i
l
'
.
.
APPENDIX A
I
Philadelphia Electric Company
Docket Nos. 50-277
Peach Bottom Atomic Power Station
50-278
Units Nos. 2 and 3
License Nos. DPR-44
DPR-56
As a result of the inspection conducted on July 29-August 1,1985, and in
accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), published in
the Federal Register on March 8, 1984 (49 FR 8583), the following violations
were identified:
A.
10 CFR 71.5(a) requires each licensee who delivers licensed material to a
carrier for transport to comply with the requirements of the regulations
appropriate to the mode of transport of the Department Transportation in
49 CFR 170 through 189. 49 CFR 172.203(d)(iii) requires the activity
contained in the shipment to be included in the shipping papers.
Contrary to the above, shipping papers accompanying your shipment No.
145-85 on July 7-9, 1985, incorrectly listed the individual radioisotopic
activities and their total activity.
This is a Severity Level IV Violation (Supplement V).
B.
10 CFR 20.311(c) requires, in part, that each shipping manifest include a
certification by the waste generator that the transported materials are
properly described.
Contrary to this requirement, the shipping manifest accompanying your
Shipment No. 145-85 on July 7-9, 1985, certified that the transported
materials were properly described when the individual and total radio-
isotopic activities were incorrect.
This is a Severity Level V Violation (Supplement IV)
C.
10 CFR 71.87(i)(2) requires, in part, that levels of non-fixed radioactive
contamination on the external surfaces of each package offered for
shipment as exclusive use shipments not exceed 220 disintegrations per
minute per square centimeter at any time during transport.
Contrary to this requirement, non-fixed radioactive contamination in the
trunion cup area of the FSV-1 cask (an external surface of the shipping
package) used in your Shipment No. 169-85 to the low-level waste burial
site in South Carolina exceeded 220 disintegrations per minute per square
centimeter upon arrival on July 30, 1985.
Non-fixed radioactive contamin-
E
ation was measured to be 320 and 480 disintegrations per minute per
square centimeter.
OFFICIAL RECORD COPY
CIR PB 85-31/28 - 0003.0.0
8509300374 850925
09/18/85
gIHf
A04)CK O!N3002997
.
PEWt
-
-
- - -
.
-
.
-
.-.
.
.
.__
.
-
- .
h
..
.
.
Appendix A
2
i
'This is a Severity Level IV Violation (Supplement V)
~
~ Pursuant to the provisions of 10 CFR 2.201, Philadelphia Electric Company is
'
hereby required to submit to this office with 30 days of the date of the letter
transmitting this Notice, a written statement or explanation in reply,
including for these violations: (1) the corrective steps which have been taken
,
and the results achieved; (2) the corrective steps which will be taken to avoid
further violations; and (3) the date when full compliance will be achieved.
Where good cause.is shown, consideration will be given to extending the
response time.
.
!-
0FFICIAL RECORD COPY
CIR PB 85-31/28 - 0004.0.0
09/18/85