ML20133D473
| ML20133D473 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 01/03/1997 |
| From: | Rogge J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Feigenbaum T NORTHEAST UTILITIES |
| References | |
| NUDOCS 9701090206 | |
| Download: ML20133D473 (2) | |
See also: IR 05000443/1996008
Text
_.
.
_
._.
_
.. ._
_ _ _ __
. . _ _ .
. . _
_.
.
_.
.
.
.
j
January 3, 1997
1
.
l
Mr. Ted C. Feigenbaum
Executive Vice President and Chief Nuclear Officer
,
Northeast Utilities Service Company
c/o Mr. Terry L. Harpster
i
Post Office Box 128
Waterford, CT 06385
SUBJECT:
NRC INSPECTION REPORT 50-443/96-08
)
1
Dear Mr. Feigonbaum:
This letter refers to your December 20,1996 correspondence, in response to our
November 22,1996 letter.
Thank you for informing us of the corrective and preventive actions documented in your
letter. These actions will be examined during a future inspection of your licensed program.
Your cooperation with us is appreciated.
Sincerely,
Criqinal Sigr:ed By:
John F. Rogge, Chief
Projects Branch 8
Division of Reactor Projects
Docket No. 50-443
cc w/o cv of Licensea's Response:
B. D. Kenyon, President - Nuclear Group
D. M. Goebel, Vice President - Nuclear Oversight
F. C. Rothen, Vice President - Work Services
J. K. Thayer, Vice President - Recovery Officer, Nuclear Engineering & Support Officer
H. F. Haynes, Director - Nuclear Training
B. L. Drawbridge, Executive Director - Services & Senior Site Officer
A. M. Callendrello, Licensing Manager - Seabrook Station
_
/
'
W. A. DiProfio, Nuclear Unit Director - Seabrook Station
R. E. Hickok, Nuclear Training Manager - Seabrook Station
,3 I
/
L. M. Cuoco, Senior Nuclear Counsel
'
j
9701090206 970103
ADOCK 05000443
G
._ _
_ .
.. .
-
,
' -
,
Mr. T. C. Feigenbaum
2
cc w/cv of Licensee's Response:
W. D. Meinert, Nuclear Engineer
D. C. McElhinney, RAC Chairman, FEMA RI, Bostaa. Mass.
,
R. Backus, Esquire, Backus, Meyer and Solorr
" o.v Hampshire
l
S. Choi, Director, Nuclear Safety, Massachuset
nergency
Management Agency
l
F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power
l
Corporation
Commonwealth of Massachusetts, SLO Designee
,
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
l
Seacoast Anti-Pollution League
i
State of New Hampshire, SLO
'
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
S. Comley, Executive Director, We the People of the United States
Distribution w/cv of licensee resoonse Itr:
Region i Docket Room (with concurrences)
l.
Nuclear Safety information Center (NSIC)
'
PUBLIC
NRC Resident inspector
J.Rogge,DRP
E. Conner, DRP
D. Screnci, PAO
W. Dean, OEDO
M. Callahan, OCA
R. Frahm, Jr., NRR (RKF)
D. Screnci, PAO, ORA
Inspection Program Branch, NRR (IPAS)
DOCUMENT NAME:
G:\\ BRANCH 8\\SB\\96-08.RPY
To receive a copy of this document, indicate in the box: 'C" = Copy without attachment / enclosure
"E" - Copy with attachment / enclosure
'N" = No copy
0FFICE
RI/DRP
,- l
l
/
l
l
,
NAME
JRogge (/VV
DATE
01/02/97
0FFICIAL RECORD COPY
i
_
. . _ . . _
. . _ ,
. . . _ _ _
_ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ . . .
- _ _ _ . . _ _ ~
_
'
_:-
u '
,.
Northcast
107 seiden sireer, wrun.cr 0o037
A 08 b 6 OM
7
Northeast Utilities Service Company
(
P.O. Box 270
Ilartford, CT 06141-0270
(860) 665-5323
l
!
Ted C. Feigenbaum
Executive Vice President and
Chief Nuclear Officer
'
December 20,1996
Docket No. 50-443
NYN-96089
,
l'
l
United States Ni , lear Regulatory Commission
'
' Attention:
Document Control Desk
l
Washington, D.C. 20555
l
l
Seabrook Station
Reply to a Notice of Violation
In a letter lated November 22,1996' the NRC described a violation for covering floor drains m the
emergency feedwater pump house during painting retivities, which constituted a change to the
facility as described in the UFSAR, without performance of a safety evaluation. Accordingly, the
enclosure provides North Atlantic Energy Service Corporation's (North Atlantic) response to this
!
violation.
North Atlantic is making certain commitments in response to this violation. The commitments are
. fully described in the enclosure to this letter.
l
Should you have any questions concerning this response, please contact Mr. Anthony M.
j
Callendrello, Licensing Manager, at (603) 773-7751.
l
Very truly yours,
NORTH ATLANTIC ENERGY SERVICE CORP.
l
(W
p A-
-
l
T. C. FeigenWum
1
'
cc:
H. J. Miller, Regional Administrator
A. W. De Agazio, Sr. Project Manager
l
J. B. Macdonald, NRC Senior Resident Inspector
!
