Text

. - _ - ._ _ __ - _ - _ _ - - . . _ - _ -

et/93 14oo4 l'Illi,ADEl,PillA FI,ECTRIC COhll%NY ,

. l>l!ACll llOITOh! A1Dh11C l'OWiiR STATR)N R.D.1 lim 208 Delta. Wnnsylvania 17314

  • t% .

Pt 4f H &W if'it M litt (Wi p (# $ %f f!!1 M I (Ij7)4 b 70!4 n.e P ed lrd January 14, 1993 Docket Nos. 50 277 50 278 U.S. Nuclear llegulatory Commission Document Control Desk Washington, DC 20555 SUllJIICT: Peach llottom Atomic Power Station Monthly Opetating Report Gentlemen:

linclosed are twelve copies of the monthly operating report for Peach llottom Units 2 and 3 for the month of December 1992 forwarded pursuant ta Technical Specification 6.9.1.d under the guidance of Retulatory Guide 10.1, llevision 4.

Sincerely,

& Gdh 9 ;- > 0 DilMpAAF/TJN/DRM/MJil
cmc 0.t$ Pulff 7/1 linclosure ec: R.A. Ilurricelli, Public Service lilectric & Gas T.M. Gerusky, Commonwealth o." Pennsylvania J.J.1.yash, USNRC Senior Resident inspector R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC II.C. Schwemm, Atlantic lilectric C.D. Schaefer, Delmarva Power INPO Records Center cce a nc 9301210031 921231 /- I L

DR ADOCK0500g77 j

8 4 I NRC Monthly Operations Summary Peach llottom Atomie Power Station j December 1992 ,

l I

l 1!b'lU 1

j Unit 2 began the month shut down for the ninth refueling outage. The mode switch was placed in startup on December 5 and the generator was initially synchrontred to the grid on December 9. During turbine testing, l

problems with a generato. output breaker occured and the turbine tripped. The breaker was isolated and the generator was synchroni/ed. On December 19 ihe turbine was taken offline after discovering a generator hydrogen leak. Unit 2 returned to power on December 20 and remained at 777, power because of turbine control valve oscillation concerns. A maintenance outage is scheduled for early January 199.1 to correct the turbine control valve EllC problems and repair a reelte seal.

1 l

1

.: ilhlU I

Unit 3 began the month at nominal 100(?v power. Power operation continued until December 19 wben the turbine was taken off line to clean the condenser waterboxes and repair a turbine control valve EllC oil leak. After completing repairs, power was returned to nominal 100</6 and remained at that level fc. the rest of the month, i

i I

CCl292.NRC .

d t

j Docket No. 50 277 j Attachment to

?,lonthly Operating

) !

Report for December 1W2 l

UNIT 2 HDUEl. LNG INFORMATION l

4 I j l

1. Name of facility:

l l'each 110ttom Unit 2 1

1 i )

i 2. Scheduled A ' r nest refueling shutdown:

j 1 h .10 scheduled for September 10,1994.
3. Scheduled date for restart following refueling:

d Restart following refueling forecast for December 8,1994.

I j 4. Will refueling or resumption of operation therefore require a technical specification change or other

! license amendment?

No.

If answ r is yes, what, in general, will these be?

i 1

f 5. Scheduled date(s) for submitting proposed licensing action and supporting information:

4 l N/A

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, i unreviewed design or performance analysis methods, significant changes in fuel design, new operating
procedures

N/A .

i s

?

CCl292.NRC l

+

Do<let No. 50 277 Attachment to Monthly Operating iteport for December 19'12 Page 2 -

UNIT 210:1 Ul:1. LNG INI'ORNI ATION (Continued)

7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:

(a) Core 7M Fuel Assemblics (b) Fuct Pool 21M Fuel Assemblics, $8 Fuel Rods

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core of00ad capability.

September 1997 with full core offload capability.

- CCl292 NRC

4

,' ^ Docket No. 50 278 Attachment to Monthly Operr. ting Report for December 1992 UNIT 3 IEELIELING int'ORM A'llON 1, Name of facility:

Peach llottom Unit 3

2. Scheduled date for next refueling shutdown:

Reload 9 scheduled for September 4,1993

3. Scheduled date for restart following refueling Restart following refueling scheduled for October 29,1993
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes if answer is yes, what, in general, will these be?

