Monthly Operating Rept for Dec 1992 for Callaway Plant,Unit 1
ML20127F728
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/31/1992
From: Campbell W, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2748, NUDOCS 9301210008
Download: ML20127F728 (6)


Text

.

=

. ~..

Cu! buy Piaa

p Pon O & c By 620 l' i tua n t.t w w
w s1 January 11, 1993 k

Uvion Euenuea Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 UIRRC-2748

Dear Sir:

DOCKET NUMBER 50 483 CALLAWAY PLANT UNIT 1 FACILITY OPERATINC LICENSE. dF-30 MONTHLY OPERATINC REPORT DECEMBER 1992 The enclosed Monthly Operating Report for December, 1992 is submitted pursuant to section 6,9,1.8 of the Callaway Unit 1 Technical Specifications, h

W.

R.- Campbell.

N h

f VlfQY p Manager, Callaway Plant WRC/DE $N/

/J M/ crc Enclosure cc: Distribution attached 9301210008 921231 ADOCK 05000403

'g

.. - P DR..

PDR R

J49uvv4

./ p si I -

(/

^

'cc distribution for ULNRC 2748 with' enclosures Mr. Richard Mague, Chief Project Section lA-U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. L. R. Vharton-(2 copies)

Offico of Nuclear Reactor Regulation U.- S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 1

I

_j

DOCKET NO.

50 483 UNIT NAME CALLAWAY UNIT 1-t DATE l-11-93 COMP 1.ETED BY J. B. McInvale TELEPHONE 314/676-8247 PART A

-OPERATIONS

SUMMARY

The plant operated at approximately 100% power for the entire month with the following exceptions.

On 12-5 92 load was reduced to 92% for testing main turbine control valves. Full power operation resumed that day, j

1 On 12-8 92 load was reduced to 68% as a precautionary measure during

)

repair of a ground in a main feedwater pump control cabinet. Full power operation resumed on 12-9-92.

j PART B PORV AND SAFETY VALVE

SUMMARY

None Page 1 of 4

,1

_PART C-AVERAGE DAILY UNIT POWER LEVEL kg DOCKET NO 50 483 UNIT CallawayLUnit 1 DATE 1-11 93 COMPLETED BY J.- B. McInvale TELEPHONE 314/676-8247 MONTH: DECEMBER 1992 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL E6X (MWe-Net)

QAY (MWe Net)-

1 1170 17 1172 2

1169 18 1171 3

1168 19 1174 4

1170 20 1174 5

1165 21 1170 6

1167 22 1171 7

1167 23 1171 8

1116 24 1178 9

1030 25 1177-10 1166 26 1177' 11 1169 27 1176 12 1169-28 1175 13 1170 29

~1161 14 1169 30 1156 15 1168 31 1177

-16 1171

'Page 2 of 4

. ~. ~

L*-

Part D

C OPERATING DATA REPORT DOCKET No.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 1 11-93 COMPLETED BY-'

~ J. - B, McInvale TELEP110NE 314/676-8247 OPERATING STATUS (y,Tp g) s 1.

REPORTING PERIOD: DECEMBER 1992 GROSS HOURS IN REPORTING PERIOD: 744 8784 70.405.5 2.

CURRENTLY AUTHORIZED POWER LEVEL (MVt): 3565-MAX, DEPEND, CAPACITY (MVe-Net): -1125 DESIGNELECTRICALRATING(MWe-Net): 1171 3.

POWER LEVEL TO WHICH RESTRICTED j!F ANY)(MWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR VAS CRITICAL.

744.0 7289.2 61,377.7 6,

REACTOR RESERVE SHUT 00VN HOURS.

0 0

0 7.

HOURS GENERATOR ON LINE....

744.0 7206.3 60,055.7'--

8.

UNIT RESERVE SHUTDOWN HOURS.,,

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH).

2,619,556 24,817,087 201,079,950

10. GROSS ELECTRICAL ENERGY GENERATED (MVH).

906.267 8,498,732 68.561,896

11. NET LLECTRICAL ENERGY GENERATED (MWH)..

866,002 8,094.550 65,174,098

.100.0 83.0 87.2 12, REACTOR SERVICE FACTOR.

13. REACTOR AVAILABILITY FACTOR.

100.0 83.0 87.2

_ 14. Ud!T SERVICE FACTOR......

100.0 82.0-85.3 l

15. UNIT AV41 LABILITY FACTOR.

100.0-82.0 85.3

- 16; UNITCAPACITY-FACTOR (UsingHDC).

103.5 81.9 82.3'

17. UNIT CAPACITY FACTOR (Ustng Design MWe).

99.4 78.7 79.0.

18.I UNIT FORCEO 00TAGE' RATE....

0.0.

1.9 2.8

'19.

SHUT 00VMS SCHEDULED OVER NEXT 6 MONTHS'(TYPE, DATE, ANO DURATION OF EACH):

20, if SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:

I Page 3 of 4 T-

.m--

h-m q%

4 g a-T-

='

[

PART E UNIT SHUTDOWNS AND POWER REDUCTIONS

+

DOCKET No.

50-483 UNIT MAME CALLAWAY UNIT I DATE 1-11-93

[

COMPLETED BY J. B. McInvale TELEPHONE 314/676-8247 REPORT MONTH: DECEMBER 1992 METHOD OF I

TYPE SHUTTIhG DOWN F: FORCED DURATION-THE REACTDR OR No.

DATE 5: SCHEDULED (HOURS)'

REASON REDUCING POER CORRECTIVE ACTIONS / COMMENTS

=

i L

SUMMARY

REASON METHOD l

A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT, OR TEST 2: MANUAL SCRAM i,

C2 REFUELING 3: AUTOMATIC SCRAM

-E 0: 'REGULATORT RESTRICTION 4: OTHER (EXPLAIN)

Ei DPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

'H:'OTHER(EXPLAIN)~

..