E
8
NRC Inspection Report 96-G8, dated November 22,1996, J. F. Rogge to T. C. Feigenbaum.
]
Ol$0SN-
8
8
,
4
W
0
ENCLOSURE 1 TO NYN-96089
,
l
,
I
i
l
i
l
i
)
i
\\
i
I
i
1
l
._
_ _ _
_
_ ._. _ _. _ _ _ _
___
_ _ _ _ _ _ _
__
'
.
.
I
REPLV TO A NOTICE OF VIOLATION
NRC Inspection Report 96-08 described a violation for covering floor drains in the emergency
feedwater (EFW) pump house during painting activities, which constituted a change to the facility
as described in the UFSAR, without performance of a safety evaluation. North Atlantic's response
to this violation is described below.
l
I.
Description of Violation
The following is a restatement of the violation VIO 96-08-01:
-
,
10 CFR 50.59, Changes, tests and experiments, allows changes to be made to the facility as
!
described in the final safety analysis report, without prior Commission approval, provided that
the proposed change does not involve an unreviewed safety question or a change in technical
i
specifications incorporated in the license. The North Atlantic Regulatory Compliance Manual
Chapter 3.0, Section 3.0 contains the station specific requirements and process for performing
and documenting safety evaluations to determine if an unreviewed safety question exists
l
pursuant to the requirements of 10 CFR 50.59.
Contrary to the above, on August 21, the inspector identified three,4-inch floor drains in the
EFW pump house were covered with tape during painting activities, which constituted a change
to the facility as described in the Updated Final Safety Analysis Report (UFSAR), without
performance of the required safety evaluation to determine if the change constituted an
.
unreviewed safety question or required a change to technical specifications. UFSAR Section
l
9.3.3.2.b.8 indicates the EFW pump house contains five,4-inch floor drains and two,2.5-inch
floor drains designed to accommodate 75 gallons per minute (gpm) leakage. UFSAR Section
9.3.3.3, " Safety Evaluation," indicates the equipment and floor drainage system is operable
during all modes of operation.
l
This is a Severity Level IV violation (Supplement I).
!
l
II.
Reason for the Violation
Backround
l
Nonh Atlantic agrees with this violation. As stated in the description of the violation, three,4-
inch floor drains in the EFW pump house were covered with tape during painting activities. The
,
(
painters were following procedure, MS0599.45, Revision 0, Change 3, " Coating of Service Level
'
III Surfaces," which required the covering of floor drains in the immediate work area to prevent
washing solutions and/or debris from entering the floor drain system. Also in accordance with
the procedure, Control Rooni personnel were notified of the floor drains that were plugged and
,
j
when the plugs were removed. No 10 CFR 50.59 evaluation was completed for covering of the
'
floor drains. Similarly, no 10 CFR 50.59 evaluation was completed for procedure MS0599.45,
i
which allowed covering of the floor drains. However, a 10 CFR 50.59 applicability review had
r
1
.
been completed for this procedure and it was determined that a 10 CFR 50.59 evaluation was not
required.
Upon identification of this condition, the Control Room was notified and the painting activities
in the EFW pump house were stopped and the floor drains unplugged. Adverse Condition
Report (ACR)96-765 was initiated to investigate this event, determine the cause and develop
corrective actions. This evaluation determined the apparent cause of this event to be insufficient
awareness of the impact of actions on nuclear safety or reliability.
Subsequently, ACR 96-1219 was initiated to document the violation and to address the broader
implications. In response, the Management Review Team (MRT) requested the completion of a
formal root cause analysis, for which the Barrier Analysis technique was employed. The broader
implications review was accomplished by utilizing a sufficiently broad problem statement to
envelop other recently identified changes where a 10 CFR 50.59 evaluation had not been
i
completed. These other occurrences we identified as a result ofincreased Station emphasis on
the discovery and resolution of UFSAR discrepancies. A root cause analysis could have been
j
limited to the occurrence cited in the violation, however, North Atlantic believes that this would
have been too narrow in focus, end would not address the broader implications. The following
'
problem statement was used for the root cause malysis:
Temporary changes to the facility are not consistently recognized as potentially affecting
the design basis, i.e., meeting the requirements for a 10 CFR 50.59 evaluation.
Barrier Analysis typically begins by identifying the hazard (i.e., the undesired consequence) and
the target (i.e., the desired result). In this case the hazard is making changes to the facility as
described in the UFSAR without the required 10 CFR 50.59 evaluation, and the target is
recognizing changes to the facility with subsequent completion of the required 10 CFR 50.59
evaluation. The next step is determining what barriers would be effective at preventing the
hazard. These barriers are not necessarily limited to those that currently exist. For this
evaluation, the barriers of interest are exclusively programmatic barriers, rather than physical
barriers or restrictions.
i
The definition of root cause is the basic reason or reasons for an event which, if corrected, would
prevent or minimize recurrence or consequences of the event. The event that was the subject of
the violation was the result of failure of the administrative requirements barrier. Without the
existence of a second person review, a single human error can result in program failure, i.e., a
change to the facility as described in the LTSAR without the required 10 CFR 50.59 evaluation.
