Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196J292 + (21:01:12, 10 December 2024)
- ML20196J290 + (21:01:13, 10 December 2024)
- ML20196J288 + (21:01:14, 10 December 2024)
- ML20196J289 + (21:01:14, 10 December 2024)
- ML20196J285 + (21:01:18, 10 December 2024)
- ML20196J281 + (21:01:19, 10 December 2024)
- ML20196J283 + (21:01:19, 10 December 2024)
- ML20196J278 + (21:01:22, 10 December 2024)
- ML20196J277 + (21:01:24, 10 December 2024)
- ML20196J276 + (21:01:24, 10 December 2024)
- NG-97-1335, Responds to Violations Noted in Insp Rept 50-331/97-09. Corrective Actions:Revised Maint Instruction Form Associated W/Corrective Maint Action Request,Counseled Personnel Involved & Initiated Review of Previous Tagout Errors + (21:01:25, 10 December 2024)
- ML20196J272 + (21:01:26, 10 December 2024)
- ML20196J271 + (21:01:26, 10 December 2024)
- ML20196J270 + (21:01:27, 10 December 2024)
- IR 05000313/1988006 + (21:01:28, 10 December 2024)
- 05000328/LER-1988-006-01, :on 880207,main Steam Isolation Occurred & Reactor Trip Signal Generated by ESF Actuation Sys.Caused by Improper Compliance W/Procedures & Nuance Between Operating Procedures.Procedure Changed & Recategorized + (21:01:35, 10 December 2024)
- ML20196J263 + (21:01:36, 10 December 2024)
- ML20196J262 + (21:01:37, 10 December 2024)
- ML20196J261 + (21:01:38, 10 December 2024)
- ML20196J259 + (21:01:39, 10 December 2024)
- ML20196J258 + (21:01:40, 10 December 2024)
- ML20196J255 + (21:01:43, 10 December 2024)
- NSD-NRC-97-5248, Responds to Discussion Conducted During 970709 Senior Mgt Meeting W/W Re AP600 Design Certification,Loss of Off Site Power & No Pressurizer Relief Valve Lift.Ssar Chapter 15 Safety Analysis Based on Conservative Assumptions + (21:01:44, 10 December 2024)
- ML20196J247 + (21:01:45, 10 December 2024)
- ML20196J252 + (21:01:45, 10 December 2024)
- ML20196J244 + (21:01:46, 10 December 2024)
- ML20196J242 + (21:01:47, 10 December 2024)
- ML20196J243 + (21:01:47, 10 December 2024)
- 05000254/LER-1987-019-02, :on 870914,as Found Leakage Exceeded Tech Spec 3.7.A.2.b Limit.Cause Not Determined.Valves & Penetrations Tested as Required by Local Leak Rate Test Program.Several Valves & Penetration Repaired or Replaced + (21:01:49, 10 December 2024)
- ML20196J239 + (21:01:50, 10 December 2024)
- ML20196J238 + (21:01:51, 10 December 2024)
- ML20196J237 + (21:01:51, 10 December 2024)
- ML20196J235 + (21:01:52, 10 December 2024)
- ML20196J233 + (21:01:53, 10 December 2024)
- 3F0688-19, Ro:On 880527,emergency Feedwater Piping Near Flow Control Valve Found to Be Warmer than Normal.Cause Not Stated.Water Added to Reseat & to Cool Emergency Feedwater Line & Valve Closed to Prevent Inadvertent Manual Addition of Water + (21:01:54, 10 December 2024)
- ML20196J232 + (21:01:54, 10 December 2024)
- ML20196J229 + (21:01:55, 10 December 2024)
- AECM-88-0130, Discusses Restructuring of Util Organization to Strengthen Mgt Capabilities & Reduce Operating Costs + (21:01:56, 10 December 2024)
- ML20196J227 + (21:01:56, 10 December 2024)
- ML20196J226 + (21:01:57, 10 December 2024)
- ML20196J225 + (21:01:58, 10 December 2024)
- ML20196J223 + (21:01:58, 10 December 2024)
- ML20196J220 + (21:01:59, 10 December 2024)
- ML20196J219 + (21:02:00, 10 December 2024)
- ML20196J218 + (21:02:01, 10 December 2024)
- ML20196J217 + (21:02:01, 10 December 2024)
- ML20196J216 + (21:02:02, 10 December 2024)
- ML20196J210 + (21:02:03, 10 December 2024)
- ML20196J211 + (21:02:03, 10 December 2024)
- ML20196J203 + (21:02:04, 10 December 2024)
- ML20196J201 + (21:02:05, 10 December 2024)