ML20132E076

From kanterella
Jump to navigation Jump to search
Forwards Proprietary FNMCP Change Descriptions.Changes Do Not Decrease Effectiveness of Current MC&A Program.Encl Withheld (Ref 10CFR2.790(d))
ML20132E076
Person / Time
Site: 07001113
Issue date: 12/11/1996
From: Reda R
GENERAL ELECTRIC CO.
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19310E912 List:
References
NUDOCS 9612200360
Download: ML20132E076 (1)


Text

.

s ytt/nhi

)

yh ay'~'

1 I'A' GENuclearEnergy O' IN reewnunc cwwn PO Box 780, Wamingt;nt NC25402 9*0 675 5000 December 11,1996 Director Office of Nuclear Material Safety and Safeguards

. U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Attention:

Mr. R.- C. Pierson Licensing Branch, NMSS U.S. Nuclear Regulatory Commission Mail Stop T 8-D-14 Washington, D.C. 20555-0001

Subject:

Change in the Fundamental Nuclear Material Control Plan

References:

1) NRC License SNM-1097, Docket 70-1113 With reference to activities authorized by NRC License SNM-1097 at the GE fuel fabrication plant in Wilmington, North Carolina, GE is submitting the attached FNMCP changes pursuant to 10 CFR 70.32(c). These changes do not decrease the effectiveness of the current MC&A program.

Pursuant to 10 CFR 2.790(d), GE requests that the attachment to this letter be withheld from public disclosure as it contains information which identifies GE procedures for safeguarding licensed SNM.

Please contact Roy Bruce on (910) 675-5736 if you have any questions or would like to discuss this matter further.

Sincerely, GE NUCLEAR ENERGY

/

R. J.

eda, Manager 200033 Fuels and Facility Licensing g

/zb q

enclosure 17 J/

&l cc: RJR-96-136 9612200360 961211 PDR ADOCK 07001113 C

PDR