3 NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-254 As a result of the inspection conducted on December 6, 1987 through February 6, 1988, and in accordance with the "General Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the following violation was identified:
Technical Specification 6.2 requires that procedures be adhered to during preventative and corrective maintenance operations.
Contrary to the above, station procedure QIP 5700-2, "Filling Procedure for the Chlorine Analyzer Probe," which cautions that a control room isolation will occur during this procedure and that the control room should be notified, was not followed on February 1, 1988, resulting in an unexpected ESF actuation.
This is a Severity Level V violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Commonwealth Edison is required to submit to this Office within thirty days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:
(1) The reason for the violations if admitted; (2) the corrective steps which have been taken and the results achieved; (3) the corrective steps which will be taken to avoid further violations; and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending your response time.
bi [,
W.%
FEB 5 1983 Date W. L. Forney, Chfef
\\Jh Reactor Projects Branch 1 i
i 8803010163 880225 PDR ADOCK 05000254 0
-