92 19 Change safety limit MLPR for Cycle 10 92 13 CAD analyrer replacement

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

92-19 Scheduled for February 1993 9213 Scheduled for February 1993 6, important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A CCIN.1NRC -

i

,1 +

l l ,' ' Docket No. 50 278

! Attachment to  ;

j . Monthly Operating Iteport for December 1992

]

, Page 2 i

UNIT 3 HEFUl:1 ING INFORM ATION (Continued)

7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool

a i

i (a) Core 764 Fuel Assemblics (b) Fuel Pool 1945 Fuel Assemblies,6 Fuct Rods  !

i

. 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage l' capacity that has been requested or is planned,in number of fuel assemblies:

1 4 The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.

i

)

< 9 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

! September 2004 without full core offload capability.

I September 1998 with full core offload capability, i

o l

t 4

1 cct292.Nnc

__._2. _ . . . _ _ _

. _ . . . . . _ .-_. . _ __.-._._-._._.______.____.-__._.-m . . _ - _ . . _ . _ _ _ _ _ _ . _ . . _ . - - . . . _ . _.

t . _ .,

l' *

[

i j _ ..

1  !

} AVIRACE CAILV UN!1 POWit LEVf L 4

  • i 1 DOCLEt NO. 50 277 j ............................. ,

i UNif P(ACH $01 TON UNlT 2 041t JANUARY 15, 1993 l .............................  ;

1 COMPANY PHILADELPHI A (L(CTRIC COMPANY j .............................

I M. J. BARON I $UPERvit0R j RlPOR15 CROUP PE ACH 80fl0M ATOMIC POWER $1Afl0N i

j TELEPMoht (717) 456 7014 Ext. 3321 t 4 ............................. '

4 t

MONTH DECEMBER 1992 j CAT AYERACE DAILY POWER L(vfl DAY AVERACE DAILY POWER LEVEL

,1 (MWE kET) (MWE kET) i 1

1 1 0 17 783 .

I 2 0 18 617 l

l 3 0 19 0 1

4 0 20 391 j $ 0 21 805 l l 6 0 22 73 7 4

7 0 23 792 1

1 8 0 24 821 I 9 0 25 824 .

4

10 98 26 U24 1

11 218 27 824

, 12 189 28 845 1

13 210 29 804 l 14 263 30 820

.' 15 601 31 824 i

. 16 626

.) ,

4 i

1

(

i d

'l l

e-,4 ww6 . - , . .m- e e +uw e - e*ww=.w----~w,e . .v v u- - , - * . , . - . ~ , ,--w,,mc..-ee. .~a, ~.ne-i-r.- m.,a-w.,--ww , e ~ne,w- .r---e .,ywwes-. p

4 AVERAGE DAILY UNil POWtt LEVit 00CLil 60. 50 278 UNil PEACH B0110M UNil 3 Daft JANUARY 15, 1993 COMPANT PHILADELPHI A f t!CIRIC COMPANY M. J. BARON

$UPERVl$0R REPORi$ CROUP PEACH 80110M ATOMIC POWER STA1!ON tittPHONE (717) 456 7014 tui. 3321 MONIH DECEMB(R 1992 DAY AVERACE DAILY POWER Ltvil DAT - AVERACE DAILY POWER LEVtl (MWE kti) (MWE NET) 1 1052 17 1045 2 1028 _

18 1040 __

3 -1055 19 217 4 1035 20 755 5 1051 -21 1029 6 1043 22 1046 7 1042 23 1048 8 1049 24 1045 9 1038 25 1050 10 1040 26 1054 11 1041 27 1050 12 1057 28 1050 13 1049 29 1050 14 1040 30 1050 15 1058 31 1046 16 1041

