ML20133G018
| ML20133G018 | |
| Person / Time | |
|---|---|
| Site: | University of Missouri-Columbia |
| Issue date: | 01/09/1997 |
| From: | Shankmam S NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Kutikkad D MISSOURI, UNIV. OF, COLUMBIA, MO |
| References | |
| NUDOCS 9701150103 | |
| Download: ML20133G018 (2) | |
Text
__._
L' SA:EL ADS X G A" A 182 January 9, 1997 SFP0:GMB i
Mr. Das Kutikkad Reactor Physicist University of Missouri UFON RE!50 AL OF ATTACl!!AENT Tilm cacET 2 Research Park y.c 3nbc6 c[
Columbia. MO 65211 ggggf / /s Gr</4SDNd
Dear Mr. Kutikkad:
e This 1s in regard to your Novemberd.1996.irequest 'for 'an a)p'roval of a route for transporting spent fuel +from the University of Missour,1 Research Reactor i
j to the Savannah River Plant. Aiken < South Carolina. ',
3 The route in Enclosure 1 meets the re'gulator'y: requirements of 10 CFR 73.37. constitutes approval for this route'through December'31, 1998.
Note that transportation of licensed radioactive material must. be conducted in compliance with applicable U.iS Department of Transportation regulations.
NRC staff have completed the arrangements'with local law enforcement agencies i
rer;uired by 10 CFR 73.37(b)(6).
Note that armed escorts are required for the following urbanized areas:
St. Louis. Missouri: Nashville.. Tennessee: Atlanta and Augusta. Georgia.
Information on these arrangements 1s.provided in
!. and is to be incorporated into your shipment plans and provided 2
to your carrier along with instructions-regarding its use.
devlates from the a) proved route. please 3rovide details of..If your carrier i
the deviation to the contact listed Jelow as soon as possi)le' l
The notification requirements of 10 CFR 73.37(f) and 73.72 ap<R 73.72. please ly for each shipment.
When making notification to this office.under 10 confirm that armed escort will be provided as required, and that the appro-priate governors or designees will or have been notified.
I Should you require additional information or have guestions concerning this i
matter, please contact John Cook of my staff at (301) 415-8521.
J Sincerely.
Susan F. Shankman Chief W ADO K Transportation, Safety and Inspection Branch O
86 F
PDR Spent Fuel Project Office Nuclear Material Safety and Safeguards Docket No. 50-186
Enclosures:
(.
I As stated DISTRIBUTION:
05000186C60R l
w/ enclosures:
w/o enclosures:
Docket-File' 50-1867 NMSS/SFP0 R/F CJPaperiello Case File 50-186 RFonner MRodgersItEpEyp yu #% $hh ;,
TT RekionsIII&II MMessier PD (Enclosure 1)
TAC - L22361
.4 A.-
OFC I SFP0 b
C SFP0 C-SFP0 nSU 0-I ennington ~
3RCook
///MIEaston MSkankman NAME-GMB DATE 12/12/96 01/4/97 N/9/97 01/Y/97 j
0FFICIAL RECORD COPY 150010 C = COVER E = COVER & ENCLOSURE N = NO COPY
}
{
Document Transmitted HerewittiSU ARJS
- !
- "'W K'm';
8 Contains Safeguards Information -
i
- StSte, b,
0 e
s kM SPENT FUEL PROJECT OFFICE 0FFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS DECEMBER 1996 IRRADIATED REACTOR FUEL ROUTE
SUMMARY
UNIVERSITY OF MISSOURI, COLUMBIA, M0 TO DOE SAVANNAH RIVER PLANT, SC (182)
V
]
w 1es U
J
\\w v
l W
T Page 1 of 2
i i
IRRADIATED REACTOR FUEL ROUTE
SUMMARY
UNIVERSITY OF MISSOURI, COLUMBIA. M0 TO DOE SAVANNAH RIVER PLANT, SC STATE WAYPOINT/ INSTRUCTION ROAD DIR TOWARDS MILES TO CtMAATIVE IEXT MILES WAYPOINT M0 DEPART UNIV. OF M0 MD-163 N
JEFFERSON
.5 0
CITY M0 GO TOWARDS JEFFERSON MD 740 E
JEFFERSON 2
.5 CITY CITY M0 TAKE M0 6310 WARDS M0-63 N
JEFFERSON 2
2.5 1-70 CITY M0 TAKE l-70 TOWARDS ST.
1-70 NW ST. LOUIS 106 4.5 LOUIS 1
M0 AT l 270 GO SOUTH I 270/
E/S ILLIN0IS 22 110.5 1255 TINE 4
M0 STATE MILEAGE SUBTOTAL 132.5 IL CONTINUE ON 1 255 1 255 SE MT. VERNON 23 132.5 It TURN ON 1 64 1-64 E
MT VERNON 67 155 5 il TAKE l-57 SOUTH 1 57 5
PULLEYS MILL 53 222 5 IL TURN ON 1 24 SOUTH I-24 5
KENTUCKY 35 275.5 i
LINE IL STATE MILEAGE SUBTOTAL 178 KY CONTINUE ON 1-24 1 24 SE TENNESSEE 95 310.5 LINE KY STATE MILEAGE SUBTOTAL TN STAY ON 1 24 1 24 SE NASHVILLE 43 405 5 TN TAKE I-265 WEST l-265 W
NASHVILLE 2
448.5 TN AT l-40 G0 WEST I-40 W
NASHVILLE 1
450 5 TN TURN ON 1-440 1-440 SE NASHVILLE 7
451.5 TN AT l-24 TURN 1 24 SE GEORGIA LINE 133 458.5 SOUTHEAST TN STATE MILEAGE StBTOTAL 186 GA 1-24 TURNS TO I-75 1-75 SE ATLANTA 93 591.5 GA AT l-285 GO EAST I-235 E
ATLANTA 26 684.5 GA TAKE l-20 TO SOUTH I-29 SE SOUTH 141 710.5 CAROLINA LINE CAROLINA LINE GA STATE MILEAGE $1ST0TAL 260 SC CONTINUE ON 1-20 1-20 NE AIKEN 18 851 5 SC TURN ON SC-19 SC-19 S
NEW ELLENTON 14 859 5 SC CONTINUE ON SC-19 SC-19 5
FACILITY 6
883.5 SC STATE MILEAGE SLBTOTAL 38 ROUTE TOTAL 889.5
[
Page 2 of 2
-