OPERATING DATA REPORT doc KET NO.
50-302 UNIT FLCRP-3 DATE JANUARY 5,1993 couple 1tD BY Ratolgh Smith iEtiPHONE (904) 795 6486 QPLRAllNOjilAT.MS 1.
UNIT NAME:.
CRYSTAL RIVER UNIT 3 2.
REPOFHING PERIOD.,
.. NOVEMDER 1992 3 LICLNSED THERMAL POWER (MWt)..
2544 4.
N AMEPLAT E RATING (GROSS MWo).
. 090 5.
DESIGN Et 0CT RICAL RA1,NG (NET MWo).
825
- 6. MAXIMUM DEPENDADL E CAPACITY (GROSS MWo):. BG0 7.
M AXIMUM DEPENDADLE CAPACITY (NET MWe):.
. 821 8.
IF CH ANGC S OCCUR IN C APACIT Y HATINGS (IT LM9 NUMDLH 3 THROUGH 7) SINCE LAST REPORT. OlVE HE ADONS.
NA
- 9. h0WER L EVEL TO WHICH RESTRICTED,IF ANY(NET MWo):
N/A 10= REASONS F OR RESTRICTIONS,IF ANY:
N/A THIS MONTH YR. T0 DA1E CUMULAllVE
- 11. HOURS IN REPORTING PERIOD 720.0 8.040.0 137,808.0
- 12. NUMDER OF HOURS REACTOR WAS CRITICAL 720.0 5,092.6 89.828.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 00 0.0 1.280.6
- 14. HRS GENERATOR ON LINE 720.0__
5.953.3 88.101.0_
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 13. GROSS THERMAL ENERGY GENERATED (MWH) 1,788,243 14.514.463, 200.849.109
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 614,988 4.963,455 68.586.352 10 NET ELECTRICAL ENERGY GENERATED (MWH) 586,910_
4,737,572 CS,169.31_1 19 UNII SERVICE F ACTOn 100.0 %
74.0 %
63.9 %
20 UNIT AVAILABLE FACTOR 100.0 %
74.0 %
63.9 %
- 21. UNIT CAPACITY FAC10R(using MDC not) 99.3 %
71.8%,
58.6 %
- 22. UNIT CAPACITY FACTOR (using DER not) 98.8 %
71.4 %
57.3 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
3.4%
18.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DUFUTION OF EACH):
MID-CYCt.E OUT AGE SCHEDULED FOR MARCH 4,1993 WIRi A OURATION OF 65 DAYS.
- 25. IF SHUTDOWN AT END OF REPOH1 PERCO. ESTIMATED OATE OF STARTUP; N/A
- 26. UNITS IN TEST ST ATUS(PRIOR TO COMMERCIAL OPERATION):
THIS ITEM IS NOT APitlCABLE TO CR-3 IORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERAllON NA NA 9301210015 930115 PDR ADOCK 05000413 8
AVERAGE DAILY UNIT POWER LEVEL d
DOCKET NO.
50-302 UNIT FLCRP-3 DATE DECEMBER 3,1992 COMPLETED BY Raleigh Smith TELEPHONE (904) 795-6486 MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWo-Not)
(MWo-Not) 1 704 17
-838 2
704 18 838 3
707 19 838 4
820 20 838-5 747-21 829 6
782 22
'796 7
799-23
-836 8
828 24 837 9
838 25 835 10 839 26 834 11 _
837 27 834-12 _
837 28 835 13 837 '
29 837 14 838 30 838 15 838 31 16 838 INSTRUCTIONS:
On this format, list the daily average unit power level in MWo-Net for each day in the reporting month. Computo to the nearest whole megawatt.
l l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-302 11NTT FLCRP-3 REPORT MONTH. NOVEMBER DATE CECEMBER 3.19GC COMPLETED BY Raie g5 Sme TELEPHONE (904) 795-e4a6 l
1 NO.
DATE 1YPE (1)
DURATION REASON (2)
METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORHa urIE HOURS SHUTTING EVENT CODE (4)
CODE (5)
ACTION TO PRESTNT DOWN REACTOR (3) REPORT #
RE'CURRENCE i
92-38 921101-S 16.11 A
5 N/A HC HTEXCH The C water box was taken cut of service to fix a satt leak.
92-39 921102 S
13.38 A
5 N/A HC HTEXCH The C watertox was taken out of sennce to fix a sait leak.
92 921102 S
6.25 A
5 N/A HC HTEXCH The D waterbox was taken out of service to fix a sa!! leak and pacify w'th coppertrol 92-01 921104 S
16.50 A
5 N/A HC HTEXCH The B Water box was taken out of senrice to fix a sa.t leak and padfy with suppe bvL' 92 42 921:06 S
11.58 8
5 N/A HC HTEXCH The B water box was taken out of sennce to pacify with coppertrol 92-43 921121 S
11.38 A
5 N/A HC HTEXCH The B water box was taken cut of sennce to l
tix a sa!t leak.
t
[
{
1 2
3 e
E F: FORCED FEAScre saETNOD EXHIWY G-esSTft.ICTIONS O[NI8ff t.sAaAE E3 URN S: SCHEDULED A 40UndENT FALUFE 1-4AANUAL FOR PHEPARAT1040F DATA B-aaAMTENANCE OR TEST 2-asANUAL SCRAad ENTRY SMEETS FOR LICDeSEE CJEFUEUNG 3.J4ff0 SCRAas EVENT #EPORT(LEF4 FLE DJEGULATORV #ESTErlOed 4-CONT 1NUED P8UBEOM)
E. OPE 7tATOR TV%spepe0 &
5-REDUCED LOAD LICEN9E ADamNesTRATION S.CTNER F-ADesseSTRATION G.OPEFMTIDNAL E7MOR M 4THER
l l
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO.
50-302 UNIT FLCRP-3 DATE DECEMBER 3,1992 COMPLETED BY Raleigh Smith TELEPHONE (904) 795-6486 MONTH: NOVEMBER SUMM ARY STATEMENT:
Crystal River Unit 3 remained at power for the entiro month of November.
On November 1 tho unit was reduced to 85% power for a salt leak in C water bo. and again on November 2. Later on November 2 the unit was reduced to 85% power for a salt leak in D water box and to pacify the box with copportrol. On November 4 the unit was reduced to 85% power for a salt leak in B water box and to padfy the box with copportrol. On November 6 the unit was reduced to 85% power to pacify the C water box. On Novomber 21 the unit was reduced to 85% power for a salt leak in B water box.