVE

19. UNIT SERVICE FACTOR 75.8 97.4 86.7 '
20. UNIT AVAILABILITY FACTOR 75.8 97.4 86.7 21 UNIT CAPACITV FACTOR (USING MDC NET) 52.9 91.6 82.9 22..ONIT CAPACITV FACTOR (USING DER NET) 52.9 91.6 82.9
23. UNIT FORCED OUTAGE RATE 24.2 2.6 4.6 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TVPE. DATE. AND DURATION OF EACH):

SECOND REFUELING: 01/23/93: 60 DAYS

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

26.: UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALI Y 08/12/89 08/12/89 INITI AL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 PAGE 2 OF 2 1

I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 3937004390

  • UNIT NAME LIMERICM UNIT 2 DATE JANUARY 14 1992
  • REPORT MONTH DECEMBER. 1992 COMPLETED BV PHI LADELPHI A ELECTRIC COMPANY KARL MECM REPORTS SUPERVISOR BUSINESS UNIT LIMERICK GENERATING STATIOw TELEPHONE (215) 327-1200 EMTENSION 3320 l . .

METHOD OF .I LICEN$EE ISYSTEM COMPONENTI CAUSE AND CORRECTIVE 1 TVPE DURATION REASON SHUTTING DOWN EVENT CODE CODE' l ACTION TO  :

NO.! 'DATE (1) (HOURS). (2) REACTOR (3) REPORT a (4) (5) l PREVENT RECURRENCE t

1 45 ' 921204 'F 180.0 'G 2 N/A CB PUMPXX R EA CTOR WAS MANUALLY SCRAMMED AFTER BOTH $

RECIRCULATION PUMPS TRIPPED DURING SURVEILLANCE TESTING 46 921228 5 000.0- B 4 N/A RB 'CONROD REACTOR POWER WAS REDUCED TO 10% TO PERFORM

'{; _....

REACTOR CONTROL ROD DATTERN ADJUSTMENTS ,

l 1 1e0.0 1 3

(1) (2) (3) (4)

F - FORCED- REASON METHOD EXHIBIT G - IN5TRUCTIONS S - SCHEDULED A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - JANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C'- REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

~G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I . SAME SOURCE 4 -_ -- _ _ __, ___-