Text
.
=
. ~..
Cu! buy Piaa
- p Pon O & c By 620 l' i tua n t.t w w
- w s1 January 11, 1993 k
Uvion Euenuea Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 UIRRC-2748
Dear Sir:
DOCKET NUMBER 50 483 CALLAWAY PLANT UNIT 1 FACILITY OPERATINC LICENSE. dF-30 MONTHLY OPERATINC REPORT DECEMBER 1992 The enclosed Monthly Operating Report for December, 1992 is submitted pursuant to section 6,9,1.8 of the Callaway Unit 1 Technical Specifications, h
W.
R.- Campbell.
N h
f VlfQY p Manager, Callaway Plant WRC/DE $N/
/J M/ crc Enclosure cc: Distribution attached 9301210008 921231 ADOCK 05000403
'g
.. - P DR..
PDR R
J49uvv4
./ p si I -
(/
^
'cc distribution for ULNRC 2748 with' enclosures Mr. Richard Mague, Chief Project Section lA-U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. L. R. Vharton-(2 copies)
Offico of Nuclear Reactor Regulation U.- S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 1
I
_j
DOCKET NO.
50 483 UNIT NAME CALLAWAY UNIT 1-t DATE l-11-93 COMP 1.ETED BY J. B. McInvale TELEPHONE 314/676-8247 PART A
-OPERATIONS
SUMMARY
The plant operated at approximately 100% power for the entire month with the following exceptions.
On 12-5 92 load was reduced to 92% for testing main turbine control valves. Full power operation resumed that day, j
1 On 12-8 92 load was reduced to 68% as a precautionary measure during
)
repair of a ground in a main feedwater pump control cabinet. Full power operation resumed on 12-9-92.
j PART B PORV AND SAFETY VALVE
SUMMARY
None Page 1 of 4
,1
_PART C-AVERAGE DAILY UNIT POWER LEVEL kg DOCKET NO 50 483 UNIT CallawayLUnit 1 DATE 1-11 93 COMPLETED BY J.- B. McInvale TELEPHONE 314/676-8247 MONTH: DECEMBER 1992 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL E6X (MWe-Net)
QAY (MWe Net)-
1 1170 17 1172 2
1169 18 1171 3
1168 19 1174 4
1170 20 1174 5
1165 21 1170 6
1167 22 1171 7
1167 23 1171 8
1116 24 1178 9
1030 25 1177-10 1166 26 1177' 11 1169 27 1176 12 1169-28 1175 13 1170 29
~1161 14 1169 30 1156 15 1168 31 1177
-16 1171
'Page 2 of 4
. ~. ~
L*-
Part D
- C OPERATING DATA REPORT DOCKET No.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 1 11-93 COMPLETED BY-'
~ J. - B, McInvale TELEP110NE 314/676-8247 OPERATING STATUS (y,Tp g) s 1.
REPORTING PERIOD: DECEMBER 1992 GROSS HOURS IN REPORTING PERIOD: 744 8784 70.405.5 2.
CURRENTLY AUTHORIZED POWER LEVEL (MVt): 3565-MAX, DEPEND, CAPACITY (MVe-Net): -1125 DESIGNELECTRICALRATING(MWe-Net): 1171 3.
POWER LEVEL TO WHICH RESTRICTED j!F ANY)(MWe-Net):
4.
REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR VAS CRITICAL.
744.0 7289.2 61,377.7 6,
REACTOR RESERVE SHUT 00VN HOURS.
0 0
0 7.
HOURS GENERATOR ON LINE....
744.0 7206.3 60,055.7'--
8.
UNIT RESERVE SHUTDOWN HOURS.,,
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (MWH).
2,619,556 24,817,087 201,079,950
- 10. GROSS ELECTRICAL ENERGY GENERATED (MVH).
906.267 8,498,732 68.561,896
- 11. NET LLECTRICAL ENERGY GENERATED (MWH)..
866,002 8,094.550 65,174,098
.100.0 83.0 87.2 12, REACTOR SERVICE FACTOR.
- 13. REACTOR AVAILABILITY FACTOR.
100.0 83.0 87.2
_ 14. Ud!T SERVICE FACTOR......
100.0 82.0-85.3 l
- 15. UNIT AV41 LABILITY FACTOR.
100.0-82.0 85.3
- 16; UNITCAPACITY-FACTOR (UsingHDC).
103.5 81.9 82.3'
- 17. UNIT CAPACITY FACTOR (Ustng Design MWe).
99.4 78.7 79.0.
18.I UNIT FORCEO 00TAGE' RATE....
0.0.
1.9 2.8
'19.
SHUT 00VMS SCHEDULED OVER NEXT 6 MONTHS'(TYPE, DATE, ANO DURATION OF EACH):
20, if SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
I Page 3 of 4 T-
.m--
h-m q%
4 g a-T-
='
[
PART E UNIT SHUTDOWNS AND POWER REDUCTIONS
+
DOCKET No.
50-483 UNIT MAME CALLAWAY UNIT I DATE 1-11-93
[
COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 REPORT MONTH: DECEMBER 1992 METHOD OF I
TYPE SHUTTIhG DOWN F: FORCED DURATION-THE REACTDR OR No.
DATE 5: SCHEDULED (HOURS)'
REASON REDUCING POER CORRECTIVE ACTIONS / COMMENTS
=
i L
SUMMARY
REASON METHOD l
A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT, OR TEST 2: MANUAL SCRAM i,
C2 REFUELING 3: AUTOMATIC SCRAM
-E 0: 'REGULATORT RESTRICTION 4: OTHER (EXPLAIN)
Ei DPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
'H:'OTHER(EXPLAIN)~
..