Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NOC-AE-000179, Documents Change of Schedule for Written Portion of Licensed Operator Exams to Be Conducted at Stp.Operational Portion of Exam Will Still Be Taken During Wk of 980601 & Written Portion Will Be Given on 980630 + (ML20247P407)
- ML20247P410 + (ML20247P410)
- JPN-98-019, Informs of Revs to ISI Program Relief Requests for Second ten-year Interval Closeout & Summary Rept,Submitted 970715. Replacement Pages,Reflecting Changes,Encl + (ML20247P411)
- IR 05000369/1989030 + (ML20247P415)
- ML20247P417 + (ML20247P417)
- ML20247P418 + (ML20247P418)
- U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable + (ML20247P420)
- ML20247P423 + (ML20247P423)
- IR 05000397/1998002 + (ML20247P424)
- ML20247P426 + (ML20247P426)
- ML20247P428 + (ML20247P428)
- ML20247P429 + (ML20247P429)
- IR 05000254/1997023 + (ML20247P431)
- ML20247P433 + (ML20247P433)
- ML20247P440 + (ML20247P440)
- ML20247P441 + (ML20247P441)
- 05000301/LER-1989-004-01, :on 890820,reactor Tripped Following Turbine Trip Initiated by Generator Breaker Trip.Caused by Main Stepup Transformer Lockout & Loss of Electrical Load Due to Actuation of Relay.Transformer Returned to Svc + (ML20247P443)
- ML20247P445 + (ML20247P445)
- AECM-89-172, Monthly Operating Rept for Aug 1989 for Grand Gulf Nuclear Station Unit 1 + (ML20247P447)
- AECM-89-0172, Monthly Operating Rept for Aug 1989 for Grand Gulf Nuclear Station Unit 1 + (ML20247P447)
- ML20247P448 + (ML20247P448)
- ML20247P451 + (ML20247P451)
- ML20247P453 + (ML20247P453)
- ML20247P455 + (ML20247P455)
- ML20247P457 + (ML20247P457)
- ML20247P458 + (ML20247P458)
- W3P89-1575, Monthly Operating Rept for Aug 1989 for Waterford 3 + (ML20247P459)
- 05000267/LER-1989-012, :on 890628,determined That Unanalyzed Gas Waste Release Occurred from Gas Waste Surge Tank 1A.Caused by Personnel Error.Release Terminated.Tank Contents Sampled & Analyzed.Operators Disciplined + (ML20247P460)
- 05000324/LER-1989-011-02, :on 890703,RCIC Turbine Received Trip Signal & Inboard Steam Supply Isolation Valve E51-F007 Closed Due to False Primary Containment Div I Group 5 Isolation Signal. Caused by Personnel Error.Personnel Counseled + (ML20247P463)
- 05000346/LER-1989-009, :on 890629,determined That HPI Sys Line Isolation Valves in Both HPI Trains Would Not Fully Open within 30 S.Caused by Inadequate Design.Temporary Mods 89-0022 & 89-0025 Implemented + (ML20247P467)
- ML20247P468 + (ML20247P468)
- ML20247P469 + (ML20247P469)
- ML20247P474 + (ML20247P474)
- 05000354/LER-1989-013-02, :on 890629,failure to Perform Required Local Leak Rate Testing on Hpci/Rcic Turbine Exhaust Vacuum Relief Piping Identified.Caused by Valves Not Being Included in Scope of Inservice Test Program + (ML20247P475)
- GO2-89-131, Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld + (ML20247P478)
- 05000461/LER-1998-018, :on 980416,ESFA,occurred.Caused by Deficiencies in Method Used to Perform Nsps Power Supply Adjustment. Developed Maint Procedure for Replacement of Power Supplies Powered by Nsps Bus + (ML20247P480)
- 05000458/LER-1988-011, :on 880503,containment Isolation Valve Discovered to Be Inoperable for Time Greater than Allowed by Tech Specs.Caused by Torque Arm Key Fallen Out of Keyway. Valve Repaired & Personnel Instructed + (ML20247P481)
- ML20247P482 + (ML20247P482)
- ML20247P483 + (ML20247P483)
- ML20247P485 + (ML20247P485)
- IR 05000354/1989014 + (ML20247P486)
- ML20247P487 + (ML20247P487)
- ML20247P488 + (ML20247P488)
- ML20247P490 + (ML20247P490)
- ML20247P495 + (ML20247P495)
- ULNRC-03836, Forwards Summary of Evaluations &/Or Mods That Have Been Performed to Date in Response to Issues Raised in NRC GL 96-06 Re Containment Penetration overpressurization.W/31 Oversize Drawings + (ML20247P496)
- IA-89-207, Final Response to FOIA Request.App a Records Encl & Available in PDR + (ML20247P497)
- ML20247P497 + (ML20247P497)
- ML20247P499 + (ML20247P499)
- ML20247P504 + (ML20247P504)
- IR 05000361/1998005 + (ML20247P505)