Malling Address Atbim:a Powsr Comptny 600 North 18th Streat Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald g *,f6 Senior Vice President aC O
gg Fhntndge Building Ud
/\\labania POWCf
.c
~,
.,y c s
,y May 20, 1985 Docket No. 50-348 Docket No. 50-364 Mr. D. M. Verrelli U. S. Nuclear Regulatory Comission Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, GA 30323
SUBJECT:
J. M. Farley Nuclear Plant NRC Inspection of March 18 - 22, 1985 RE:
Report Numbers 50-348/85-17 50-364/85-17
Dear Mr. Verrelli:
This letter refers to the violation cited in the subject inspection reports which states:
"The following violation was identified during an inspection conducted on March 18 - 22, 1985. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2 Appendix C).
10CFR50.54(a)(1) requires Alabama Power Company (APCo) to implement the Quality Assurance Program described or referenced in its Safety Analysis Report. Section 17.2.5 of the APCo Quality Assurance Program requires that activities affecting quality shall be prescribed by documented instructions, procedures or drawings and shall be accomplished in accordance with these instructions, procedures or.
drawings. Administrative Procedure FNP-0-AP-52 established administrative controls for identifying, controlling, scheduling, authorizing, and' documenting maintenance and maintenance-related activities. Section 7.5.16.1.of Administrative Procedure FNP-0-AP-52, states, in part, that revisions to the work sequence must be approved by the. appropriate Group Supervisor or his designee.
8507220214 850520 PDR ADOCK 05000348 i
G PDR L.80f
r I
t l'
- Mr. D. M..V2rralli May 20,- 1985 Page Two Contrary to the'above, the work sequence specified on Maintenance Work Request No.- 107514 was changed without appropriate review and approval as specified in LSection 7.5.16.1 of Administrative t
Procedure FNP-0-AP-52, Revision 5.
i l
This is a Severity level V violation (Supplement I)."
Admission or Denial The above violation occurred as described in the subject report.
l' Reason for Violation l
The violation occurred due to a procedural deficiency. The procedure listed at the bottom of the " work sequence" block was intended as a reference only (not a part of the work sequence) but was not labeled as such.
Corrective Action Taken and Results Achieved No immediate corrective action was required.
Corrective Steps Taken to Avoid Further Occurrences FNP-0-AP-52 will be revised to address the listing of references independently from the work sequence.
Date of Full Compliance June 30, 1985 l
Affirmation
-I affirm that this response is true and complete to the best of my knowledge, information and belief.
- The information contained in this letter is not considered to be of a
. proprietary nature.
i.
l.
Yours very truly, R. P. Mcdonald RPM: sam /F2, l