Forwards Insp Repts 50-424/86-20 & 50-425/86-11 on 860317-21 & Notice of Violation
ML20198K161
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/19/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20198K164 List:
References
NUDOCS 8606030352
Download: ML20198K161 (3)


See also: IR 05000424/1986020

Text

4

ve\\W'

"

'

.

A4AYl9ISE

Georgia Power Company

ATTN: piir. R. J . Kel l y '

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

REPORT NOS. 50-424/86-20 AND 50-425/86-11

On March 17 - 21, 1986, NRC inspected activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

I

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments.

The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Luis A. Reyes

Luis A. Reyes, Acting Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection Report Nos. 50-424/86-20

and 50-425/86-11

c w/encls:

R. E. Conway, Senior Vice Prasident &

<

Project Director

vb. O. Foster, Vice President, Project

,j Support

4 9. D. Rice, Vice President, Project

Engineering

cc w/encls:

(Continued see page 2)

l

Bj

jDOCK0S000424

{1

0352 860519

D

o

~Q j

PDR

.

M

'

.

-

.

Georgia Power Company

2

my 191986

cc w/encis:

(Continued)

/R. H. Pinson, Vice President, Project

Construction

MJ.T.Beckham,VicePresident&

General Manager - Operations

/R.A. Thomas,VicePresident,

Licensing

/C.W. Hayes,VogtleQuality

Assurance Manager

YW.C.Ramsey, Manager-

Readiness Review

\\/G. B. Bockhold, General Manager,

Nuclear Operations

/L.Gucwa, Manager,NuclearSafety

and Licensing

/M.H.Googe, Project

Construction Manager

/E,D. Groover, Quality

Assurance Site Manager -

Construction

kJ. A. Bailey, Project Licensing

Manager

/G. F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

/B.W. Churchill,Esq.,Shaw,

Pittman, Potts and Trowbridge

\\/E. L. Blake, Jr. , Esq. , Shaw,

d.Pittman,PottsandTrowbridge

E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

/J. G. Ledbetter, Commissioner,

Department of Human Resources

/C. H. Badger, Office of Planning

and Budget

V6. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

gD.C.Teper,GeorgiansAgainst

Nuclear Energy

- tfM. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

[Dr.O.H. Paris,Ac'ministrativeJudge

Atomic Safety and Licensing Board

j Panel

VG. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

. Panel

/B. P. Garde, Citizens Clinic, Director

Government Accountability Project

bec w/encls:

(See page 3)

.


a

.

.

,

'

.

E-

Georgia Power Company

3

'

bec w/encis: #

/ E. Reis ELD

/W. M. Hill, IE

y M. Miller, NRR d

y W. Brach, ED0 v

y M. Sinkule, RII / '

V E. Christnot, RII

gNRC Resident Inspector /

.

./ Document Control Desk

State of Georgia

q

4[

R

R

RII

RI'

S

a :1b

3

ke

AR

dt

Aftlibson

VBrownlee

~

/h4

/86

/f. /86

04/g/86

4/3 f/86

04/f/86

1

.