Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20265D844 + (June 9, 1995)
- ML20248C292 + (June 9, 1995)
- 05000313/LER-1995-007, :on 950331,failed to Complete Required TS Surveillance Logs as Result of Inadequate Communication During Turnover of Logtaking Responsibilities.Disciplinary Action Administered to Individuals Involved + (June 9, 1995)
- 05000325/LER-1995-011, :on 950519,manual Reactor Protection Sys Trip Initiated Due to Decreasing Condenser Vacuum.Unit 1 & 2 CW Intake Pumps Traveling Screens Cleaned & Monitored + (June 9, 1995)
- 05000440/LER-1995-004, :on 950510,determined That Potential Existed for Secondary Containment Bypass Leakage Through Upper Containment Airlock to Exceed Leakage Limit.Caused by Design Inadequacies.Mod Made on hard-piped Unions + (June 9, 1995)
- ML20085M380 + (June 9, 1995)
- ML20085L502 + (June 9, 1995)
- ML20085M396 + (June 9, 1995)
- ML18101A773 + (June 9, 1995)
- ML18101A779 + (June 9, 1995)
- ML18101A774 + (June 9, 1995)
- ML17352B204 + (June 9, 1995)
- ML17352B207 + (June 9, 1995)
- GO2-95-112, Forwards Revised Met Tower Stability Class Data Point Info File Indicating Point as Differential Temp in Degrees F + (June 9, 1995)
- IR 05000244/1995006 + (June 9, 1995)
- ML14183A671 + (June 9, 1995)
- ML14181A296 + (June 9, 1995)
- IR 05000206/1995005 + (June 9, 1995)
- ML17228B159 + (June 9, 1995)
- ML17352B210 + (June 9, 1995)
- ML17263B093 + (June 9, 1995)
- ML17059A843 + (June 9, 1995)
- ML17311A961 + (June 9, 1995)
- ML18153A842 + (June 9, 1995)
- TAC:M91704 + (June 9, 1995)
- 05000483/LER-1995-003, :on 910520,TS 4.3.2.1-7.b Surveillance of Refueling Water Storage Tank Protection Loop Was Missed Due to Cognitive Personnel Error.Comprehensive Review of Other Surveillance Packages for Other Channels Was Made + (June 9, 1995)
- ML20266H030 + (June 10, 1995)
- ML20266G795 + (June 10, 1995)
- ML20266G815 + (June 10, 1995)
- ML18011A941 + (June 11, 1995)
- 05000325/LER-1995-009, :on 950512,surveillance Tracking Sys Was Not Updated to Reflect Moving Requirement to New Procedure. Caused by Inadequate training.PT-08.1.3d Was Successfully Performed on Both Units + (June 11, 1995)
- ML17332A798 + (June 12, 1995)
- ML18101A781 + (June 12, 1995)
- ML18101A780 + (June 12, 1995)
- ML20086D394 + (June 12, 1995)
- ML20085H690 + (June 12, 1995)
- ML20085H492 + (June 12, 1995)
- NG-95-1893, Reactor Scram Due to FW Pump Trip Caused by Lube Oil Pump Coupling Failure.Maint Procedure, Vendor Manual & Plant Drawings for FW Pumps Being Revised to Ensure Proper Lubrication of Subj Coupling + (June 12, 1995)
- HL-4864, Trip of Reactor Protection Sys Bus Power Supply Results in Actuations of ESFs + (June 12, 1995)
- ML20085G059 + (June 12, 1995)
- 05000361/LER-1995-009, :on 950511,EDG Initial Step Load Should Have Been 20% Higher than 1,720 Kw.Caused by Bechtel Who Did Not Recognize That Lovs May Cause Larger EDG Initial Step Load than Lovs W/Sias.Revised Appropriate Load Circuitry + (June 12, 1995)
- ML20085F200 + (June 12, 1995)
- ML20085F056 + (June 12, 1995)
- ML20085E518 + (June 12, 1995)
- ML20091L289 + (June 12, 1995)
- ML20113D634 + (June 12, 1995)
- ML20136B039 + (June 12, 1995)
- ML20136A631 + (October 27, 1994)
- ML20141J242 + (June 12, 1995)
- ML20128Q176 + (June 12, 1995)
- ML20128Q171 + (June 12, 1995)
- ML20236K807 + (June 12, 1995)
- NRC-95-4486, Forwards W Proprietary Rept MT01-GSR-011, AP600 Notrump Core Makeup Tank Preliminary Validation Rept for 500-Series Natural Circulation Tests + (June 12, 1995)