Forwards Safety Insp Repts 50-277/85-31 & 50-278/85-28 on 850729-0801 & Notice of Violation.Insp Conducted by State of Sc Dept of Health & Environ Control on 850729 of Radwaste Shipped to Chem-Nuclear Sys,Inc,Also Encl
ML20132E047
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/25/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20132E050 List:
References
NUDOCS 8509300369
Download: ML20132E047 (3)


See also: IR 05000277/1985031

Text

.

'

SEP 2 5 585

-

Docket Nos.

50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Report Nos. 50-277/85-31; 50-278/85-28

A special safety inspection of your transportation and radioactive waste pro-

grams was conducted by Mr. H. Bicehouse of this office on July 29 - August 1,

1985. Our findings were discussed with Mr. D. Smith of your staff at the con-

clusion of the inspection on August 1, 1985.

Areas of the transportation and radioactive waste programs examined during this

inspection are described in the NRC Region I Inspection Report which is enclosed

with this letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with personnel

and observations made by the inspector.

We have reviewed the actions taken to correct the violation brought to your

attention in the enclosure to our letter, dated January 29, 1985. The correc-

tive actions stated in your letter, dated February 28, 1985, appear to be ade-

quate to prevent recurrence.

In addition, an inspection was conducted by a representative of the South

Carolina Department of Health and Environmental Control on July 29, 1985 of a

shipment of radioactive waste from Peach Bottom Atomic Power Station. The ship-

ment was inspected upon its arrival at the Chem-Nuclear System, Inc., burial

site at Barnwell, South Carolina. Areas examined during this inspection are

described in a report by the representative of the South Carolina Department of

Health and Environmental Control, which is attached to the NRC Region I Inspec-

tion Report enclosed with this letter. The inspection consisted of a review of

shipping papers, placarding, marking and labeling, radiation measurements,

selective contamination surveys, and examination of the packages and the

tractor-trailer.

i

Based on the results of these inspections, it appears that certain of your ac-

tivities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

These vio-

lations have been categorized by severity level in accordance with the revised

NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register

Notice (49 FR 8583) dated March 8, 1984. You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

OFFICIAL RECORD COPY

CIR PB 85-31/28 - 0001.0.0

~

09/19/85

g\\

85o9300369 850925277

PDR

ADOCK O

PDR

O

j

.

.

.

~ Philadelphia Electric Co.

2

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

reouired by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

OriS nal Signed Ert

i

jf2r)

'

Thomas T. Martin, Direct

Division of Radiation Saf ty

and Safeguards

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I, Combined Inspection Report Nos. 50-277/85-31; 50-278/85-26

cc w/encls:

R. S. Fleischmann, Station Superintendent

John S. Kemper, Vice President,' Engineering and Research

Troy B. Conner, Jr. , Esquire (Without Report)

A. J. Pietrofitta,. General Manager, Power Production Engineering, Atlantic

Electric

Eugene J. Bradley,-Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

Public Document Room (POR)

Local .Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

i

bcc w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

Section Chief, DRP

J. Axelrad, IE

D. Holody

0FFICIAL RECORD COPY

CIR PB 85-31/28 - 0001.1.0

09/24/85

-

k-

m

.

i.

m

m

...

.

- m

.

.

.

.

.

-

.

.

-

.

.

9 Philadelphia Electric Co.

3

-,

4

I

9/ 0

W

RI:DRSS

{0d uj ,,,

RI:'{JRS J

H8icehous}e/mjh/(mmb

RI:DRSS

RI.

S

WPa sciak,,

RBellamy

TMa in

l

9/t /85

9// / 5

h

9 / 11 / 8 5 -

9/19 /85

D

RI:

R

P

JA

in-

TMu ey

5C0 ins

Ns

9/ J 85

9/ /8

9/ /85

0FFICIAL RECORD COPY

CIR PB 85-31/28 - 0002.0.0

09/19/85