Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133D512 + (13:47:19, 12 December 2024)
- ML20133D511 + (13:47:19, 12 December 2024)
- 05000341/LER-1985-056, :on 850826,determined That Leak Rate Test Not Performed After Maint on Div II Thermal Recombiner on 850620.Leak Test on 850829 Indicated Excessive Leakage. Caused by Damaged Gasket.Gasket Replaced + (13:47:23, 12 December 2024)
- ML20133D506 + (13:47:24, 12 December 2024)
- IR 05000925/2010009 + (13:47:25, 12 December 2024)
- PNO-III-85-065A, on 850729,containment Spray Pump 1B Failed to Start Due to Incorrect Overcurrent Setpoint.Caused by Personnel Error.Licensee Investigation Complete.Erroneous Setpoint Could Have Existed Since 1984 W/No Pump Failures + (13:47:25, 12 December 2024)
- ML20133D501 + (13:47:26, 12 December 2024)
- ML20133D500 + (13:47:27, 12 December 2024)
- AECM-85-0022, Responds to NRC Re Inadequate Response to Violations Noted in Insp Rept 50-416/84-48.Results of Review Did Not Identify Further Misuse of Matl Types, Confirming That Generic Condition Did Not Exist + (13:47:28, 12 December 2024)
- ML20133D496 + (13:47:28, 12 December 2024)
- ML20133D495 + (13:47:29, 12 December 2024)
- ML20133D493 + (13:47:29, 12 December 2024)
- ML20133D491 + (13:47:30, 12 December 2024)
- ML20133D487 + (13:47:31, 12 December 2024)
- ML20133D486 + (13:47:31, 12 December 2024)
- ML20133D485 + (13:47:32, 12 December 2024)
- ML20133D484 + (13:47:33, 12 December 2024)
- ML20133D482 + (13:47:34, 12 December 2024)
- ML20133D483 + (13:47:34, 12 December 2024)
- ML20133D480 + (13:47:35, 12 December 2024)
- ML20133D481 + (13:47:35, 12 December 2024)
- ML20133D479 + (13:47:36, 12 December 2024)
- ML20133D477 + (13:47:37, 12 December 2024)
- 05000293/LER-1985-015, :on 850624,both Trains of Standby Gas Treatment Sys Started After Secondary Containment Isolation Received. Caused by Operator Error.Operations Personnel Instructed in Handling of Radiation Monitors + (13:47:38, 12 December 2024)
- ML20133D475 + (13:47:39, 12 December 2024)
- ML20133D473 + (13:47:40, 12 December 2024)
- ML20133D472 + (13:47:41, 12 December 2024)
- ML20133D468 + (13:47:41, 12 December 2024)
- ML20133D467 + (13:47:42, 12 December 2024)
- ML20133D466 + (13:47:43, 12 December 2024)
- B11741, Forwards Util Responses to NRC & Eg&G Idaho Comments at 850815 Exit Interview Re 850812-16 Audit of 10 Files Containing Environ Qualification Info for Equipment Located in Potentially Harsh Environs + (13:47:44, 12 December 2024)
- ML20133D465 + (13:47:44, 12 December 2024)
- ML20133D461 + (13:47:45, 12 December 2024)
- ML20133D458 + (13:47:46, 12 December 2024)
- ML20133D460 + (13:47:46, 12 December 2024)
- ML20133D457 + (13:47:47, 12 December 2024)
- ML20133D454 + (13:47:48, 12 December 2024)
- IR 05000213/1985012 + (13:47:49, 12 December 2024)
- ML20133D445 + (13:47:50, 12 December 2024)
- L-85-208, Responds to Violations Noted in Insp Repts 50-250/85-08 & 50-251/85-08.Corrective Actions:Operating Procedure OP 0204.2 Revised to Provide Explicit Instructions for Checking Charging Power Toggle Switch + (13:47:51, 12 December 2024)
- ML20133D441 + (13:47:51, 12 December 2024)
- ML20133D436 + (13:47:52, 12 December 2024)
- ML20133D432 + (13:47:53, 12 December 2024)
- ML20133D430 + (13:47:53, 12 December 2024)
- ML20133D428 + (13:47:55, 12 December 2024)
- ML20133D427 + (13:47:55, 12 December 2024)
- ML20133D424 + (13:47:56, 12 December 2024)
- ML20133D423 + (13:47:58, 12 December 2024)
- PNO-III-85-059, on 850716,facility Shut Down to Investigate Increasing primary-to-secondary Sys Leakage in Two Steam Generators.Cause Not Stated.Eddy Current Testing Will Be Performed to Locate & Plug Leaking Tubes + (13:47:59, 12 December 2024)
- ML20133D416 + (13:48:00, 12 December 2024)
- ML20133D412 + (13:48:01, 12 December 2024)
- ML20133D415 + (13:48:01, 12 December 2024)