Forwards SE Authorizing Licensee Request for Relief.Relief Request Nine Involves Alternative Scheduling of Exams & Ten Involves Removal of Insulation from Bolted Connections on Borated Sys for Insp
ML17352B207
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/09/1995
From: Matthews D
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17352B209 List:
References
TAC-M87725, TAC-M87726, NUDOCS 9506230259
Download: ML17352B207 (4)


Text

'RR REGS

~C 0p0 A.

O I

P cA Cy Y/4~

~O

~a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June:9, 1995 Hr. J.

H. Goldberg President Nuclear Division Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT UNITS 3 AND 4 EVALUATION OF THE THIRD 10-YEAR INTERVAL REQUEST FOR RELIEF NUHBERS 9 AND 10 (TAC NOS.

H87725 AND H87726)

Dear Hr. Goldberg:

The NRC staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL), has reviewed and evaluated the Turkey Point, Unit Nos.

3 and 4, Third Ten-Year Interval Inservice Inspection (ISI) request for relief numbers 9 and 10.

These relief requests were submitted by, letter dated September 9,

1993, and revised by letters dated Harch 27, 1995 and April 6, 1995.

Relief request number 9 involves alternative scheduling of examinations and relief number 10 involves removal of insulation from bolted connections on borated systems for inspection.

Me have determined that your proposed actions are acceptable.

Relief is hereby authorized for relief request number 9 provided all of the Code selection and scheduling requirements associated with the substitute weld selections are met.

The alternatives contained in the relief request are authorized pursuant to 10 CFR 50.55a(a)(3)(i).

Interim relief is authorized, pursuant to 10 CFR 50.55a(a)(3)(ii), for relief request number 10 for the upcoming Turkey Point Units 3 and 4 refueling

outages, currently scheduled for September 1995, for Unit 3, and Harch
1996, for Unit 4.

This interim relief is authorized because of hardship without compensating increase in the level of quality or safety and is terminated at the completion of the refueling outages previously mentioned.

9506230259 950609 PDR ADOCK 05000250 P

PDR

~A>

l%C RI.E CEHTEII CPS/

Mr. J.

H. Goldberg Our Safety Evaluation and the INEL Technical Evaluation Report are enclosed.

TAC Nos.

M87725 and M87726 remain open pending review of relief request number 4.

Sincerely, (Original Signed By B. Buckley For)

David B. Matthews, Director Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket Nos.

50-250 and 50-251

Enclosures:

As stated cc w/enclosures:

See next page Document Name:

G:

TURKEY TP87726.REL Distribution Docket File KLandis, RII PUBLIC PDII-1 RF SVarga JZwolinski ACRS 4

OFFICE LA:PD II-1 PM: PDII-1 D:P I-OGC NAME Dunn'on RCrotea DMa thew 8/4~4~

DATE 06 /

95 06 t

95 06 95 06 4 95 COPY es o

Ye No Yes No OFFICIAL RECORD COPY

Hr. J.

H. Goldberg Florida Power and Light Company Turkey Point Plant Cco J.

R.

Newman, Esquire
Morgan, Lewis & Bockius 1800 M Street, N.W.

Washington, DC 20036 Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature ill West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center
Miami, Florida 33131-2398 Hr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.

Box 1448 Homestead, Florida 33090 Hr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Mr. Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Hr. H. N. Paduano, Manager Licensing 5 Special Programs Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420 Hr. Edward J.

Weinkam Licensing Manager Turkey Point Nuclear Plant P.O.

Box 4332 Princeton, Florida 33032-4332