Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154Q329 + (04:23:22, 11 December 2024)
- 05000281/LER-1986-003-03, :on 860216,turbine Tripped Due to High Level in Steam Generator B.Caused When Main Feedwater Bypass Valve B Failed to Close on Demand.Valve Failure Caused by Blockage in Air Pilot Relay.Blockage Dislodged + (04:23:24, 11 December 2024)
- ML20154Q327 + (04:23:25, 11 December 2024)
- ML20154Q325 + (04:23:26, 11 December 2024)
- ML20154Q321 + (04:23:26, 11 December 2024)
- ML20154Q318 + (04:23:27, 11 December 2024)
- ML20154Q320 + (04:23:27, 11 December 2024)
- ML20154Q317 + (04:23:28, 11 December 2024)
- ML20154Q316 + (04:23:28, 11 December 2024)
- ML20154Q314 + (04:23:29, 11 December 2024)
- AECM-86-0059, Forwards Final Response to Generic Ltr 83-28,Items 3.1 & 3.2,in Response to 851203 Request for Addl Info + (04:23:30, 11 December 2024)
- ML20154Q312 + (04:23:30, 11 December 2024)
- IR 05000124/1988001 + (04:23:31, 11 December 2024)
- ML20154Q304 + (04:23:32, 11 December 2024)
- ML20154Q309 + (04:23:32, 11 December 2024)
- ML20154Q302 + (04:23:33, 11 December 2024)
- ML20154Q303 + (04:23:33, 11 December 2024)
- 05000245/LER-1993-011, Responds to NRC 981002 Request to Counsel That NNECO Waive Any Assertion of Statue of Limitations for 60-90 Days with Respect to NRC Ability to Initiate Civil Penalty Action Based on Apparent Violation of 10CFR50.59 Re LER 93-0 + (04:23:34, 11 December 2024)
- B13028, Part 21 Rept Re Corrosion Found on Soldered Wire Connection Electrical Connectors of Redundant safety-related Valves Mfg by Valcor Engineering Corp.Initially Reported on 880923. Corrosion on Valves Removed.Next Rept Expected by 890110 + (04:23:35, 11 December 2024)
- U-600493, Forwards Proprietary Bisco Repts 748-15, Conduit Seal Fire Barrier Testing & 748-66, Fire Testing Utilizing Bisco SF-20 in Both 6 0 Steel Conduit & 6 0 PVC Duct Configurations. Repts Withheld + (04:23:35, 11 December 2024)
- ML20154Q296 + (04:23:36, 11 December 2024)
- ML20154Q294 + (04:23:37, 11 December 2024)
- ML20154Q295 + (04:23:37, 11 December 2024)
- ML20154Q292 + (04:23:38, 11 December 2024)
- ML20154Q291 + (04:23:38, 11 December 2024)
- ML20154Q290 + (04:23:39, 11 December 2024)
- ML20154Q284 + (04:23:40, 11 December 2024)
- ML20154Q286 + (04:23:40, 11 December 2024)
- ML20154Q283 + (04:23:42, 11 December 2024)
- ML20154Q277 + (04:23:43, 11 December 2024)
- ML20154Q281 + (04:23:43, 11 December 2024)
- ML20154Q275 + (04:23:44, 11 December 2024)
- 05000219/LER-1998-012-01, :on 980916,unplanned Actuation of Esfs Occurred.Caused by Written Communication.Procedure Revised to Include Signature Verifications to Install & Subsequently Remove Ohmmeter + (04:23:46, 11 December 2024)
- ML20154Q270 + (04:23:47, 11 December 2024)
- ML20154Q264 + (04:23:48, 11 December 2024)
- ML20154Q266 + (04:23:48, 11 December 2024)
- ML20154Q262 + (04:23:49, 11 December 2024)
- ML20154Q261 + (04:23:50, 11 December 2024)
- 05000352/LER-1986-012, :on 860213,during Review of Rev to Surveillance Test,Four Radiation Monitors on RHR Svc Water Sys Determined Not in Compliance W/Tech Spec.Caused by Administrative Oversight.Proper Circuitry Installed + (04:23:52, 11 December 2024)
- ML20154Q257 + (04:23:53, 11 December 2024)
- ML20154Q255 + (04:23:54, 11 December 2024)
- ML20154Q254 + (04:23:54, 11 December 2024)
- SNRC-1232, Responds to SER Issue 57 & NUREG-0737 Item II.B.3, Post-Accident Sampling. Pressure & Temp of Total Dissolved Gases Can Be Measured by Instrumentation in Gas Extraction Loop + (04:23:55, 11 December 2024)
- ML20154Q252 + (04:23:56, 11 December 2024)
- ML20154Q249 + (04:23:57, 11 December 2024)
- ML20154Q248 + (04:23:58, 11 December 2024)
- ML20154Q246 + (04:23:59, 11 December 2024)
- ML20154Q244 + (04:24:00, 11 December 2024)
- ML20154Q245 + (04:24:00, 11 December 2024)
- ML20154Q242 + (04:24:01, 11 December 2024)
- U-601194, Forwards Response to Ja Stevens 880505 Questions on Inservice Testing (IST) Program,Summary of Changes to IST, Relief Requests & Rev 5 to Pump & Valve Testing Program Plan + (04:24:03, 11 December 2024)