However, the root causes applicable to the problem statement address the broader implications.
In this regard, three primary causes and one contributing cause was identified as described
below.
2
.. _
.
.
.
Primary Causes
Management's Expectations Were Not Well Defined
a.
The expectations for the thoroughness of the 10 CFR 50.59 applicability screenings
performed on procedures and procedure changes were not adequately ccnununicated to
i
North Atlantic personnel.
b.
Lack of Management Review of the Adequacy of 10 CFR 50.59 Applicability
i
Screening
There was no management review of the adequacy of 10 CFR 50.59 applicability screenings
performed on procedures and procedure changes, nor was there specific reinforcement of the
need for thoroughness.
Insufficient Refresher Training on 10 CFR 50.59
c.
i
There is no periodic re-qualification required for perfonnance of the applicability screening
or the actual 10 CFR 50.59 evaluation. Field evidence indicates that most of the problems
relate to recognizing that a 10 CFR 50.59 evaluation is required, rather than the quality of 10 CFR 50.59 evaluations.
Contributing Cause
One contributing cause was determined for this event:
a.
Lack of Appropriate Tools
The current UFSAR electronic search tool is difficult to use.
II.
Corrective Actions
The following corrective actions address both the event cited in the violation and the primary and
contributing causes from the Barrier Analysis:
1.
After receipt of the Notice of Violation, North Atlantic performed a 10 CFR 50.59
evaluation for covering of the floor drains in the EFW pump house. This evaluation
determined that covering of the floor drains did not create an unreviewed safety question.
2.
Procedures MS0559.45, " Coating of Service Level III Surfaces," and MS0517.23,
" Service Preparation and Coating of Service Level I Surfaces," have been revised to
require a 10 CFR 50.59 evaluation prior to plugging or blocking any floor drain.
Additionally, these procedures now indicate the importance of blocking any floor drains.
3
.
.
-
.
.
3.
Procedure MA 3.0, " Work Control Practices," has been revised to ensure pre-job
briefings discuss work area setup and the potential impact on the plant design (e.g., doors
propped open, floor drains covered, seismic impact) that may require a prior Engineering
safety evaluation.
4.
North Atlantic described this event, the violation, and the need for a 10 CFR 50.59 safety
evaluation in the November 22, 1996 edition of "Seabrook Today," a site-wide
publication. This article stressed that subtle changes in the plant, e.g., propping open
doors, storing equipment or tools in seismic areas, taping over drains, etc. could violate
design basis requirements.
5.
Procedures ON1044.02, " Oil / Water Separation System Operation," and OS1025.01,
" Floor and Equipment Drain System Operation," will be revised to add a precaution to
provide awareness that in-plant drainage capability should be assessed prior to disabling
portions of the plant drainage systems. It is anticipated that these procedures will be
revised by January 15,1997.
6.
This event will be discussed with Operations and Engineering Support Personnel as part
of continuing training. It is anticipated that this training will be completed by October 1,
1997.
7.
North Atlantic will identify drains that cannot be plugged unless Engineering is notified
to perform a 10 CFR 50.59 evaluation. It is anticipated that this evaluation will be
completed by January 15,1997.
E-
The North Atlantic Regulatory Compliance Manual (NARC) will be revised to:
Provide additional guidance for performing the determination of applicability for 10
CFR 50.59 evaluations for manual / procedure revisions and intent changes.
Require the conclusions of the determination of applicability for 10 CFR 50.59
evaluations for manual / procedure revisions and intent changes to be supported by a
written basis and to include a list of UFSAR chapters and'or related documents that
were reviewed while performing the applicability determination.
Require that each 10 CFR 50.59 evaluation that includes a safety evaluation to state
and provide a basis for whether or not the UFSAR requires an update to reflect the
effects of the chang , test or experiment.
It is anticipated that these procedure changes will be implemented by Febmary 28,1997.
9.
North Atlantic will provide periodic refresher training on 10 CFR 50.59 evaluations. It is
anticipated that the first periodic training session will be completed by August 31,1997.
I
'
4
1
-
.
- =. .
_
- ..
..
,
.
4
.. .
.
-
.
.
!
7
10.
North Atlantic will implement a new, more user friendly word search software package to
4
perform key word searches of the UFSAR. It is anticipated that v a new word search
tool will be implemented by February 28,1997.
11.
North Atlantic will revise administrative requirements to ensure that supervisors and
,
,
managers that approve procedures and procedure changes receive 10 CFR 50.59 training.
'
It is anticipated that the appropriate administrative requirements will be revised by
February 28,1997.
,
,
12.
The Station Director' will reinforce management's expectations to the preparers,
reviewers, and approvers of 10 CFR 50.59 evaluations regarding the thoroughness of 10
'
j
CFR 50.59 applicability reviews and evaluations. It is anticipated that this will be
l
completed by January 31,1997.
J
III. Date When Full Comnliance Will be Achieved
4
North Atlantic is currently in compliance with regulatory requirements.
,
!
l
4
3
1-
i
,
l
,
.
'
l
>
i
'
1
,
5