ML20247K519

From kanterella
Jump to navigation Jump to search
Notice of Pending NRC Action to Submit Info Collection Request to OMB & Solicitation of Public Comment.Info Collection Entitled, 10CFR73 - Physical Protection of Plants & Matls
ML20247K519
Person / Time
Issue date: 04/23/1998
From: Shelton B
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
To:
References
NUDOCS 9805220121
Download: ML20247K519 (35)


Text

,

[/M '

w. e 3

[7590-01-P]

L NECElVED U. S. NU REhuhTb'RNOMMISSION UBLic DOCUMENT ROOH Agency information Collection Activities: Proposed Collection; Comment request i

l AGENCY: U. S. Nuclear Regulatory Commission (NRC) l l

)

ACTION: Notice of pending NRC action to submit an information collection request to OMB and solicitation of public comment. i

SUMMARY

The NRC is preparing a submittal to OMB for review of continued approval of information collections under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35).

4 Information pertaining to the requirement to be submitted:

1 1

i

1. The title of the information collection:

10 CFR Part 73 - Physical Protection of Plants and Materials

2. Current OMB approval number: 3150-0002
3. How often the collection is required: On occasion. Required reports are )

l l submitted and evaluated as events occur.

i 9805220121 980423 O\  !

PDR ORG EUSOMB /L  ;

PDR l

/

c{R-ty '

Sgt

... w a9 9 QO 3 /?op- p 3 w__ ________ _ _ ___ _ - _ - _ __. - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _______a

i

, s 1 l

l

4. Who is required or asked to report: Persons who possess, use, import, export, transport, or deliver to a carrier for transport, special nuclear ,

i l

material, i

1 The number of annual responses: 68,643 5.

6. The number of hours needed annually to complete the requirement or request: The industry total burden is 410,602 hours0.00697 days <br />0.167 hours <br />9.953704e-4 weeks <br />2.29061e-4 months <br /> annually (43, 241.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> for reporting and 367,359.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for recordkeeping).
7. Abstract: NRC regulations in 10 CFR Part 73 prescribe requirements for establishment and maintenance of a physical protection system with capabilities for protection of special nuclear material at fixed sites and in transit and of plants in which special nuclear material is used. The information in the reports and records is used by the NRC staff to ensure that the health and safety of the public is protected and that licensee possession and use of special nuclear material is in compliance with license and regulatory requirements.

Submit, by (insert date 60 days after publication in the Federal Reaister), comments that address the following questions:

1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?

2

- - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ A

I I 2. Is the burden estimate accurate?

3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?

l

4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology?

A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room,2120 L Street, NW (lower level), Washington, DC. OMB clearance requests are available at the NRC worldwide web site (http://www.nrc. gov) under the FedWorld collection l

link on the home page tool bar. The document will be available on the NRC home page site for 60 days after the signature date of this notice, j i

3 I

, o*

Comments and questions about the information collection requirements may be directed to the NRC Clearance Officer, Brenda Jo. Shelton, U.S. Nuclear Regulatory Commission, T-6 F33, Washington, DC,20555-0001, or by telephone at 301-415-7233, or by Internet electronic mail at BJSi@NRC. GOV.

1

- en !

Dated at Rockville, Maryland, this Mb day of 1998. p//

For the Nuclear Regulatory Commission.

- 1 A t. 1- . /)._ )

Jo. Sher 6n, NRCCIearance Officer prendh,f Office o the Chief Information Officer  !

4 l

l

)

l 4

{


.--a----- - - - - - - - _ - - - - . - - - - - - - - - - - - -. -- - --- - -- - - - - -- - - - - - - - - - _ - - - -

. +

r ~ ,, r . . -

' SUPPORTING STATEMENT O ~

a EOff.L _ , , , -

l .

~

10 CFR PART 73 m 8: 04 PHYSICAL PROTECTION QF#1.ANppND ""MA}ERIALS (3'150%002f EXTENSION REQUEST l

Description of the Information ' Collection NRC regulations in 10 CFR Part 73 prescribe requirements for the establishment and maintenance of a systcm for physical protection of special nuclear material (SNM) at fixed sites and in transit and of plants in which SNM is used. The regulations are issued pursuant to the Atomic Energy Act of 1954, as amended, and Title 11 of the Energy Reorganization Act of 1974,

. as amended. Part 73 contains reporting and recordkeeping requirements which are necessary to help ensure that an adequate level of protection is provided for nuclear facilities and material.

