Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198K247 + (15:25:23, 10 December 2024)
- ML20198K245 + (15:25:23, 10 December 2024)
- PNO-III-90-012, on 900222,radioactive Waste Excavation Project Underway at Quarry in Kokomo,In.Caused by Excavating Previously Buried Waste Matl.Any Barrels Which Appear to Be Degraded to Be Placed in Large Containers & Quarry Fenced + (15:25:24, 10 December 2024)
- PNO-IV-90-016, on 900407,flash Fire Occurred in Storate Tank Which Was Being Primed.Workers Reportedly Did Not Utilize Proper Air Exchange Equipment Specified in Safe Work Permit + (15:25:24, 10 December 2024)
- PNO-IV-90-014A, on 900406,Region IV Inspector Was Present at Memorial Hospital When Overexposed Radiographer Assistant Examined.Nrc Inspector Will Schedule Complete Full Insp of Licensee on 900410 + (15:25:25, 10 December 2024)
- PNO-III-90-006, on 900131,station Wagon Containing Model 5001 Humbolt moisture-density Gauge Stolen from auto-repair Shop in Strongsville,Oh.Licensee Notified Local Police Dept & Planning on Notifying Local News Media + (15:25:25, 10 December 2024)
- PNO-III-90-070, on 901017,female Patient Being Treated for Thyroid Cancer Was Given 320 Millicuries of I-131 Instead of Prescribed Dosage of 175 Millicuries.State of Mi Notified + (15:25:26, 10 December 2024)
- ML20198K231 + (15:25:27, 10 December 2024)
- ML20198K228 + (15:25:28, 10 December 2024)
- 05000278/LER-1986-012-02, :on 860426,full Scram Occurred While Testing 500-kV Line Fault Detection Circuit.Caused by Personnel Error.Personnel Instructed to Exercise More Caution in Performance of Tests + (15:25:30, 10 December 2024)
- RBG-44795, Forwards Results of GE Reanalysis Rept & Validation of Cycle 8.Mid-cycle Rev 1 to RBS COLR for Cycle 8,which Was Revised According to Results of Reanalysis Is Encl + (15:25:31, 10 December 2024)
- PNO-II-90-081, on 901224,stuck Source in Well Logging Operation in Virginia.Caused by Two 250 Mci Am-241 Sources Contained in Single Well Logging Tool.Licensee Attempted to Force Air Into Well as Means as Dislodging Tool + (15:25:31, 10 December 2024)
- ML20198K223 + (15:25:35, 10 December 2024)
- ML20198K222 + (15:25:36, 10 December 2024)
- ML20198K217 + (15:25:43, 10 December 2024)
- ML20198K218 + (15:25:43, 10 December 2024)
- ML20198K216 + (15:25:44, 10 December 2024)
- PNO-III-90-084, on 901218,Troxler moisture-density Gauge Containing 40 Mci of Am-241 & 8 Mci of Cs-137 Was Stolen from Truck Parked at Library Construction Site in Chicago. Illinois Dept of Nuclear Safety Will Be Investigating Event + (15:25:45, 10 December 2024)
- ML20198K215 + (15:25:45, 10 December 2024)
- ML20198K212 + (15:25:46, 10 December 2024)
- ML20198K209 + (15:25:46, 10 December 2024)
- ML20198K206 + (15:25:47, 10 December 2024)
- ML20198K208 + (15:25:47, 10 December 2024)
- PNO-III-90-033, on 900524,licensee Declared Emergency Plan After 765KV Switchyard Breaker Opened Unexpectedly & Control Room Received Rept of Fire & Explosion.Caused by Burning Oil from Crosstie Breaker L.Unit 1 Reduced Power to 62% + (15:25:48, 10 December 2024)
- ML20198K204 + (15:25:48, 10 December 2024)
- ML20198K203 + (15:25:49, 10 December 2024)
- ML20198K202 + (15:25:50, 10 December 2024)
- PNO-IV-90-028, on 900603,while Attempting to Energize Station Normal Auxiliary Power Transformers,Short Circuit Failure in Bus Works for 25 Kv Sys.Fire Brigade Responded But No Fire Was Reported.Event Under Investigation + (15:25:50, 10 December 2024)
- ML20198K197 + (15:25:53, 10 December 2024)
- PNO-II-90-037, on 900719,licensee Notified NRC Region II That While Conducting Quarterly Sealed Source Inventory on 900718,licensee Was Unable to Locate 31 Uci Cs-137 Reference Source + (15:25:53, 10 December 2024)
- ML20198K196 + (15:25:54, 10 December 2024)
- ML20198K194 + (15:25:58, 10 December 2024)
- ML20198K193 + (15:25:58, 10 December 2024)
- ML20198K192 + (15:25:59, 10 December 2024)
- PNO-III-90-028, on 900410,dye Penetrant Testing on Inside of Reactor Vessel Head Identified 23 Cracks of Various Dimensions.Licensee Begun Repairing Cracks by Grinding Cracked Areas + (15:25:59, 10 December 2024)
- ML20198K188 + (15:26:00, 10 December 2024)
- ML20198K189 + (15:26:00, 10 December 2024)
- ML20198K186 + (15:26:05, 10 December 2024)
- ML20198K183 + (15:26:06, 10 December 2024)
- ML20198K181 + (15:26:07, 10 December 2024)
- ML20198K182 + (15:26:07, 10 December 2024)
- ML20198K178 + (15:26:10, 10 December 2024)
- ML20198K176 + (15:26:10, 10 December 2024)
- ML20198K175 + (15:26:11, 10 December 2024)
- ML20198K174 + (15:26:12, 10 December 2024)
- ML20198K173 + (15:26:12, 10 December 2024)
- ML20198K170 + (15:26:14, 10 December 2024)
- ML20198K169 + (15:26:15, 10 December 2024)
- ML20198K168 + (15:26:15, 10 December 2024)
- ML20198K165 + (15:26:16, 10 December 2024)
- ML20198K162 + (15:26:16, 10 December 2024)
- ML20198K161 + (15:26:17, 10 December 2024)