OPERAllNG DATA REPORT 00Catt No. 50 277 DATE JANUARY 15, 1993 COMPLETED BY FMILADELPHI A ELECTRIC COMPANT M. J. BARON

$UPERVISOR REPORTS GROUP PEACH B0110M A10MIC POWER $1A110N TELEPHONE (717) 456 7014 EXf. 3321 OPERAi!NG STATUS

1. UNil NAME: PEACH B0ff0M UNIT 2 NOTES:
2. REPORTING PERIOD: DECEMBER, 1992
3. LICENSED THERMAL POWER (MWT):

3293

4. NAMEPLATE RA11NG (CROS$ MWE): 1152
5. DESIGN ELECTRICAL RATING (NET MWE): - 1065
6. MAXIMUM DEPENDABLE CAPAClif (Gk0$5 MWE): 1098
7. MAXIMUM DEPENDABLE CAPAttif (PET MWE): - 1055
8. IF CHANGES OCCUR IN CAPACliY RATINGS (IIEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL 10 WHlCH RE$1RICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRlCTIONS, IF ANY:

THIS MONTH YR*10 DATE CUMULAtlVE

11. HOURS IN REPORTING PERIOD 744 8,784 162,120
12. NUMBER OF HOUR $ REACTOR WAS CRiflCAL 562.0 6,130.1 98,384.1 g ............ ............ ............

' 13. REACTOR RESERVE $HUTDOWN HOURS . 0.0 0.0 0.0

14. HOURS GENERATOR ON LINE 491.0 5,811.7 94,649.2

. 15. UNIT RESERVE SHUIDOWN HOUR $ 0.0 . 0.0 0.0

16. GROS $ THERMAL ENERGY GENERATED (MWH) 1,048,951 17,830,015 280,369,744
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 320,800 5,883,800 92,172,390

. 18. NET ELECTRICAL ENERGY GENERATED (MWH) 308,116 5,669,486 88,286,719-PAGE 1 0F 2 i.

.a r-S *n . ~ , y y e- 9..,,y,-w.,m-,,wre,-~m+v.

  • Tr r'r-m= -' --e-w-t'--~w+, -w'-~ - = e-**v' v= --e-- *e emwa-ve-* +-w**

_._____..._a -..___- _

_ _ ____. - _..._.____..__- ~.--. ~._ _.__ _ -_ _ _ _ w_- ..___w--_-_m ___

)

1 4 .

1 .

i OPERA 11NG DATA REPORT (CONilNUED) DOCLE! No. 50 277

. -t l

j DATE JANUARY 15, 1993 ,

TWi$ MONTH YR 10-DATE CUMJLailVE

19. UNIT SERVICE FAC10R 66.0 66.2 58.4
20. UNIT AVAILABILITY FACTOR 66.0 66.2 58.4
21. UNIT CAPAClif FACTOR (USING MDC NET) 39.3 - 61.2 51.6
22. UNIT CAPAC!1Y FACTOR (USING DER NET) 35.9 60.6 $1.1
23. UNIT FORCED OUTAGE RATE 5.4 12.5 14.5
24. SHUIDOWNS SCHEDULED OVER hEXT 6 MONih5 (1YPE, DATE, AND DURAfl0N OF EACH): -

Maintenance Outage, 01/02/93, 7 Days

25. IF $HUIDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF $fARTUP N/A
26. UN115 IN 1EST ST ATUS (PRIOR TO COMMERCI AL OPERAfl0N): FORECA51 ACHIEVED IN111AL CRiitCALITY 09/16/73 INITIAL ELECTRICITY 02/18/74

-COMMERCIAL OPERAfl0N 07/05/74 PAGE 2 of 2 e -

MrT f * '>%-u t-ep- Ww-- mm-v-m-hr N wpWg -ww----TWW-'- 4- W -i-FM'Wwy-- w- 7 W w w w w m -w. w y e , y- r7-T yr w ww p-

__ - ..___..-_ _ ___ _ - _ _ . _ _ . _ . _ _ _ . _ - ._ - ~ . _ _ _ _ , . . _ - . _ _ . _

i

? . .

l.

2 .

4 .

I I OPERAllNG DATA REPORT 1

l DOCAET NO. 50 278 l

j DATE JtWV RY 15, 1993 J

J COMPLETED 8' PHILADELPHI A ELECTRlC COMPANY 1 .............................