A. Justification

1. Need for and Practical Utility of the Information l- In general, the reports and records are necessary for one or more of the following reasons:
1) Information describing the content and planned operation of the licensee's physical protection system (e.g., Security Plan or Contingency Plan). The information is essential to permit NRC to make a determination as to the adequacy of the licensee's planned system in meeting regulatory requirements.
2) Information describing the normal operation of the physical protection system (e.g.,

access authorizations, equipment performance logs). The information is needed to permit NRC to make a determination as to reasonable assurance that the physical protection system operates in accordance with the regulatory requirements.

3)' information notifying NRC of the occurrence of and circumstances concerning abnormal events (e.g., report of theft, sabotage, or overdue shipment). The information is needed to enable NRC to fulfill its responsibilities to respond to, investigate, and correct situations which adversely affect public health and safety or the common defense and security.

Specific requirements for reports and records in Part 73 are as follows.

~ Section 73.5 provides that the Commission may grant exemptions from the requirements of the regulations in Part 73 under specified conditions, upon the application of any interested person j or on its own initiative. Applications under this section are examined by the NRC staff to j determine whether tir requested exemption is authorized by law and whether it will not 1 I

endanger life or property or the common defense and security, and to determine if it is otherwise in the public interest, f -

n

Section 73.20(c) requires that each affected licensee shall establish, maintain, and follow NRC approved safeguards physical protection, contingency, and if appropriate, transportation protection plans. The required plans are used to review the adequacy of a licensee's intended i security system and serve as an enforceable document for compliance and enforcement l purposes.  !

Section 73.24(b)(1) requires that licensees maintain a log of the arrival at the final destination of each shipment. The record is necessary to ensure that there are not two or more shipments of SNM in transit at the same time which together would constitute a formula quantity, and to l ensure verification of the arrival of the shipment.  !

}

Section 73.25(b) requires procedures to restrict access to and activity in the vicinity of l transports and strategic special nuclear material (SSNM). Section 73.25(c) requires procedures q to prevent or delay unauthorized entry or introduction of unauthorized materials into, and l unauthorized removal of, SSNM from transports. Section 73.25(d) requires procedures for responding to safeguards contingencies and emergencies in order to engage and impede f

j adversary forces untillocallaw enforcement forces arrive. These procedures are necessary to l

protect the material while in transit.

Section 73.26(b)(3) requires that, prior to each shipment, licensees provide information to NRC conceming the identity of the shipper, consignee, carriers, transfer points, modes of shipment, and security arrangements for the shipment. The information is needed to permit NRC to ensure that adequate measures will be taken to protect the material in transit.

Section 73.26(b)(4) requires that hand to hand receipts be completed at origin, destination, and all points enroute where there is a transfer of custody. These receipts are needed to provide a record of custody to verify that accountability for the shipment has been maintained.

Section 73.26(c) provides that required records of exports or imports must be maintained for 3 years after the licensee possesses the SNM, and that superseded material must be retained for .

3 years after the change. The records are reviewed by NRC inspectors to ensure compliance j with transportation protection requirements.  ;

Section 73.26(d)(3) requires that licensees maintain a written management system to provide for the development, revisio.i, implementation, and enforcement of transportation physical protection procedures. The system must include (1) written security procedures which document the structure of the transportation security organization and duties of personnel, and (2) provisions for written approval of procedures and revisions by the individual with overall responsibility for the security function. The information is needed to ensure compliance with, and oversight of, the transportation protection plan.

Section 73.26(d)(4) requires that licensees maintain documentation of qualification and )

requalification of members of the security organization. The record of initial qualification must  !

be maintained for the term of employment and the record of requalification must be retained for three years. The information is reviewed by NRC inspectors to ensure that security -

organization members are properly qualified in accordance with the safeguards transportation protection plan. l 1

2 i

-k $

h Section 73.26(e)(1) requires licensees to maintain a written safeguards contingency plan for dealing with threats, thefts, and radiological sabotage related to SSNM in transit. The plan must be retained for three years after the possession of the SSNM and superseded matcrial must be retained for three years after the change. The records are used by NRC inspectors to ensure that the licensee is adequately prepared to respond to different safeguards contingencies.

