- ML20149N097 + (13:21:39, 11 December 2024)
- ML20149N095 + (13:21:40, 11 December 2024)
- ML20149N092 + (13:21:41, 11 December 2024)
- ML20149N093 + (13:21:41, 11 December 2024)
- ML20149N091 + (13:21:42, 11 December 2024)
- ML20149N090 + (13:21:42, 11 December 2024)
- ML20149N089 + (13:21:43, 11 December 2024)
- IR 05000254/1987033 + (13:21:47, 11 December 2024)
- ML20149N086 + (13:21:48, 11 December 2024)
- ML20149N085 + (13:21:49, 11 December 2024)
- ML20149N084 + (13:21:52, 11 December 2024)
- ML20149N083 + (13:21:53, 11 December 2024)
- ML20149N079 + (13:21:54, 11 December 2024)
- ML20149N080 + (13:21:54, 11 December 2024)
- ML20149N078 + (13:21:55, 11 December 2024)
- ML20149N076 + (13:21:55, 11 December 2024)
- ML20149N075 + (13:21:56, 11 December 2024)
- 05000325/LER-1988-005, :on 880124,limiting Condition for Primary Containment Oxygen Concentration Exceeding Tech Spec 3.0.3 Entered.Caused by Incorrectly Configured Control Switch. Control Switch 1-C11-CS-Z8-S1 Replaced + (13:21:58, 11 December 2024)
- ML20149N071 + (13:21:59, 11 December 2024)
- ML20149N070 + (13:22:00, 11 December 2024)
- ML20149N069 + (13:22:01, 11 December 2024)
- ML20149N066 + (13:22:02, 11 December 2024)
- ML20149N064 + (13:22:03, 11 December 2024)
- ML20149N065 + (13:22:03, 11 December 2024)
- 05000461/LER-1988-004, :on 880129,discovered That Manipulation of Incorrect Temp Controller Resulted in Inoperable Div 1 Primary Containment Hydrogen Recombiner W/Div II Diesel Generator Inoperable.Caused by Operator Error + (13:22:05, 11 December 2024)
- ML20149N062 + (13:22:06, 11 December 2024)
- ML20149N061 + (13:22:07, 11 December 2024)
- ML20149N058 + (13:22:07, 11 December 2024)
- ML20149N056 + (13:22:08, 11 December 2024)
- 05000285/LER-1988-002, :on 880125,high Pressure Safety Injection Isolation Valve Declared Inoperable.Caused by Failure to Meet Design Criteria for Operability.Temporary Mechanical Jumper Installed to Bypass Air Intensifier + (13:22:10, 11 December 2024)
- ML20149N054 + (13:22:11, 11 December 2024)
- ML20149N053 + (13:22:12, 11 December 2024)
- ML20149N050 + (13:22:14, 11 December 2024)
- 05000338/LER-1988-008, :on 880202,inadvertent PORV Actuation Occurred During Solid Water Operations.Caused by Pressure Transient Which Occurred When Second Reactor Coolant Pump Started. PCV-1145 Placed in Manual Position & Opened + (13:22:16, 11 December 2024)
- ML20149N048 + (13:22:17, 11 December 2024)
- ML20149N046 + (13:22:18, 11 December 2024)
- ML20149N045 + (13:22:18, 11 December 2024)
- ML20149N044 + (13:22:19, 11 December 2024)
- ML20149N043 + (13:22:20, 11 December 2024)
- 05000338/LER-1987-022, :on 871010,pressurizer PORV Opened Due to Actuation of Overpressure Protection Sys.Caused by Brief Reduction in Primary Sys Temp During Performance of Inservice Insp Test of RHR Sys Valves + (13:22:22, 11 December 2024)
- ML20149N040 + (13:22:23, 11 December 2024)
- ML20149N041 + (13:22:23, 11 December 2024)
- ML20149N039 + (13:22:24, 11 December 2024)
- ML20149N038 + (13:22:24, 11 December 2024)
- ML20149N037 + (13:22:25, 11 December 2024)
- ML20149N035 + (13:22:25, 11 December 2024)
- ML20149N033 + (13:22:26, 11 December 2024)
- 05000320/LER-1988-003, :on 880126,wind Speed Recorder in Control Room Declared Inoperable.Caused by Adverse Weather Conditions. Weather Improved Next Day & Recorder Restored to Operable Status + (13:22:28, 11 December 2024)
- ML20149N031 + (13:22:29, 11 December 2024)
- ML20149N030 + (13:22:30, 11 December 2024)
- ML20149N029 + (13:22:31, 11 December 2024)
- ML20149N028 + (13:22:31, 11 December 2024)