M. J. BARON SUPERVISOR i REPORis GROUP j PEACH B0f f 0M ATOMIC POWER STAfl0N TELEPHONE (717) 456 7014 EXT. 3321

{' .............................

! 0FERATING STATUS j ................ .

1. UNIT NAME: PEACH B0ff0M UNii 3 NOTES:

j 2. REPORilNG PERIOD: DECEMBER, 1792

? ...........................

3. LICENSED THERMAL POWER (MWT): 3293 l 4. NAMEPLATE RAi!NG (GROSS MWE): 1152 j ...............

i -

5. DEslCN EttCTRICAL RAi!NG (NET MWE){ 1065 j 6. MAXIMUM DEFENDABLE CAPAciff (GRo$$ MWE): 1098

, 7. MAxlMUM DEFENDABLE CAPACITY (NET MWE): 1035 j -

! 8. If CHANCES DCCUR IN CAPAClif RATINOS (ifEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS:

1 1

j 9. POWER LEVEL 10 WHICH RE$1RICTED, if ANY (NET MVE):

l i 10. REASONS FOR RESTRIC110NS, IF ANY:

} THl$ MONTH YR*TO DATE CUMULAfivt l

. 11. HOURS IN REPCRilNG PERIOD 744 8,784 158,016' j 12. NUMBER OF HOUR $ REACTOR WAS CRITICAL 744.0 7,696.3 _98,058.4 j ............ ............ ............

i 13. REACTOR RESERVE SHUTDOWN HOURS 0.C 0.0 0.0 j ............ ............ ............

14. HOURS GENERATOR ON LINE 732.0 7,392.2 94,697.2
15. UNIT RE$ERVE $HUfDOWN HOURS 0.0 0.0 0.0
16. CROSS THERMAL ENERGY GENERATED (MWH) 2,361,936 22,487,280 278,581,210 j 17. Cross ELECTRICAL ENERGY GENERATED (MWH) 774,400 7,437,600 91,440,132 ,
18. NET ELECTRICAL ENERGY GENERATED (MWH) 751,062 7,180,949 87

....,663.966 i

PAGE 1 0F 2 i-i

}

J

~,, , , n., . . , . ,,,.,.,-.v, ,,...r, vn- , ,, ,,,,www.-~-,,r-- ,,-----m .r,-a-n.n ,.-,,---w. . ,. ,,,,,~n,- e n, -

- . ~ . - - - - ~ -- - .-___.-.- - _ _ _ .- . . ~ - . _ _ _ _ . _ . . - - - _ _ . - _ _ _

e t i

C*tRA11NG DATA REPORI (CONilNUED) DOCKit NO. 50

  • 278

............................. j DAlt JANUARY 15, 1993 r

THit MONIN TR 10 DAlt CURJLAtly!

19. UNif SEltVICE FACTOR 98.4 84.2 59.9 1 l 20. Ubit AVAILABILi1Y FACTOR 98.4 84.2 59.9

............ ............ i

21. UN!! CAPAClif FACTOR (U$1NG MDC hit) 97.5 79.0 53.6
22. UNIT CAPACi1Y FACTOR (U$1NG DER Nti) 94.8 76.6 52.1
23. UNif FORCfD OUTAGE Fett 1.6 12.4 12.7
24. $HU100WNS SCNtDUL!D OVfR NtXT 6 MONTH $ (f fPE, DAlt, AND DURA 110N OF EACH):

h

25. If $HutDOWN AT (ND OF REPORT PERIOD, t$flMAffD DAff 0F STARTUP N/A
26. UN115 IN 1t$1 Status (PRIOR 10 COMMERCIAL OPERAil0N): FORfCAST ACHIEVED i

lifflAL CRITICAll1Y 08/07/74 INiflAL (LECTRICITY 09/01/74 COMMERCIAL OPERA 110N 12/23/74 t