Section 73.26(h)(6) requires that licensees document the results of an annual audit of the transportation security program, along with recommendations for improvements, and that the documentation be retained as a record for 3 years. The records are reviewed by NRC inspectors to ensure that the effectiveness of the physical security system is evaluated by licensee personnelindependent of security management and supervision.

Section 73.26(i)(1) requires that licensees prepare a detailed route plan showing the routes to be taken, refueling and rest stops, and call-in times to the movement control center. This document is used to plan the movement of the shipment so that it is made on primary highways with minimum use of secondary roads, and to ensure that adequate measures for support and communications are available to protect the shipment.

Sections 73.26(i)(6) and 73.26(k)(4) require that, in the event that no communication is received from the shipment or escort personnel at a designated call-in time, the licent.ee must notify law enforcement authorities and the NRC Regional Office immediately and initiate appropriate contingency plans. This notification is necessary so that NRC can ensure that timely response or investigation actions may be undertaken.

Section 73.27/a)(1) requires that a licensee who delivers formula quantities of SSNM to a carrier for transport must immediately notify the consignee by telephone, telegraph, or teletype, of the time of departure of the shipment and method of transportation, including names of carriers, and the estimated time of arrival at destination. This information is needed to ensure that the consignee is aware that the shipment is enroute so the consignee can carry out the safeguards transportation protection plan.

Section 73.27(a)(2) requires that, in the case of an f.o.b. shipment, the licensee shipper must obtain written certification from the consignee who is to take delivery at the f.o.b. point that the required physical protection arrangements have been made. This information is needed to ensure that the safeguards transportation protection plan will be carried out.

Section 73.27(a)(3) requires that a shipper make arrangements to obtain immediate notification from the consignee of the arrival of a shipment at its destination or of any shipment that is lost or unaccounted for after the estimated time of arrival at its destination. This information is required so that the licensee can promptly notify NRC of any missing material so that a trace investigation may be initiated.

l, Section 73.27(b) requires a licensee who receives a shipment of formula quantities of SSNM to immediately notify the shipper and NRC of the arrival of the shipment at its destination, or of the failure of a shipment to arrive at its destination at the estimated time. In the latter event, the shipper must also notify NRC of the actions being taken to trace the shipment. This information 3

l

r.

i

> n ,

l l

l is needed to ensure that accountability is maintained for SSNM in transit, so that appropriate measures may be taken to initiate a trace and undertake recovery action if necessary.  ;

Section 73.27(c) requires that in the case c ' a lost or unaccounted for shipment, the licensee who made the physical protection arrangements must conduct a trace investigation and file with NRC a report of the investigation as specified in g 73.71. This information is needed to permit NRC to determine whether all appropriate measures have been taken to trace and recover the

material.

Section 73.37(a) requires licensees who ship irradiated reactor fuel to establish and maintain a physical protection system that includes provisions for notification to the appropriate response -

forces of any spent fuel shipment sabotage attempts. This notification is needed to ensure that l appropriate action is taken in accordance with the safeguards transportation protection plan.

i l

Section 73.37(b) requires that the physical protection system include a number of provisions,  !

l including: 6 73.37(b)(1) - advance notice to NRC of each shipment in accordance with 9 73.72; l

@ 73.37(b)(2) - a copy of current procedures for coping with circumstances that threaten deliberate damage to a spent fuel shipment and with other emergencies; 6 73.37(b)(3) - a copy of instructions for each escort which require that, upon the detection of certain threats, the escort must inform local law enforcement agencies of the threat and request assistance; 6 73.3?(b)(5) - a written log by the escorts and communications center personnel which

! describes significant events during the shipment; 6 73.37(b)(7)- advance approval by NRC of routes used for road and rail shipments of spent fuel, and for any U.S. ports where vessels carrying spent fuel shipments are scheduled to stop; 6 73.37(b)(11) - calls by the escort to the j communications center at least every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> These piocedures are needed to ensure that E

appropriate. measures are in place to protect the material during transport and that an adequate response is taken to emergencies affecting the shipment.

i l- Section 73.37(f) requires that the licensee notify the govemor of a State in writing prior to a .

shipment of spent fuel within or through a State. The notification must includ6 information on the shipper, carrier, and receiver, the shipment, routes to be used within the State, and the schedule to be followed. The licensee must also notify a designated state ufficial by telephone ,

or ether means of any schedule change that differs by more than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> from the previous schedule. The notifications ara necessary to ensure that the govemor of the state is provided with advance information, not otherwise available to the govemor, related to spent fuel transportation in the govemor's State.

