Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247P457 + (ML20247P457)
- ML20247P458 + (ML20247P458)
- W3P89-1575, Monthly Operating Rept for Aug 1989 for Waterford 3 + (ML20247P459)
- 05000267/LER-1989-012, :on 890628,determined That Unanalyzed Gas Waste Release Occurred from Gas Waste Surge Tank 1A.Caused by Personnel Error.Release Terminated.Tank Contents Sampled & Analyzed.Operators Disciplined + (ML20247P460)
- 05000324/LER-1989-011-02, :on 890703,RCIC Turbine Received Trip Signal & Inboard Steam Supply Isolation Valve E51-F007 Closed Due to False Primary Containment Div I Group 5 Isolation Signal. Caused by Personnel Error.Personnel Counseled + (ML20247P463)
- 05000346/LER-1989-009, :on 890629,determined That HPI Sys Line Isolation Valves in Both HPI Trains Would Not Fully Open within 30 S.Caused by Inadequate Design.Temporary Mods 89-0022 & 89-0025 Implemented + (ML20247P467)
- ML20247P468 + (ML20247P468)
- ML20247P469 + (ML20247P469)
- ML20247P474 + (ML20247P474)
- 05000354/LER-1989-013-02, :on 890629,failure to Perform Required Local Leak Rate Testing on Hpci/Rcic Turbine Exhaust Vacuum Relief Piping Identified.Caused by Valves Not Being Included in Scope of Inservice Test Program + (ML20247P475)
- GO2-89-131, Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld + (ML20247P478)
- 05000461/LER-1998-018, :on 980416,ESFA,occurred.Caused by Deficiencies in Method Used to Perform Nsps Power Supply Adjustment. Developed Maint Procedure for Replacement of Power Supplies Powered by Nsps Bus + (ML20247P480)
- 05000458/LER-1988-011, :on 880503,containment Isolation Valve Discovered to Be Inoperable for Time Greater than Allowed by Tech Specs.Caused by Torque Arm Key Fallen Out of Keyway. Valve Repaired & Personnel Instructed + (ML20247P481)
- ML20247P482 + (ML20247P482)
- ML20247P483 + (ML20247P483)
- ML20247P485 + (ML20247P485)
- IR 05000354/1989014 + (ML20247P486)
- ML20247P487 + (ML20247P487)
- ML20247P488 + (ML20247P488)
- ML20247P490 + (ML20247P490)
- ML20247P495 + (ML20247P495)
- ULNRC-03836, Forwards Summary of Evaluations &/Or Mods That Have Been Performed to Date in Response to Issues Raised in NRC GL 96-06 Re Containment Penetration overpressurization.W/31 Oversize Drawings + (ML20247P496)
- IA-89-207, Final Response to FOIA Request.App a Records Encl & Available in PDR + (ML20247P497)
- ML20247P497 + (ML20247P497)
- ML20247P499 + (ML20247P499)
- ML20247P504 + (ML20247P504)
- IR 05000361/1998005 + (ML20247P505)
- ML20247P506 + (ML20247P506)
- ML20247P507 + (ML20247P507)
- ML20247P508 + (ML20247P508)
- 05000277/LER-1989-011, :on 890424,scram Discharge Vol Drain & Vent Valve Stroking Surveillance Test Not Performed.Caused by Procedural Deficiency & Scheduling Error.Surveillance Test Completed Satisfactorily on 890429 + (ML20247P514)
- ML20247P515 + (ML20247P515)
- ML20247P516 + (ML20247P516)
- ML20247P519 + (ML20247P519)
- ML20247P521 + (ML20247P521)
- ML20247P523 + (ML20247P523)
- ML20247P524 + (ML20247P524)
- ML20247P534 + (ML20247P534)
- ML20247P536 + (ML20247P536)
- ML20247P537 + (ML20247P537)
- ML20247P538 + (ML20247P538)
- ML20247P548 + (ML20247P548)
- ML20247P550 + (ML20247P550)
- ML20247P551 + (ML20247P551)
- W3P89-0320, Corrects Cask Number Ref in Requesting Registration as User of Certificate of Compliance 9159.Util Will Be Using Cask Nupac 14/190H + (ML20247P552)
- IR 05000260/1989029 + (ML20247P553)
- 05000424/LER-1998-004, :on 980420,ECCS Accumulators Were Unable to Mitigate Consequences of an Accident.Caused by Incorrect Application of Scaling Data Into Calibration Procedures. Revised Calibration Procedures + (ML20247P554)
- ML20247P555 + (ML20247P555)
- ML20247P557 + (ML20247P557)
- ML20247P559 + (ML20247P559)
- ML20247P561 + (ML20247P561)