Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132E090 + (14:54:51, 12 December 2024)
- ML20132E087 + (14:54:52, 12 December 2024)
- ML20132E088 + (14:54:52, 12 December 2024)
- ML20132E084 + (14:54:53, 12 December 2024)
- ML20132E083 + (14:54:54, 12 December 2024)
- ML20132E081 + (14:54:55, 12 December 2024)
- ML20132E079 + (14:54:56, 12 December 2024)
- ML20132E080 + (14:54:56, 12 December 2024)
- ML20132E078 + (14:54:57, 12 December 2024)
- ML20132E074 + (14:54:58, 12 December 2024)
- ML20132E076 + (14:54:58, 12 December 2024)
- ML20132E071 + (14:55:00, 12 December 2024)
- ML20132E069 + (14:55:00, 12 December 2024)
- ML20132E068 + (14:55:01, 12 December 2024)
- RBG-21-559, Final Deficiency Rept DR-318 Re air-operated Damper Shaft Bushing Problems Associated W/Quality Air Design Ductwork. Initially Reported on 850712.Bushings Will Be Repaired by Application of Adhesive (Loctite 680) + (14:55:02, 12 December 2024)
- ML20132E066 + (14:55:02, 12 December 2024)
- IR 05000271/1985027 + (14:55:03, 12 December 2024)
- ML20132E060 + (14:55:04, 12 December 2024)
- ML20132E061 + (14:55:04, 12 December 2024)
- ML20132E058 + (14:55:05, 12 December 2024)
- ML20132E059 + (14:55:05, 12 December 2024)
- ML20132E056 + (14:55:06, 12 December 2024)
- ML20132E054 + (14:55:08, 12 December 2024)
- ML20132E053 + (14:55:09, 12 December 2024)
- ML20132E052 + (14:55:09, 12 December 2024)
- ML20132E051 + (14:55:10, 12 December 2024)
- ML20132E047 + (14:55:11, 12 December 2024)
- ML20132E049 + (14:55:11, 12 December 2024)
- ML20132E045 + (14:55:12, 12 December 2024)
- 05000255/LER-1985-007-01, :on 850621,safety Injection Tank (SIT) & HPSI Automatic Valve Inoperable Concurrently.Caused by Expected Low Level Condition During Boron Concentration Adjustment in SIT & Failed Control Switch in HPSI + (14:55:14, 12 December 2024)
- ML20132E042 + (14:55:15, 12 December 2024)
- ML20132E041 + (14:55:15, 12 December 2024)
- ML20132E040 + (14:55:16, 12 December 2024)
- ML20132E038 + (14:55:17, 12 December 2024)
- ML20132E036 + (14:55:17, 12 December 2024)
- ML20132E034 + (14:55:20, 12 December 2024)
- ML20132E032 + (14:55:21, 12 December 2024)
- ML20132E029 + (14:55:22, 12 December 2024)
- PNO-I-85-067A, on 850924-25,failed Reactor Protection Sys Breaker Removed & Examined.Failure Caused by Mechanical Binding within Breaker Closure Assembly.Investigation Continuing + (14:55:22, 12 December 2024)
- ML20132E023 + (14:55:23, 12 December 2024)
- PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35% + (14:55:24, 12 December 2024)
- ML20132E022 + (14:55:24, 12 December 2024)
- ML20132E019 + (14:55:25, 12 December 2024)
- ML20132E018 + (14:55:26, 12 December 2024)
- ML20132E016 + (14:55:26, 12 December 2024)
- IR 05000269/1985015 + (14:55:28, 12 December 2024)
- ML20132E011 + (14:55:29, 12 December 2024)
- ML20132E013 + (14:55:29, 12 December 2024)
- HL-5287, Submits Updated Info Re License Amend Application for Southern Nuclear to Become Licensed Operator.Tech Specs, Encl + (14:55:30, 12 December 2024)
- ML20132E008 + (14:55:30, 12 December 2024)
- RBG-22159, Submits Revised Paragraph for Item 1 of Encl 1 to No Significant Hazards Evaluation Filed w/850924 Application to Amend License NPF-40,changing HPCS Diesel Generator Sys + (14:55:31, 12 December 2024)
- ML20132E006 + (14:55:31, 12 December 2024)