Section 73.45 requires that the licensee's fixed site physical protection system contain certain provisions, including the following:

6 73.45(b)(2)(iilii) - Access authorization control procedures; 6 73.45(c)(1)(i)1iii)- Detection and surveillance procedures to detect unauthorized activity; 6 73.45(d)(ii-fiv) - Procedures to detect unauthorized placement and movement of SSNM l within material access areas; l 6 73.45(e)(1)(ii)- Procedures for the detection, assessment and communication of any attempts at unauthorized removal of SSNM from material access areas; i

4 I 1

L_________o_._u__

~ 6 73.45(eW2)(ii-fiii) - Procedures to confirm the identity and quantity of SSNM presented for removal and the identity of persons making the. removal; 6 73.45(f)(1Mii) - Procedures to detect, assess, and communicate any unauthorized access or penetrations of the protected area; ._ _

6 73.45(fM2MiVii) - Procedures to verify the identity of persons, materials, and vehicles and assess such identity against current authorization schedules and to initiate response measures to deny unauthorized access; 6 73.45(o)(2) - Response plan for safeguards contingency events.

These plans and procedures are required in order to ensure that measures are in place to control movement of persons, vehicles, and materials into or out of material access or vital areas and to detect, assess, and initiate appropriate response to any unauthorized penetration or access attempts.

Section 73.46(bM1) requires that, if a contract guard force is utilized, the licensee have a written agreement with the contractor that contains provisions showing that the licensee is responsible

- to NRC for maintaining safeguards in accordance with NRC regulations and the licensee's security plan, that NRC may inspect, copy, and remove copies of required reports and documents, and that the licensee must demonstrate the capability of the security force, including contractor personnel, to perform their assigned duties. This requirement is~necessary

. to ensure that the licensee makes the security force contractor aware of its responsibilities.

Section 73.46(bM3) requires that the licensee have written security procedures which document the structure of the security organization and which detail the duties of the Tactical Response Team, guards, watchmen, and other individuals responsible for security. The licensee must also have provisions for written approval of such procedures and any revisions thereto by the individual with overall responsibility for the security function. These procedures are necessary to ensure that a management system is in place, that responsibilities and duties are set forth

clearly, and that the security organization is adequate to provide protection in accordance with the security plan.

Section 73.46(b)(4) requires that the licensee document the results of each weapons qualification and requalification, the annual physical fitness performance test or the quarterly

- administered site specific content-based test. These records verify that qualification and requalification have occurred and provide a record of individual performances.

Section 73.46(b)(7) requires that licensees document the qualification and requalification of Tactical Response Team members, armed response personnel, and guards in day and night firing.. These records verify that qualification and requalification have occurred and provide a record of individual performances.

Sechon 73.46(bM8) requires that licensees document the training of Tactical Response Team members in response tactics. These records verify that training has occurred and provide a record of individual performances.

t Section 73.46(bM9) requires that the licensee notify NRC at least 60 days in advance of a scheduled training exercise for the security force which is required to be observed by NRC.

The licensee must also document the results of all exercises. The notification requirement 5

1

, . l l

l l

l allows NRC to arrange for NRC inspectors to observe the exercise. The documentation verifies that the exercise was conducted and provides a record of security force performance. j l

Section 73.46(b)(10)(iii) requires that the licensee obtain a written certification by an examining .

physician that there are no contraindications to individual's participation in the physical fitness I training program.

Section 73.46(b)(11)(i) requires that the licensee retain a record of each security force member's attempt to qualify or requalify by meeting or exceeding the applicable qualification criteria. This is a . repetition of the requirement in 10 CFR 73.46(b)(4).

Section 73.46(b)(11)(iii) requires that prior to participation in the physical performance testing each security force member must obtain a medical clearance from a licensed practitioner stating that there are no medical contraindications to the individual's participation in such testing.

Section 73.46fb)(12) and 73.46(b)(12)(i) when taken together require the submission of the site specific content-based tests for NRC's approval. This information is incorporated into the Licensee's Physical Protection Plan and may be used by NRC to inspect the physical performance testing programs to ensure that they are adequate to protect the health and safety of the public.

