Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154J046 + (05:32:26, 11 December 2024)
- ML20154J043 + (05:32:27, 11 December 2024)
- ML20154J037 + (05:32:28, 11 December 2024)
- ML20154J035 + (05:32:29, 11 December 2024)
- ML20154J036 + (05:32:29, 11 December 2024)
- ML20154J033 + (05:32:30, 11 December 2024)
- IR 05000324/1988019 + (05:33:34, 11 December 2024)
- BECO-86-023, Application for Amend to License DPR-35,consisting of Proposed Change 86-05,deleting Tech Spec 6.15 to Remove 820630 Implementation Date for Final Qualification of safety-related Electrical Equipment.Fee Paid + (05:33:41, 11 December 2024)
- ML20154J027 + (05:33:42, 11 December 2024)
- ML20154J028 + (05:33:42, 11 December 2024)
- ML20154J025 + (05:33:43, 11 December 2024)
- PLA-2605, Forwards Design Description Rept to Assist in Review of 860210 Proposed Tech Spec Changes Re Incorporation of Fifth Diesel Generator Into Design.Rept Includes Design Approach, Physical Description & Mechanical Equipment Design + (05:33:43, 11 December 2024)
- A05442, Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530 + (05:33:50, 11 December 2024)
- ML20154J020 + (05:33:50, 11 December 2024)
- ML20154J019 + (05:33:51, 11 December 2024)
- ML20154J017 + (05:33:52, 11 December 2024)
- ML20154J018 + (05:33:52, 11 December 2024)
- ML20154J014 + (05:33:53, 11 December 2024)
- ML20154J015 + (05:33:53, 11 December 2024)
- U-601163, Proposed Tech Spec Tables 2.2.1-1, Reactor Protection Sys Instrumentation Setpoints & 3.3.2-2, Containment & Reactor Vessel Isolation Control Sys + (05:33:54, 11 December 2024)
- ML20154J010 + (05:33:55, 11 December 2024)
- ML20154J012 + (05:33:55, 11 December 2024)
- HBL-88-077, Requests Exemption from Provisions of 10CFR70.51(d) Re Annual Physical Inventory of Spent Fuel.Conducting Physical Inventory Not Necessary to Achieve Underlying Purpose of Rule.Performance of Annual Inventory Satisfies Requirement + (05:33:56, 11 December 2024)
- ML20154J005 + (05:34:00, 11 December 2024)
- ML20154J006 + (05:34:00, 11 December 2024)
- ML20154J001 + (05:34:01, 11 December 2024)
- A07194, Responds to NRC Re Violations Noted in Insp Rept 50-423/88-05.Corrective Actions:Valve 3FWA*V2 Locked Open, Listed Valve Lineup Performed on Trains a & B & Description of Event & Caution to Verify Valves Distributed to Shifts + (05:34:08, 11 December 2024)
- RBG-23245, Forwards Rept Containing Brief Description of Changes to Initial Test Program & Summary of Safety Evaluation for Each Change + (05:34:08, 11 December 2024)
- ML20154H994 + (05:34:14, 11 December 2024)
- ML20154H993 + (05:34:15, 11 December 2024)
- ML20154H989 + (05:34:22, 11 December 2024)
- ML20154H987 + (05:34:22, 11 December 2024)
- B12907, Forwards Updated Schedule for Correction of Human Engineering Discrepancies (Heds).First Phase Enchancements & Corrections of Program to Correct Heds Completed.All Revs to Operations Procedures Will Be Completed by End of 1988 + (05:34:23, 11 December 2024)
- ML20154H986 + (05:34:23, 11 December 2024)
- ML20154H984 + (05:34:24, 11 December 2024)
- IR 05000424/1988030 + (05:34:25, 11 December 2024)
- ML20154H980 + (05:34:26, 11 December 2024)
- ML20154H977 + (05:34:27, 11 December 2024)
- ML20154H979 + (05:34:27, 11 December 2024)
- ML20154H976 + (05:34:28, 11 December 2024)
- ML20154H973 + (05:34:28, 11 December 2024)
- ML20154H971 + (05:34:29, 11 December 2024)
- ML20154H970 + (05:34:30, 11 December 2024)
- ML20154H969 + (05:34:30, 11 December 2024)
- IR 05000425/1988032 + (05:34:31, 11 December 2024)
- ML20154H966 + (05:34:31, 11 December 2024)
- ML20154H965 + (05:34:32, 11 December 2024)
- ML20154H963 + (05:34:33, 11 December 2024)
- BVY-98-150, Provides Status of Initiatives in Area & Provides Update on Current Schedules,Per 10CFR50.54(f).Util Will Continue to Update NRC on Status of Efforts as Necessary + (05:34:34, 11 December 2024)
- ML20154H962 + (05:34:34, 11 December 2024)
- ML20154H959 + (05:34:35, 11 December 2024)
- ML20154H956 + (05:34:36, 11 December 2024)