Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196J332 + (21:00:39, 10 December 2024)
- ML20196J329 + (21:00:41, 10 December 2024)
- ML20196J330 + (21:00:41, 10 December 2024)
- ML20196J327 + (21:00:42, 10 December 2024)
- ML20196J328 + (21:00:42, 10 December 2024)
- ML20196J326 + (21:00:43, 10 December 2024)
- IR 05000373/1988012 + (21:00:44, 10 December 2024)
- ST-HL-AE-2701, Responds to NRC Re Violations Noted in Insp Rept 50-499/88-24.Corrective Action:Unit 2 Areas Listed in Attachment 1 Inspected by QC to Verify Edge Guards Still in Place Per SSP-27 + (21:00:45, 10 December 2024)
- ML20196J322 + (21:00:45, 10 December 2024)
- ML20196J320 + (21:00:46, 10 December 2024)
- ML20196J319 + (21:00:48, 10 December 2024)
- ML20196J317 + (21:00:49, 10 December 2024)
- ML20196J314 + (21:00:50, 10 December 2024)
- ML20196J313 + (21:00:51, 10 December 2024)
- ML20196J310 + (21:00:52, 10 December 2024)
- ML20196J308 + (21:00:54, 10 December 2024)
- ML20196J307 + (21:00:54, 10 December 2024)
- IR 05000334/1998006 + (21:00:55, 10 December 2024)
- ML20196J303 + (21:00:56, 10 December 2024)
- ML20196J304 + (21:00:56, 10 December 2024)
- ML20196J300 + (21:00:57, 10 December 2024)
- ML20196J301 + (21:00:57, 10 December 2024)
- ML20196J299 + (21:00:58, 10 December 2024)
- 05000414/LER-1997-005-02, :on 970626,automatic Reactor Trip Occurred While in Mode 1.Caused by Equipment Failure of Cutler-Hammer E30JY5 Close/Trip Push Button Switch.Maint & Engineering Found & Replaced Defective Switch + (21:01:10, 10 December 2024)
- ML20196J294 + (21:01:11, 10 December 2024)
- ML20196J292 + (21:01:12, 10 December 2024)
- ML20196J290 + (21:01:13, 10 December 2024)
- ML20196J288 + (21:01:14, 10 December 2024)
- ML20196J289 + (21:01:14, 10 December 2024)
- ML20196J285 + (21:01:18, 10 December 2024)
- ML20196J281 + (21:01:19, 10 December 2024)
- ML20196J283 + (21:01:19, 10 December 2024)
- ML20196J278 + (21:01:22, 10 December 2024)
- ML20196J277 + (21:01:24, 10 December 2024)
- ML20196J276 + (21:01:24, 10 December 2024)
- NG-97-1335, Responds to Violations Noted in Insp Rept 50-331/97-09. Corrective Actions:Revised Maint Instruction Form Associated W/Corrective Maint Action Request,Counseled Personnel Involved & Initiated Review of Previous Tagout Errors + (21:01:25, 10 December 2024)
- ML20196J272 + (21:01:26, 10 December 2024)
- ML20196J271 + (21:01:26, 10 December 2024)
- ML20196J270 + (21:01:27, 10 December 2024)
- IR 05000313/1988006 + (21:01:28, 10 December 2024)
- 05000328/LER-1988-006-01, :on 880207,main Steam Isolation Occurred & Reactor Trip Signal Generated by ESF Actuation Sys.Caused by Improper Compliance W/Procedures & Nuance Between Operating Procedures.Procedure Changed & Recategorized + (21:01:35, 10 December 2024)
- ML20196J263 + (21:01:36, 10 December 2024)
- ML20196J262 + (21:01:37, 10 December 2024)
- ML20196J261 + (21:01:38, 10 December 2024)
- ML20196J259 + (21:01:39, 10 December 2024)
- ML20196J258 + (21:01:40, 10 December 2024)
- ML20196J255 + (21:01:43, 10 December 2024)
- NSD-NRC-97-5248, Responds to Discussion Conducted During 970709 Senior Mgt Meeting W/W Re AP600 Design Certification,Loss of Off Site Power & No Pressurizer Relief Valve Lift.Ssar Chapter 15 Safety Analysis Based on Conservative Assumptions + (21:01:44, 10 December 2024)
- ML20196J247 + (21:01:45, 10 December 2024)
- ML20196J252 + (21:01:45, 10 December 2024)
- ML20196J244 + (21:01:46, 10 December 2024)