Section 73.46(b)(12)(ii) requires that, prior to the administration of the site specific content-based physical fitness tests and annually thereafter, a physical examination be conducted and a written certification, that there are no medical contraindications to participation in the tests, be obtained from a licensed physician.

Section 73.46(d)(3) requires the licensee to maintain written procedures that permit access control personnel to identify those vehicles that are authorized and those materials that are not authorized entry to protected, material access, and vital areas. These procedures are necessary to ensure compliance with access control provisions of the security plan.

Section 73.46(d)(10) requires that the licensee must maintain records of the findings of teams conducting drum scanning and tamper sealing of containers of contaminated waste. These records verify that the scan.)ing was conducted and document the scan readings for later use in review of the waste shipments if needed.

Section 73.46(d)(11) requires that licensee teams must verify and certify the contents of containers of SSNM being prepared for shipment offsite. These records verify the weight, assay, and tamper sealintegrity of the containers.

Section 73.46(d)(131 specifies that licensees must require that individuals provided escorted access to protected areas register their name, date, time, purpose of visit and employment affiliation, citizenship, and name of the individual to be visited in a log. The log serves as a record of visitors permitted access, serves as an inspectable document to verify that access control requirements are being followed, and facilitates any subsequent investigation of irregular events.

6

l :' '

l . .

1-l a Section 73.46(g)(5) requires that the licensee maintain corrective action procedures for use in the event of failure or other contingencies affecting the operation of security related equipment or structures. The security organization must be notified before and after service is performed l on such equipment. These procedures are needed to ensure that compensatory measures will be employed in the event of failure or inoperability of physical protection related systems.

Section 73.46(g)(6) requires the documentation and reporting to management of the results of an annualindependent review and audit of the security program. The records are reviewed by NRC inspectors to ensure that the effectiveness of the security program is evaluated by -

licensee personnel independent of security management and supervision and that the results of the review are reported to higher management. These records must be retained for 3 years.

Section 73.46(h)(1) requires that licensees maintain a safeguards contingency plan for dealing with threats, thefts, and radiological sabotage related to SSNM and nuclear facilities. This document is used by the licensee to set forth plans for dealing with contingencies as outlined in Appendix C to Part 73. The plan is used by NRC in the licensing approval process to ensure sufficient scope and depth in the contingency planning area and also serves as a compliance benchmark during the inspection process.

Section 73.46(bX2) requires that licensees establish and document a response agreement with local law enforcement authorities. The agreement is used to verify law enforcement response capabilities and to ensure a clear understanding by both parties of what is expected and what law enforcement assistance will be provided in case of an emergency.

Section 73.46(hi(3) requires that licensees include in the physical protectbn plans submitted to NRC the basis for the determination of the size and availability of an additional force of guards or armed response personnel. This information permits NRC to ensure that the licensee has made appropriate provision for an onsite response force to engage and impede an adversary force until offsite assistance arrives.

Sechon 73.46(h)(4) requires that licensees inform local law enforcement agencies of any detected threat and request assistance. This notification requirement is necessary to ensure that law enforcement assistance is obtained to help neutralize any threat to vital areas or material access areas.

Section 73.46(h)(5) requires that licensees instruct all guards and armed response personnel regarding the use of force, including deadly force when necessary for self-defense or defense of others, to prevent or impede acts of radiological sabotage or theft of SSNM.

Section 73.46(i)(1) requires that licensees submit a revised fixed site physical prott.:: tion plan to NRC for approval. This requirement is necessary to conform licensee plans to current NRC regulations. Tha NRC regulations concerning physical protection, security personnel performance and design basis threat for certain fuel facilities provide requirements for guard weaponry, training, and tactical response exercises, as well as certain physical security measures.

I 7

1 1

' Section 73.50(a)(3) requires that certain licensees who possess, use, or store formula ,

quantities of SSNM must maintain written security procedures that document the structure of l

' the security organization and detail the duties of guards, watchmen, and other individuals

. responsible for security. These procedures are necessary to ensure that responsibilities and duties are set forth clearly, and that the security organization is adequate to provide protection j in accordance with the security plan. l l

Section 73.50(a)(4) requires that licensees document the qualification and requalification of I guards, watchmen, and other members of the security organization. These records verify that  !

qualification and requalification have occurred and provide a record of individual performances. ,

l Section 73.50(c)(5) specifies that licensees must require that individuals provided escorted l access to protected areas register their name, date, time, purpose of visit and employment I affiliation, citizenship, name and badge number of the escort, and name of the individual to be visited in a log. The log serves as a record of visitors permitted access, serves as an inspectable document to verify that access control requirements are being followed, and facilitates any subsequent investigation of irregular events.

