ML20127F760

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Dec 1992 for Catawba Nuclear Station & Revised Monthly Operating Rept for Nov 1992,consisting of Personnel Exposure Info
ML20127F760
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/15/1993
From: Mccraw E
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127F766 List:
References
NUDOCS 9301210015
Download: ML20127F760 (2)


Text

_ - _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _

OPERATING DATA REPORT doc KET NO.

50-302 UNIT FLCRP-3 DATE JANUARY 5,1993 couple 1tD BY Ratolgh Smith iEtiPHONE (904) 795 6486 QPLRAllNOjilAT.MS 1.

UNIT NAME:.

CRYSTAL RIVER UNIT 3 2.

REPOFHING PERIOD.,

.. NOVEMDER 1992 3 LICLNSED THERMAL POWER (MWt)..

2544 4.

N AMEPLAT E RATING (GROSS MWo).

. 090 5.

DESIGN Et 0CT RICAL RA1,NG (NET MWo).

825

6. MAXIMUM DEPENDADL E CAPACITY (GROSS MWo):. BG0 7.

M AXIMUM DEPENDADLE CAPACITY (NET MWe):.

. 821 8.

IF CH ANGC S OCCUR IN C APACIT Y HATINGS (IT LM9 NUMDLH 3 THROUGH 7) SINCE LAST REPORT. OlVE HE ADONS.

NA

9. h0WER L EVEL TO WHICH RESTRICTED,IF ANY(NET MWo):

N/A 10= REASONS F OR RESTRICTIONS,IF ANY:

N/A THIS MONTH YR. T0 DA1E CUMULAllVE

11. HOURS IN REPORTING PERIOD 720.0 8.040.0 137,808.0
12. NUMDER OF HOURS REACTOR WAS CRITICAL 720.0 5,092.6 89.828.6
13. REACTOR RESERVE SHUTDOWN HOURS 00 0.0 1.280.6
14. HRS GENERATOR ON LINE 720.0__

5.953.3 88.101.0_

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
13. GROSS THERMAL ENERGY GENERATED (MWH) 1,788,243 14.514.463, 200.849.109
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 614,988 4.963,455 68.586.352 10 NET ELECTRICAL ENERGY GENERATED (MWH) 586,910_

4,737,572 CS,169.31_1 19 UNII SERVICE F ACTOn 100.0 %

74.0 %

63.9 %

20 UNIT AVAILABLE FACTOR 100.0 %

74.0 %

63.9 %

21. UNIT CAPACITY FAC10R(using MDC not) 99.3 %

71.8%,

58.6 %

22. UNIT CAPACITY FACTOR (using DER not) 98.8 %

71.4 %

57.3 %

23. UNIT FORCED OUTAGE RATE 0.0%

3.4%

18.5%

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DUFUTION OF EACH):

MID-CYCt.E OUT AGE SCHEDULED FOR MARCH 4,1993 WIRi A OURATION OF 65 DAYS.

25. IF SHUTDOWN AT END OF REPOH1 PERCO. ESTIMATED OATE OF STARTUP; N/A
26. UNITS IN TEST ST ATUS(PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APitlCABLE TO CR-3 IORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERAllON NA NA 9301210015 930115 PDR ADOCK 05000413 8

PDR

AVERAGE DAILY UNIT POWER LEVEL d

DOCKET NO.

50-302 UNIT FLCRP-3 DATE DECEMBER 3,1992 COMPLETED BY Raleigh Smith TELEPHONE (904) 795-6486 MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWo-Not)

(MWo-Not) 1 704 17

-838 2

704 18 838 3

707 19 838 4

820 20 838-5 747-21 829 6

782 22

'796 7

799-23

-836 8

828 24 837 9

838 25 835 10 839 26 834 11 _

837 27 834-12 _

837 28 835 13 837 '

29 837 14 838 30 838 15 838 31 16 838 INSTRUCTIONS:

On this format, list the daily average unit power level in MWo-Net for each day in the reporting month. Computo to the nearest whole megawatt.

l l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 11NTT FLCRP-3 REPORT MONTH. NOVEMBER DATE CECEMBER 3.19GC COMPLETED BY Raie g5 Sme TELEPHONE (904) 795-e4a6 l

1 NO.

DATE 1YPE (1)

DURATION REASON (2)

METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORHa urIE HOURS SHUTTING EVENT CODE (4)

CODE (5)

ACTION TO PRESTNT DOWN REACTOR (3) REPORT #

RE'CURRENCE i

92-38 921101-S 16.11 A

5 N/A HC HTEXCH The C water box was taken cut of service to fix a satt leak.

92-39 921102 S

13.38 A

5 N/A HC HTEXCH The C watertox was taken out of sennce to fix a sait leak.

92 921102 S

6.25 A

5 N/A HC HTEXCH The D waterbox was taken out of service to fix a sa!! leak and pacify w'th coppertrol 92-01 921104 S

16.50 A

5 N/A HC HTEXCH The B Water box was taken out of senrice to fix a sa.t leak and padfy with suppe bvL' 92 42 921:06 S

11.58 8

5 N/A HC HTEXCH The B water box was taken out of sennce to pacify with coppertrol 92-43 921121 S

11.38 A

5 N/A HC HTEXCH The B water box was taken cut of sennce to l

tix a sa!t leak.

t

[

{

1 2

3 e

E F: FORCED FEAScre saETNOD EXHIWY G-esSTft.ICTIONS O[NI8ff t.sAaAE E3 URN S: SCHEDULED A 40UndENT FALUFE 1-4AANUAL FOR PHEPARAT1040F DATA B-aaAMTENANCE OR TEST 2-asANUAL SCRAad ENTRY SMEETS FOR LICDeSEE CJEFUEUNG 3.J4ff0 SCRAas EVENT #EPORT(LEF4 FLE DJEGULATORV #ESTErlOed 4-CONT 1NUED P8UBEOM)

E. OPE 7tATOR TV%spepe0 &

5-REDUCED LOAD LICEN9E ADamNesTRATION S.CTNER F-ADesseSTRATION G.OPEFMTIDNAL E7MOR M 4THER

l l

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO.

50-302 UNIT FLCRP-3 DATE DECEMBER 3,1992 COMPLETED BY Raleigh Smith TELEPHONE (904) 795-6486 MONTH: NOVEMBER SUMM ARY STATEMENT:

Crystal River Unit 3 remained at power for the entiro month of November.

On November 1 tho unit was reduced to 85% power for a salt leak in C water bo. and again on November 2. Later on November 2 the unit was reduced to 85% power for a salt leak in D water box and to pacify the box with copportrol. On November 4 the unit was reduced to 85% power for a salt leak in B water box and to padfy the box with copportrol. On November 6 the unit was reduced to 85% power to pacify the C water box. On Novomber 21 the unit was reduced to 85% power for a salt leak in B water box.