Summarizes Current Status of Efforts Concerning Reevaluation of Control/Distribution of Controlled Drawings,Per 850522 Request & Nuclear Performance Enhancement Program.Three Addl Locations Provided W/Complete Controlled Drawings
ML20133D496
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/30/1985
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-85349, NUDOCS 8510090077
Download: ML20133D496 (2)


Text

.

Seubiicservie-

==<= -

16805 WCR 19 1/2, Platteville, Colorado 80651 3 3 @ MO.W S %

)

September 30, 1985

! OCT - 2 885 Fort St. Vrain

)

Unit No. 1 d

F-85349 Regional Administrator Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Attn: Mr. Dorwin R. Hunter Docket No. 50-267

SUBJECT:

Updating Controlled Drawings

REFERENCE:

1) G-85195, Letter dated May 22, 1985, Johnson to Lee.
2) P-85178, Letter dated May 22, 1985, Gahm to Martin.

Dear Mr. Hunter:

By way of Reference 1, the Nuclear Regulatory Commission requested Public Service Company of Colorado to re-evaluate the Fort St.

Vrain program for control / distribution of controlled drawings.

Reference 2 provided an overview of the anticipated program for drawing control to be undertaken as part of the Nuclear Performance Enhancement Program (NPEP) at Fort St.

Vrain.

We have completed our re-evaluation as requested. This letter provides the current status of our efforts.

Administrative Procedure G-9, Controlled Work Procedures, requires that the Nuclear Construction Coordinator ensures update of Control Room / Shift Supervisor design documentation and signs and dates the CWP cover sheet upon completion.

1 In addition, three more locations have been identified where it is necessary to maintain complete, current, controlled drawings (P&I's, IC's, IB's and E-1203's).

These are:

The Scheduling Office,

[

8510090077 850930 PDR ADOCK 05000267 f0 WO Qh Q p

PDR

Building 10 (for' general use to reduce SS/CR traffic) and Don Hood's Office (interim - for SOP, EP rewrite). Nuclear Engineering' Division has also been supplied with
a. cross reference of in plant P&I's

-verses location. These three locations plus the in plant P&I's will be updated and filed promptly (<5 days) by NED.

We believe that' our re-evaluation of the control distribution of controlled drawings issue has resulted in a comprehensive. program.

If you have any questions in this regard, please contract Mr. Mike Holmesat(303)571-7511.