Section 73.50(a)(1) requires that licensees maintain an NRC approved safeguards contingency ,

plan for dealing with threats, thefts, and radiological sabotage related to SSNM and nuclear  !

facilities. This document is used by the licensee to ut forth plans for dealing with contingencies as outlined in Appendix C to Part 73. Tk plan is used by NRC in the licensing i approval process to ensure sufficient scope and depth in the contingency planning area and also serves as a compliance benchmark during the inspection process, i Section 73.50(a)(2) requires that licensees establish and document a response agreement with local law enforcement authorities. The agreement is used to verify law enforcement response capabilities and to ensure a clear understanding by both parties of what is expected and what  ;

law enforcement assistance will be provided in case of an emergency.

Section 73.50(a)(3) requires that licensees inform local law enforcement agencies of any l detected threat and request assistance. This notification requirement is necessary to ensure i that law enforcement assistance is obtained to help neutralize any threat to vital areas or material access areas.

Section 73.50(a)(4) requires that licensees instruct all guards and armed response personnel regarding the use of force, including deadly force when necessary for self-defense or defense ,

of others, to prevent or impede acts of radiological sabotage or theft of SSNM. l Section 73.50(h) requires that licensees establish, maintain, and follow an NRC approved training and qualifications plan outlining the processes by which guards, watchmen, armed response persons, and other members of the security organization will be selected, trained, I equipped, tested, and qualified. This section required preparation of a plan for spent fuel L storage facility security forces training and qualification. It serves as a basis for NRC j assessments of licensee adequacy in security force training and qualification and serves as an inspection reference in verifying licensee performance.

i 8

l

r ., .

Section 73.55 requires that licensees submit proposed amendments to their security plans which show how the amended regulations regarding physical protection against radiological sabotage will be net. The plans were required in order to allow NRC to determine that licensees had made adequate provisions to protect against the design basis threat of radiological sabotage. All such amendments under this section have been previously submitted and no new burden is anticipated.

Section 73.55(b)(1) requires that, if a contract guard force is utilized, the licensee have a written agreement with the contractor that contains provisions showing that the licensee is responsible to NRC for maintaining safeguards in accordance with NRC regulations and the licensee's security plan, that NRC may inspect, copy, and remove copies of required reports and documents, and that the licensee must demonstrate the capability of the security force, including contractor personnel, to perform their assigned duties. This requirement is necessary to ensure that the licensee makes the security force contractor aware of its responsibilities.

Section 73.55(bM3) requires that the licensee have written security procedures which document the structure of the security organization and which detail the duties of guards, watchmen, and other individuals responsible for security. The licensee must also have provisions for written approval of such procedures and any revisions thereto by the individual with overall responsibility for the security function. These procedures are necessary to ensure that a )

management system is in place, that responsibilities and duties are set forth clearly, and that the security organization is adequate to provide protection in accordance with the security plan. 3 I

Section 73.55(b)(4)(i) requires that licensees document the qualification and requalification of guards, watchmen, armed response persons, and other members of the security organization.

These records verify that qualification and requalification have occurred and provide a record of -

individual performances.

Section 73.55(bV4)(ii) requires that licensees submit a training and qualifications plan to NRC

- for approval setting forth the process and schedule by whh guards, watchmen, armed response persons, and other members of the security organization will be selected, trained, equipped, tested, and qualified. This section requires preparation of a plan for power reactor security forces training and qualification. It serves as a basis for NRC assessments of licensee adequacy in security force training and qualification and serves as an inspection reference in verifying licensee performance.

Section 73.55(cV7) - requires applicable licensees to establish vehicle control measures and to design and install a vehicle barrier system. This requirement is necessary to protect against the use of a land vehicle to gain unauthorized proximity to vital areas.

