ML17352B204

From kanterella
Jump to navigation Jump to search
Amends 174 & 168 to Licenses DPR-31 & DPR-41,respectively, Changing TS Re Implementation of Util Nuclear Physics Methodology for Calculations of COLR Parameters
ML17352B204
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/09/1995
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17352B205 List:
References
NUDOCS 9506230219
Download: ML17352B204 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO.

3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 174 License No.

DPR-31 The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

C.

D.

E.

The application for amendment by Florida Power and Light Company.

(the licensee) dated January 17,

1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with,10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

950M302i9 950609 PDR ADOCK 05000250 P

PDR,

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No.

DPR-31 is hereby amended to read as follows:

(B)

Technical S ecifications and Environmental Protectio Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 174, are hereby incorporated in the license.

The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 9, 1995

'qI >>50u O

Cy A.o O

/p pN

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT PLANT UNIT NO.

4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

168 License No.

DPR-41 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Florida Power and Light Company (the licensee) dated January 17,

1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements

'have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B -of Facility Operating License No.

DPR-41 is hereby amended to read as follows:

(B)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 168, are hereby incorporated in the license.

The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION c- "

~

0.C

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 9,

1995 David B. Matthews, Director Project Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.

174 FACILITY OPERATING LICENSE NO.

DPR-31 M

D N

NO.

FACILIT OPERATING LICENSE NO.

DPR-41 DOCKET NOS.

50-250 AND 50-251 Revise Appendix A as follows:

lt 6-20 6-20a Insert a

e 6-20 6-20a

IJ h

. ADMINISTRATIVECONTRO PEAKING FACTOR LIMIT REPORT (Continued)

Factor Limit Report, the Peaking Factor Limit Report shall be provided to the NRC Document Control desk with copies to the Regional Administrator and the Resident Inspector within 30 days of their implementation, unless otherwise approved by the Commission.

The analytical methods used to generate the Peaking Factor limits shall be those previously reviewed and approved by the NRC. If changes to these methods are deemed necessary they will be evaluated in accordance with 10 CFR 50.59 and submitted to the NRC for review and approval priot to their use if the change is determined to involve an unreviewed safety question or if such a change would require amendment of previously submitted documentation.

CORE OPERATING LINITS REPORT 6.9. 1.7 Core operating limits shall be established and documented in the CORE OPERATING LIMITS REPORT (COLR) before each reload cycle or any remaining part of a reload cycle for the following:

1.

Axial Flux Difference for Specifications 3.2. 1.

2.

Control Rod Insertion Limits for Specification 3. 1.3.6.

3.

Heat Flux Hot Channel Factor - F~(Z) for Specification 3/4.2.2.

The analytical methods used to determine the AFD limits shall be those previously reviewed and approved by the NRC in:

1 o MCAP 10216 P

A~

RELAXATION OF CONSTANT AXIAL OFFSET CONTROL F~

SURVEILLANCE TECHNICAL SPECIFICATION," June 1983.

2.

MCAP-8385, "POWER DISTRIBUTION CONTROL AND LOAD FOLLOWING PROCEDURES

- TOPICAL REPORT," September 1974.

The analytical methods used to determine the K(Z) curve shall be those previously reviewed and approved by the NRC in:

1.

MCAP-9220-P-A, Rev.

1, "Westinghouse ECCS Evaluation Model - 1981 Version," February 1982.

2.

WCAP-9561-P-A, ADD. 3, Rev.

1, "BART A-1: A Computer Code for the Best Estimate Analysis of Reflood Transients Special Report:

Thimble Nodeling W ECCS Evaluation Nodel."

The analytical methods used to determine the Rod Bank Insertion Limits shall be those previously reviewed and approved by the NRC in:

1.

MCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Nethodology,"

July 1985.

The ability to calculate the COLR nuclear design parameters are demonstrated in:

1.

Florida Power K Light Company Topical Report NF-TR-95-01, "Nuclear Physics Methodology for Reload Design of Turkey Point 5 St. Lucie Nuclear Plants".

TURKEY POINT - UNITS 3 K 4 6-20 AMENDMENT NOS-174 AND 168

DHINISTRATIVE CONTR

'ORE OPERATING LIMITS REPOR (Continued Topical Report NF-TR-95-01 was approved by the NRC for use by Florida Power L Light Company in:

Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Amendment No.

174 to Facility Operating License DPR-31 and Amendment No. 168 to Facility Operating License No. DPR-41, Florida Power I Light Company Turkey Point Units Nos.

3 and 4, Docket Nos.

50-250 and 50-251.

The AFD, K(Z), and Rod Bank Insertion Limits shall be determined such that all applicable limits of the safety analyses are met.

The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements

thereto, shall be provided upon issuance, for each reload cycle, to the NRC Document Control Desk with copies to the Regional Administrator and the Resident Inspector, unless otherwise approved by the Commission.

SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Regional Administrator of the Regional Office of the NRC within the time period specified for each report as stated in the Specifications within Sections 3.0, 4.0, or 5.0.

6 10 ECO D

E IO

6. 10. 1 In addition to the applicable record retention requirements of Title 10, Code of Federal Regulations, the following records shall be retained for at least the minimum period indicated.
6. 10.2 The following records shall be retained for at least 5 years:

a.

Records and logs of unit operation covering time interval at each power level; b.

Records and logs of principal maintenance. activities, inspections,

repair, and replacement of principal items of equipment related to nuclear safety; c.

All REPORTABLE EVENTS; d.

Records of surveillance activities, inspections, and calibrations required by these Technical Specifications; e.

Records of changes made to the procedures required by Specification 6.8. 1; f.

Records of radioactive shipments; g.

Records of sealed source and fission detector leak tests and results; and h.

Records of annual physical inventory of all sealed source material of record.

6.10.3 The following records Operating License:

TURKEY POINT UNITS 3 L 4 6-20a AMENDMENT NOS-174 AND 168 shall be retained for the duration of the unit