Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247P485 + (ML20247P485)
- IR 05000354/1989014 + (ML20247P486)
- ML20247P487 + (ML20247P487)
- ML20247P488 + (ML20247P488)
- ML20247P490 + (ML20247P490)
- ML20247P495 + (ML20247P495)
- ULNRC-03836, Forwards Summary of Evaluations &/Or Mods That Have Been Performed to Date in Response to Issues Raised in NRC GL 96-06 Re Containment Penetration overpressurization.W/31 Oversize Drawings + (ML20247P496)
- IA-89-207, Final Response to FOIA Request.App a Records Encl & Available in PDR + (ML20247P497)
- ML20247P497 + (ML20247P497)
- ML20247P499 + (ML20247P499)
- ML20247P504 + (ML20247P504)
- IR 05000361/1998005 + (ML20247P505)
- ML20247P506 + (ML20247P506)
- ML20247P507 + (ML20247P507)
- ML20247P508 + (ML20247P508)
- 05000277/LER-1989-011, :on 890424,scram Discharge Vol Drain & Vent Valve Stroking Surveillance Test Not Performed.Caused by Procedural Deficiency & Scheduling Error.Surveillance Test Completed Satisfactorily on 890429 + (ML20247P514)
- ML20247P515 + (ML20247P515)
- ML20247P516 + (ML20247P516)
- ML20247P519 + (ML20247P519)
- ML20247P521 + (ML20247P521)
- ML20247P523 + (ML20247P523)
- ML20247P524 + (ML20247P524)
- ML20247P534 + (ML20247P534)
- ML20247P536 + (ML20247P536)
- ML20247P537 + (ML20247P537)
- ML20247P538 + (ML20247P538)
- ML20247P548 + (ML20247P548)
- ML20247P550 + (ML20247P550)
- ML20247P551 + (ML20247P551)
- W3P89-0320, Corrects Cask Number Ref in Requesting Registration as User of Certificate of Compliance 9159.Util Will Be Using Cask Nupac 14/190H + (ML20247P552)
- IR 05000260/1989029 + (ML20247P553)
- 05000424/LER-1998-004, :on 980420,ECCS Accumulators Were Unable to Mitigate Consequences of an Accident.Caused by Incorrect Application of Scaling Data Into Calibration Procedures. Revised Calibration Procedures + (ML20247P554)
- ML20247P555 + (ML20247P555)
- ML20247P557 + (ML20247P557)
- ML20247P559 + (ML20247P559)
- ML20247P561 + (ML20247P561)
- ML20247P565 + (ML20247P565)
- ML20247P566 + (ML20247P566)
- B17252, Provides Alternative to Requirements of ASME Boiler & Pressure Vessel Code,Section III,NC-3677.3,1971 Edition Summer 1973 Addenda for Relief Valve Discharge to Common Header,Iaw 10CFR50.55a(a)(3)(i) + (ML20247P567)
- ML20247P570 + (ML20247P570)
- ML20247P571 + (ML20247P571)
- ML20247P572 + (ML20247P572)
- ML20247P574 + (ML20247P574)
- 05000336/LER-1997-022-03, Forwards LER 97-022-03,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970602.LER Suppl Provides Update on Results of Analyses & Investigation.Util Commitments Made within Ltr Included in Attachm + (ML20247P575)
- ML20247P577 + (ML20247P577)
- 05000333/LER-1989-014, :on 890817,HPCI Pump Turbine Declared Inoperable Due to Water in Lubricating Oil.Caused by Leaking Steam Supply Isolation Valve.Turbine Oil Sump Drained & Refilled W/New Oil + (ML20247P578)
- 05000364/LER-1998-004, Forwards LER 98-004-00,IAW 10CFR50.73(a)(2)(i).Commitments Made within Ltr,Listed + (ML20247P582)
- ML20247P585 + (ML20247P585)
- ML20247P586 + (ML20247P586)
- ML20247P587 + (ML20247P587)
- ML20247P592 + (ML20247P592)