]

Section 73.55(cV8) - requires licensee to compare the vehicle control measures established in accordance with 10 CFR 73.55(c)(7) to the Commission's design goals and criteria for protection against a land vehicle bomb; and either confirm to the Commission that the vehicle control measures meet the design goals and criteria specified, or propose alternative measures that, in addition to the measures established in accordance with 10 CFR 73.55(c)(7), describe the level of protection that these measures would provide against a land vehicle bomb, and l compare the costs of the alternative measures with the cost of measures necessary to fully 9 l l

L---_--_-_--_--______--__.-_____-- _ _ - - - - - _ . - - _ - -- _ _ - - _ _ -- ---- _ _ -___-----_ _ _ - - - _ - - _ _ - - _ _ o

meet the design goals and criteria. This requirement is needed to give the NRC confirmation that the licensee hi; met the Commission's design goal.

Section 73.55(c)(9)(0 - requires licensees to submit to the Commission a summary description of the proposed vehicle control measures as required by 10 CFR 73.55(c)(7) and the results of the vehicle bomb comparison as required by 10 CFR 73.55(c)(8). For licensees proposing alternative measures as provided for in 10 CFR 73.55(c)(8), the submittal must include the analysis and justification for the proposed alternatives. This submittal will ensure the NRC that the licensee is meeting the intent of the rule.

Section 73.55(c)(9)(iv) - requires licensees ' dn, in accordance with 10 CFR 73.70, all comparisons and analyses prepared pursui .' ' 10 CFR 73.55(c)(7) and (8). The requirement will ensure that the licensee remains in compliance with the rule.

Section 73.55(c)(1Q1 - requires applicants for a license to operate a nuclear power reactor to incorporate the vehicle control program into the site physical security plan. This information is incorporated into the Licensee's Physical Protection Plan and may be used by NRC to inspect the measures that have been put into place to protect against a land vehicle bomb.

t Section 73.55(d) requires that each licensee define how the final search requirements of this section will be met. This requirement is necessary to permit NRC to determine that the licensee has made adequate provisions to detect and prevent access of firearms, explosives, and incendiary devices.

Section 73.55(d)(6) specifies that licensees must require that individuals provided escorted access to protected areas register their name, date, time, purpose of visit and employment affiliation, citizenship, and name of the individual to be visited in a log. The log serves as a record of visitors permitted access, sarves as an inspectable document to verify that access control requirements are being followed, and facilitates any subsequent investigation of irregular events.

Section 73.55(d)(7) requires the licensee to establish, maintain, and update an access authorization list for each vital area. This requirement is used to limit unescorted access to vital areas during nonemergency conditions to individuals who require access in order to perform their duties.

Section 73.5S(o)(1) requires that the licensee maintain corrective action procedures for use in the event of failure or other contingencies affecting the operation of security related equipment or structures. These procedures are needed to ensure that compensatory measures will be employed in the event of failure or inoperability of physical protection related systems.

Section 73.55(o)(A) requires the documentation and reporting to management of the results of an annualindependent review and audit of the security program. The records are reviewed by NRC inspectors to ensure that the effectiveness of the security program is evaluated by licensee personnelindependent of security management and supervision and that the results ef the review are reported to higher management.

10

z . -. .

A Section 73.55(h)(1) requires that licensees execute a safeguards contingency plan for dealing with threats, thefts, and radiological sabotage related to the nuclear facilities. This document is used by the licensee to set forth plans for dealing with contingencies as outlined in Appendix C l

to Part 73. The plan is used by NRC in the licensirig approval process to ensure sufficient l scope and depth in the contingency planning area and also serves as a compliatore benchmark during the inspection process.

I l Section 73.55(h)(2) requires that licensees establish and document liaison with local law l

enforcement authorities. The agreement is used to verify law enforcement response capabilities and to ensure a clear understanding by both parties of what is expected and what law enforcement assistance will be provided in case of an emergency.

Section 73.55(h)(4) requires that licensees irform local law enforcement agencies of any detected threat and request assistance. This notification requirement is necessary to ensure that law enforcement assistance is obtained to help neutralize any threat to vital areas or material access areas.

Section 73.55(h)(5) requires that licensees instruct all guards and armed response personnel regarding the use of force, including deadly force when necessary for self-defense or defense of others, to prevent or impede acts of radiological sabotage or theft of SSNM.

Section 73.56 provides personnel access authorization requirements for nuclear power plants.

All licensees authorized to operate a nuclear power reactor pursuant to 10 CFR 50.22 are l required to establish an access authorization program consisting of a background investigation, psychological assessment, and behavioral observation, and to submit the program to NRC to be included in their physical security plan. The specific requirements are described below.

