Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-21661, Final Deficiency Rept DR-304 Re Potential Wall Thickness Problem W/Jones & Laughlin in Steel Corp & Phoenix Steel SA106 Gr B Pipe.Condition Not Reportable Under 10CFR50.55(e) + (13:20:32, 12 December 2024)
- ML20133G093 + (13:20:33, 12 December 2024)
- ML20133G095 + (13:20:33, 12 December 2024)
- IR 05000626/2007003 + (13:20:34, 12 December 2024)
- ML20133G086 + (13:20:37, 12 December 2024)
- ML20133G084 + (13:20:38, 12 December 2024)
- ML20133G083 + (13:20:39, 12 December 2024)
- ML20133G082 + (13:20:39, 12 December 2024)
- ML20133G077 + (13:20:40, 12 December 2024)
- ML20133G076 + (13:20:42, 12 December 2024)
- ML20133G074 + (13:20:42, 12 December 2024)
- ML20133G072 + (13:20:43, 12 December 2024)
- ML20133G070 + (13:20:44, 12 December 2024)
- ML20133G071 + (13:20:44, 12 December 2024)
- ML20133G068 + (13:20:45, 12 December 2024)
- ML20133G064 + (13:20:46, 12 December 2024)
- ML20133G065 + (13:20:46, 12 December 2024)
- ML20133G063 + (13:20:47, 12 December 2024)
- IR 05000382/1996023 + (13:20:54, 12 December 2024)
- ML20133G060 + (13:20:55, 12 December 2024)
- ML20133G057 + (13:20:56, 12 December 2024)
- ML20133G059 + (13:20:56, 12 December 2024)
- ML20133G054 + (13:20:57, 12 December 2024)
- ML20133G053 + (13:20:58, 12 December 2024)
- ML20133G048 + (13:20:58, 12 December 2024)
- ML20133G046 + (13:20:59, 12 December 2024)
- ML20133G043 + (13:21:00, 12 December 2024)
- ML20133G040 + (13:21:01, 12 December 2024)
- ML20133G041 + (13:21:01, 12 December 2024)
- 05000454/LER-1985-062, :on 850627,automatic Reactor Trip Initiated on Overtemp Differential Temp.Caused by Loss of Two Tripped Circulating Water Pumps.Control Circuits Replaced & Separated Into Three Cabinets + (13:21:03, 12 December 2024)
- ML20133G037 + (13:21:05, 12 December 2024)
- ML20133G035 + (13:21:05, 12 December 2024)
- ML20133G034 + (13:21:06, 12 December 2024)
- 05000259/LER-1985-026-01, :on 850701,cable Trays Found to Be Excessively Loaded & Not Properly Qualified Seismically.Caused by Continual Mods Requiring Addition of Fire Retardant to Cables & Design Interface Problems + (13:21:08, 12 December 2024)
- ML20133G029 + (13:21:09, 12 December 2024)
- ML20133G028 + (13:21:10, 12 December 2024)
- 05000245/LER-1985-011, :on 850719,oysters Sampled Indicated Presence of Co-60 Exceeding Control Station Average by Factor Greater than 10.Caused by High Degree of Sensitivity of Measuring Background Samples + (13:21:13, 12 December 2024)
- ML20133G026 + (13:21:14, 12 December 2024)
- ML20133G025 + (13:21:15, 12 December 2024)
- ML20133G024 + (13:21:15, 12 December 2024)
- 05000397/LER-1985-044, :on 850628,fuel Oil Intended for Use in Auxiliary Boilers Inadvertently Added to Standby Diesel Generator Fuel Oil Storage Tanks.Caused by Personnel Error. Storage Tanks Sampled & Analyzed + (13:21:17, 12 December 2024)
- ML20133G021 + (13:21:18, 12 December 2024)
- RBG-21768, Forwards Response to 850802 Request for Addl Info Re Reactor Protection Sys.Info Suppls Fsar.Proposed Tech Specs Not Affected + (13:21:19, 12 December 2024)
- CLI-84-11, Forwards Listed Handwritten Notes & Documents Used by NRC in Preparing SER Re Certification of Equipment Qualification, Per CLI-84-11.Documents Will Be Available in PDR & Lpdr + (13:21:20, 12 December 2024)
- ML20133G018 + (13:21:20, 12 December 2024)
- ML20133G016 + (13:21:21, 12 December 2024)
- ML20133G014 + (13:21:22, 12 December 2024)
- RBG-21802, Responds to NRC Request for Info.Current Operating Procedures Require That No Action Be Taken from Outside Main Control Room to Safely Shut Down Plant Following Dba. Operators Trained in Use of Procedures + (13:21:22, 12 December 2024)
- ML20133G011 + (13:21:23, 12 December 2024)
- ML20133G007 + (13:21:27, 12 December 2024)
- ML20133G004 + (13:21:28, 12 December 2024)