ML20133G048
| ML20133G048 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/10/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Sellman M ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20133G051 | List: |
| References | |
| NUDOCS 9701150112 | |
| Download: ML20133G048 (5) | |
See also: IR 05000382/1996023
Text
.. . _ _ .
.
.
..
--
. - . _ - - - . - . . - . . - _ - . -
. .
- - . - .
!
'
l
"
I
[g* "f Gia
UNITED STATES
j
ft
NUCLEAR REGULATORY COMMISSION
i
'
-
-
REGloN Iv
- '
g
7
l
%;
f
611 RYAN PLAZA DRIVE, SulTE 400
l
' k "#...../
ARLINGTON, TEX AS 76011-8064
l
1
j
I
'
!
'
Jnq l0 !99...f
!
Michael B. Sellman, Vice Presiden't
L
Operations Waf.erford
l
Entergy Operations, Inc.
j
P.O. Box B
Killona, Louisiana 70066
1
-1
SUBJECT: NRC INSPECTION REPORT 50-382/96-23
i
Dear Mr. Sellman:
An NRC inspection was conducted October 21-25 and November 4-8,1996, at your
Waterford Steam Electric Station, Unit 3 reactor facility. The enclosed report presents the
l
scope and results of that inspection. The overall results of the inspection were discussed
)
l
with Mr. Tim Gaudet of your staff on January 9,1997.
1
l
l
We determined that your corrective action programs were generally capable of identifying
l
and correcting condition adverse to quality. These programs appropriately identified and
characterized problems in licensee event reports, condition reports, and root cause
l
analyses. The inspection team identified several strengths including the use of a multi-
disciplined condition review board to review the significance of all condition reports and
root cause analyses. However, the inspection team also noted a weakness of your
i
corrective action programs. This weakness involved three examples of conditions adverse
i
'
to quality that had not been effectively precluded from repetition. The examples are
l
discussed in the enclosed inspection report.
]
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
j
and its enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, wa will be pleased to discuss
them with you.
l
Sincerely,
i
[/
w
&
,
'
Th
as P. Gwynn, irector
Division of Reactor Safety
!.
Docket No.: 50-382
License No.: NPF-38
9701150112 970110
ADOCK 05000382
G
l
I
.- .
, , . _ - .
-
_. . .. ._ _
_ .
. _ _ _ _ _ . . _ _ _ . . ~ . - _ _ _ _ - . _ . _ _ _ _ _ . _ . . _ . . _
_
_. - _. . _ _ . _ ,
-
ao
s
Entergy Operations, Inc.
-2-
!a
t-
Enclosure:
j
.
NRC Inspectiob Report
E
'=
i
50 382/96 23
cc w/ enclosure:
Executive Vice President and
-
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
'
P.O. Box B .
Killona, Louisiana 70066
l
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
~ Director Nuclear Safety
.Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
.
__
_
. - _ .
.
. - _
- _ - - - _
.
l
i
-
Entergy Operations, Inc.
-3-
j
i
William H. Spell, Administrator
!
Louisiana Radiation Protection Division
i
I
P.O. Box 82135
l
Baton Rouge, Louisiana 70884-2135
,
'
Parish President
St. Charles Parish
P.O. Box 302
Hahnville, Louisiana 70057
i
Mr. William A. Cross
i
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland 20814
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
a
i
Entergy Operations, Inc.
-4
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bec to DMB (IE01)
bec distrib. by RIV:
L. J. Callan
Resident inspector
,
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
j
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB. MS: TWFN 9E10)
j
,
f
)
DOCUMENT NAME: R:\\_WAT\\WAT623RP.WPA
- Previously concurr
To receive copy of document, Indicate in box: "C" = Copy without enciosures "E" = Copy wth enc ures ",
"
popyh,
/
SRI:EB
lc
SRl:DRP l
RI:EB
C:EB
E/ C:Pp)W$M
/
WPAng:Imb*
DPassehl*
DPereire'_
CVarg@prgh
P Hj d p h ( 3) F/
12/18/96
12/18/96
12/10/96
01/b7% "
f p'l@97 @[
s
D:DRS
p
/
f
,
TPGwynn c4 Q #
{
01/4797
%)l
01/ /97
01/ /97
01/ /97
01/ /97
f
OFFICIAL RECORD COPY
150009
w
-
- -------
-
.
.
Entergy Operations, Inc.
-4-
i
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
l
bec to DMB (IE01)
bec distrib. by RIV:
L. J. Callan
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
DOCUMENT NAME: R:\\_WAT\\WAT623RP.WPA
- Previously concurr
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enct ures ", "
9popy,g
SRI:EB
lc
SRI:DRP
Rl:EB
C:EB
E/ C:P(3fTpg /
WPAng:Imb'_ [
DPassehl *
DPereira *
CVarp@urgh
PHjd(oMK3fP)
12/18/96
12/18/96
12/10/96
01/b790 *
/ JYl/$97 f/
y
D:DRS
$
j-
,
TPGwynn ev6 Q#
01/g097
WJ
01/ /97
01/ /97
01/ /97
01/ /97
OFFICIAL RECORD COPY