ML20133D436
| ML20133D436 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 03/26/1985 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8507220205 | |
| Download: ML20133D436 (2) | |
Text
..
wtmuL Snur NmhurQwrutuxnikfurtrnent treI%uknt itat ofecelka#x%6 s,
M' 4M"U One)snas Rirwikza I.%re>rst Vsryttnien 2f.Y>l tWM mi. 4 %I
- 5 ta i all : 08 March 26, 1985 MRIMUM POONM Dr. J. Nelson Grace Serial No:
721A Regional Administrator N0/sbe:cfm
-~
Region II Docket nos. "50-338
'U. S. Nuclear Regulatory Commission
~ 50-339 101 Marietta Street, Suite 2900 License nos. NPF-4 Atlanta, Georgia 30323 NPF-7 l
Dear Dr. Grace:
1 In our letter of December 26, 1984, which was in response to a notice of violation in IE Inspection Report Nos.
50-338/84-40 and 50-339/84-40, we stated that the expected completion date for the system evalution of the turbine building sump was February 28, 1985 and 'or the RWST vent was April 15, 1985. It is now expected that the cost, scope and scheduling for these evaluations will be completed by
-July 15, 1985. Any further actions required to implement the recomm-endations made as a result of these studies will be scheduled and implemented as required.
In addition, the completion date for the changes to the training pro-gram were expected to be completed during the second training cycle i
rotation for operations personnel in 1985. The initial training has been completed for the' operations personnel and the revisions to the training programs are expected to be completed by September 1,1985.
Ve y trul ours,
f b
[y%av "
W. L. Stewart No' Attachment 8507220205 B50326 PDR ADOCM 05000338 0
PDR Sgo\\
a_'
i
/
4
. t.-
.. t r. '
S. q. l.
cc: - Mr. Roger D. Walker, Acting Director
- iAT-
-Division of Project and Resident Programs np 1
3 tw,,.
i Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing i
Mr. M. W. Branch h1C Resident Inspector i
North Anna Power Station i
I f
i 4
+
1 i
i i
i l
i 1
?
i m
.