PAGE 2 0F 2 k

5 i

s

,s. 9'o,.,., y.g % ,my . . , , , , , , , . [ , , . , . , , . , ,,.J , , ; ,

-v my -y.- ,,,--, w -m ._,,,-,p -y .- ,-.. 9-,- ,, ,g ,, , , , ,

C e

UNii $HUIDOWto$ AND POWER REDUCil0NS Dottti NO. $0

  • 277 UN!i hAME PEACH $0T10M UNil 2 DAtt JANUARY 1$, 1993 REPORT MONTH DECEMBER, 1992 COMPLETED BT PHIL ADELPHI A ELECTRIC COMPANY M. J. BARDN SUPERVISOR REPORIS CROUP PEACH B0110M ATOMIC POWER $1 A1104 TELEPn0NE-(717) 456 7014 EXI. 3321 METHOD of LICEN$tt SYSTEM COMPONENT CAUSE AND CORRECilVE TYPE DURATION REASON $HU111NG DOWN EVE NT C00E CODE Atil0N TO No. DATE (1) (HOUR $) (2) REACTOR (3) REPORT # (4) ($) PREVENT RECURRENCE 18 921201 $ 0.0 C 1 N/A RC TUELXX $ HUT DOWN FOR RETUEllNC OUTAGE 19 921210 $ 3.0 B 4 N/A NA TURBIN TURBlhE TRIP DN HlCH V!BRAll0N 921210 F 5.0 B 4 N/A HA' TURBIN TURBlNE OVER$ PEED TEtt REACTOR NOT SHUT DOWN 20 921218 f 28.0 A 4 N/A HA GENERA- REPAlt CENERATCR HYDROCEN LEAK REACTOR WOT $ HUT 00kN 36.0 (1) (2) (3) (4)

F FORCED REASON METHOD EXHIBli C

  • INSTRUC110N$

$ . SCHEDULED A

  • EQUlPMENT FAILURE (EXPLAIN) 1
  • MANUAL FOR PREPARA110N Of DATA B MAINTENAkCE OR TE$i 2
  • AUTOMATIC $ CRAM. EVENT REPORT (LER)

D + REGULA10RT RE$1RICil0N 4

  • OTHER (EXPLAIN) flLE (NUREG.0161)

E OPERAfDR 1 RAINING + LICENSE EXAMINAi!DN

-F . A0 MINI $1RATiVE ($)

C

  • OPERA 110NAL ERROR (EXPLAlk) ,

H

  • OTHER(EXPLAIN) EXHlBli !
  • SAME $0VRCE

e e

UNil SHUTDCr. INS AND POVit REDutil0NS DOCLEt NO $0 278 UN11 NAME PEACH $0110M Unit 3 DATE JANUART 15, 1993 REPORT MONTH DICIMBER, 1992 COMPLt!!D BT PHILADELPHIA litC1RIC COMPANY M. J. BARON SUPERVISOR REPORil GROUP PEACH 00ff0M ATOMIC POWER $1Atl0N flitPHONE (717) 456 7014 tX1. 3321 METHOD OF LICENSEE SYlitMl COMPONEN! CAUSE AND CORRIC11VE ITPE DURA 110N REASON SHU1IING DOWN EVENT COO! CODE ACTION 10 NO. DAlt (1) (HOURS) (2) REAC10R (3) REPORT # (4) ($) PREVENT RICURRINCE 25 921219 F 12.0 H 1 N/A HF HIEXCH CLE AN CONDINSER WAffRBOXES t .....

I 12.0 t

I i

(1) (2) (3) (4)

F FORCED REASON . METHOD EXHIBIT G . INSTRUCTIONS i

5 SCHEDUltD A EQUlPMENT FAILURE (EXPLAIN) 1 MANUAL FOR PREPARAT104 0F DATA S MA!NithANCE OR TEST 2 MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C REFUELING 3 AUTOMATIC SCRAM. EVENT REPORT (LER) 0 REGULA10RT RESTRICil0N 4 OTHER (EXPLAIN) FILE (NUREG 0161) .

E OPERATOR TRAINING + LlCINSE EXAMINATION

. F ADMINISTRATIVE -($).

G CPERATIONAL ERROR (EXPLAIN)

H.* OTHER(EXPLAIN) EXHIBIT l

  • SAME SOURCE

- .