.w.-.
- - _,~..-----..~. _ _ _.
i' f W'4 UNITED STATES g
- yg
- g NUCLEAR REGULATORY COMMISSION h (-
REGloN IV e
g 6i' 8
611 RYAN PLAZA DRIVE, SulTE 400 U+9
/
AR LINGioN, TEXAS 76011-8064 l
DEC I 71996 C. R. Hutchinson, Vice President Operations - Grand Gulf Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150
SUBJECT:
TEAM INSPECTION - NRC INSPECTION REPORT 50-382/97-01
Dear Mr. Hutchinson:
1 j
The purpose of this letter is to announce our Maintenance Rule Baseline Team inspection at your Grand Gulf Nuclear Station reactor facility. We have scheduled this inspection for February 24-28,1997. The designated inspection team leader, Mr. C. J. Paulk, of this office, will make arrangements with your staff to telephonically discuss the inspection plans in more detail.
The inspection objective will be to evaluate the effectiveness of your initial i
activities establishing baseline conditions to support compliance with the requirements j
of 10 CFR 50.65. The inspection will be conducted using Inspection Procedure 62706,
" Maintenance Rule." This inspection willinvolve a team of about six NRC personnel.
4 The inspection team will require information about your program and its implementation for their in-office preparation for the inspection. A description of the material that may be needed is in the enclosure to this letter. Our designated team leader will be contacting j
your staff and arranging for specific material to be available to the team by January 2, 1997.
if you have any questions concerning this inspection, please contact me at 817/860-8248 or Dr. Dale A. Powers, Chief, Maintenance Branch, at 817/860-8195.
I Sincer l
T omas P. Gwynn, Dir tor Division of Reacte ety Docket: 50-416 License: NPF-29 i
Enclosure:
(as stated) 9612200305 961217 PDR ADOCK 05000416 G
m__
3-4 Entergy Operations, Inc. a 1
cc:
Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 t
l Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 4
i Winston & Strawn 1400 L Street, N.W. - 12th Floor j
Washington, D.C. 20005-3502 J-Sam Mabry, Director Division of Solid Waste Management Mississippi Department of Natural Resources P.O. Box 10385 Jackson, Mississippi 39209 4
President Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 I
i Mr. Rod Rogers 68 7 j
j Bechtel Power Corporation Nuclear Operating Plant Services l
9801 Washington Boulevard Gaithersburg, Maryland 20878-5356 j
1' i
General Manager l
Grand Gulf Nuclear Station
}
Entergy Operations, Inc.
j P.O. Box 756 i
Port Gibson, Mississippi 39150 The Honorable William J. Guste, Jr.
4 Attorney General Department of Justice State of Louisiana P.O. Box 94005 4
Baton Rouge, Louisiana 70804-9005 5
m
d.
l Entergy Operations, Inc. t Office of the Governor State of Mississippi Jackson, Mississippi 39201 i
1 a
Mike Moore, Attorney General j
Frank Spencer, Asst. Attorney General j
State of Mississippi j
j P.O. Box 22947 i
j Jackson, Mississippi 39225 Dr. F. E. Thompson, Jr.
State Health Officer State Board of Health P.O. Box 1700 Jackson, Mississippi 39205 Eddie S. Fuente, Director State Liaison Officer Division of Radiation Health Mississippi Department of Health P.O. Box 1700 Jackson, Mississippi 39215-1700 Vice President Operations Support I
Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Director, Nuclear Safety and Regulatory Affairs Entergy Operations, Inc.
P.O. Box 756 i
Port Gibson, Mississippi 39150 Vice President, Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
I P.O. Box 756 Port Gibson, Mississippi 39150
h'
'a Entergy Operations, Inc. [bcc.to DMB (IEOli7DRSlDRP, andbec'o'rfi5issionirig I bec distrib. by RIV:
L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D)
MIS System Project Engineer (DRP/D)
RIV File Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10) ad
~J DOCUMENT NAME: r:\\_GG\\GG7011t.cjp To receive copy of document. Indicate in box: "C" = Copy ithout enclosures "E" = Copy wnh enclosures "N" = No copy RI:RIV C:MB D:DRS lQ CJPaulk/Imb DAPowers TPGwynn GI [
12/13/96 12/13/96 12/$96 OFFICIAL RECORD COPY
)
20000G
. =. -
Entergy Operations, Inc. :
bec to DMB (IE01)- DRS, DRP, and Decommissioning bec distrib. by RIV:
[
L. J. Callan Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D)
MIS System Project Engineer (DRP/D)
RIV File Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10) i a
l ad J
~
DOCUMENT NAME: r:\\_GG\\GG7011t.cjp.
To receive copy of document, indicate in box: "C" = Copy thout enclosures "E" = Copy with enclosures "N" = No copy i
RI:RIV C:MB D:DRS Q
CJPaulk/Imb DAPowers TPGwynn (// j~
12/13/96 12/13/96 12/$96 OFFICIAL RECORD COPY
c ENCLOSURE LIST OF ITEMS REQUESTED FOR IN-OFFICE REVIEW 1.
Copy of Maintenance Rule Program i
2.
Copies of procedures that directly relate to, and support, the Maintenance Rule Program 3.
List of systems, structures, and components, or functions, within the scope of the j
Maintenance Rule. This list should identify those structures, systems, and l
components, or functions that have been designated as risk significant.
4.
List of systems, structures, and components, or functions, that were excluded from the scope of the Maintenance Rulo, including justifications for exclusions 1
5.
List of systems, structures, and components, or functions, placed within the (a)(1) and (a)(2) Categories of the Maintenance Rule 6.
Background explanation for systems, structures, and components currently assigned to the (a)(1) category I
7.
Copy of any internal and external Maintenance Rule assessments or related audits 8.
Current Maintenance Rule trending data 9.
List of maintenance preventive functional failures for the previous two fuel cycles, with any repetitive failures identified 10.
Current program performance criteria and goals 11.
Risk Reduction Worth, Risk Achievement Worth, and Core Damage Frequency results 12.
Current organization chart depicting key personnelinvolved in the Maintenance Rule implementation and a list of their office telephone numbers 13.
Information on licensee personnel (engineering, operations, and maintenance)
Maintenance Rule functional responsibilities 14.