Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247K504 + (ML20247K504)
- ML20247K505 + (ML20247K505)
- 1CAN098904, Monthly Operating Rept for Aug 1989 for Arkansas Nuclear One Unit 1 + (ML20247K511)
- ML20247K512 + (ML20247K512)
- ML20247K513 + (ML20247K513)
- ML20247K514 + (ML20247K514)
- ML20247K515 + (ML20247K515)
- ML20247K517 + (ML20247K517)
- ML20247K518 + (ML20247K518)
- ML20247K519 + (ML20247K519)
- 05000458/LER-1989-021, :on 890427,during Refueling,Unplanned ESF Actuation Occurred.Caused by Power Transient to Several Trip Cards Resulting from Shorting of Test Connection.Rhr Shutdown Cooling Restored & Actuation Reset + (ML20247K522)
- ML20247K523 + (ML20247K523)
- ML20247K524 + (ML20247K524)
- ML20247K526 + (ML20247K526)
- ML20247K527 + (ML20247K527)
- ML20247K528 + (ML20247K528)
- 05000455/LER-1998-004-04, :on 980419,FHB Rad Monitor ESF Actuation, Occurred.Caused by High Dose Water in Fuel Transfer Canal. Fhb Dose Rates Monitored + (ML20247K531)
- ML20247K533 + (ML20247K533)
- ML20247K534 + (ML20247K534)
- IR 05000245/1997212 + (ML20247K535)
- 2CAN098909, Monthly Operating Rept for Aug 1989 for Arkansas Nuclear One Unit 2 + (ML20247K541)
- ML20247K545 + (ML20247K545)
- IR 05000266/1989018 + (ML20247K549)
- ML20247K553 + (ML20247K553)
- ML20247K556 + (ML20247K556)
- ML20247K558 + (ML20247K558)
- 05000313/LER-1988-029, Forwards LER 88-029-00 Re Seismic Qualification of RCS Letdown.Rept Date in Relation to Date of Determination Discussed W/Nrc in 890714 & 0721 Ltrs + (ML20247K560)
- ML20247K562 + (ML20247K562)
- ML20247K563 + (ML20247K563)
- ML20247K564 + (ML20247K564)
- ML20247K565 + (ML20247K565)
- ML20247K566 + (ML20247K566)
- ML20247K567 + (ML20247K567)
- ML20247K570 + (ML20247K570)
- ML20247K571 + (ML20247K571)
- IR 05000245/1997012 + (ML20247K572)
- ML20247K573 + (ML20247K573)
- ML20247K574 + (ML20247K574)
- ML20247K575 + (ML20247K575)
- ML20247K576 + (ML20247K576)
- 05000267/LER-1988-015, :on 881011,during Loss of Outside Electric Power & Turbine Trip Surveillance Test,Loss of Power to 480-volt Essential Buses Occurred.Caused by Failure of Diesel Generator Output Breakers to Close + (ML20247K577)
- ML20247K581 + (ML20247K581)
- IR 05000382/1989020 + (ML20247K582)
- ML20247K584 + (ML20247K584)
- ML20247K585 + (ML20247K585)
- ML20247K588 + (ML20247K588)
- 05000331/LER-1989-006, :on 890224,isolation of RCIC & on 890302, Isolation of HPCI Occurred.Caused by Problems in Electrical Path from Thermocouples Monitoring Area Temp.Retermination of Broken Thermocouple Wire Before Break + (ML20247K589)
- ML20247K590 + (ML20247K590)
- ML20247K591 + (ML20247K591)
- ML20247K597 + (ML20247K597)
- ML20247K598 + (ML20247K598)