Section 73.56(a)(1). (2). and (3) requires that the licensee or applicant incorporate the access -

authorization program into its physical security plan within a year of the enactment of the rule and certify its implementation. This one-time submittal was necessary to inform NRC that the access authorization programs have been added to the physical security plans and are being implemented.'

Section 73.56(b)(1) requires that the licensee establish and maintain an access authorization

- program that provides high assurance that individuals granted unescorted access to protected

. and vital areas are trustworthy and reliable, and do not constitute an unreasonable risk to the health and safety of the public including a potential to commit radiological sabotage.

Sechon 73.56(b)(2) establishes the three elements necessary to meet the performance

objectives
a background investigation, a psychological assessment, and behavioral

' observation.

' Section 73.56(c) establishes provisions for existing, reinstated, transferred, and temporary
access authorization.

r.

Section 73.56(d) establishes the conditions under which unescorted access authorization may j be granted during cold shutdown. The licensee must incorporate measures to ensure i

11

f L functional capability of equipment into its physical security plan and submit those plan changes to NRC under 10 CFR 50.90.

Section 73.56(e) requires that licensees establish a procedure for a rey!ew process for an employee when a denial of unescorted access has an adverse effect on employment.

Section 73.56(f)(1) requires the establishment of a system of files and procedures designed to protect personalinformation.

Section 73.56ff)(2) requires licensees, contractors, and vendors to make personal information available to other requesting licensees, contractors, and vendors provided that the request is accompanied by a signed release from the individual.

Section 73.56(o)(1) requires that licensees audit their access authorization programs within 12 months of implementation of the rule and at least every 24 months thereafter to ensure that the requirements of the rule are satisfied.

Section 73.56(a)(2) requires each licensee who accepts the access authorization program of a contractor or vendor to perform an audit every 12 months to ensure that the requirements of the rule are satisfied.

Section 73.56(h)(1) requires that the licensee retain records on which unescorted access authorization is based for the duration of unescorted access authorization and 5 years following its termination, and retain records of denial for 5 years. The records are reviewed by NRC inspectors to verify that the requirements of the access authorization program are being met.

Section 73.56(h)(2) requires that licensees retain records of the results of audits, resolution of the audit findings, and corrective actions, for 3 years. The records are reviewed by NRC

. inspectors to verify that the requirements of the access authorization program are being met.

Sections 73.57(a) and (b) requires that each nuclear power plant licensee fingerprint each individual who has or will have access to Safeguards information or who will require unescorted access to the nuclear power facility.

Section 73.57(d) requires that licensees submit the fingerprint cards to NRC, which will forward them to the FBI for crimir.al history checks.

Section 73.57(e) requires that, prior to any adverse action, the licensee must make available to the individual the contents of records obtained from the FBI for the purpose of assuring correct and complete information, and must retain a record of receipt by the individual of this notification for 1 year from the date of the notification.

Section 73.57(f) requires that the licensee establish and maintain a system of files and procedures to retain and protect criminal history data and other personal information from L disclosure for one year after termination or denial of access.

l; 12

.. 4 Section 73.60(e) requires the licensee to establish, maintain, and follow an NRC approved l

. safeguards contingency plan, as outlined in Appendix C to Part 73.

Section 73.67(c)(1) requires the licensee to submit a security plan or amended security plan describing how the licensee'will comply with the physical protection requirements of the regulations; The licensee must also retain the effective security plan as a record. This information is needed to permit the NRC to determine the siequacy and completeness of the licensee's safeguards system and to provide documentation of a satisfactory safeguards system which can be inspected by NRC.

Section 73.67(d)(11) requires licensees to establish and maintain written response procedures I for dealing with thefts or threats . 'nefts of SNM of moderate strategic significance at fixed .  ;

sites. The licensee must retain a copy of the procedures as a record. The information is used  !

by the licensee to provide instructions to employees for dealing with contingencies and is '

inspected by NRC to ensure that the licensee has developed adequate procedures for dealing i with thefts or threats of thefts.

Section 73.67(e)(1) requires that a licensee shipping SNM of moderate strategic significance provide advance notification to the receiver of any planned shipments specifying the mode of j transport, estimated time of arrival, location of the nuclear material transfer point, name of the carrier, and transport identification. The licensee must also receive confirmation from the j receiver prior to commencement of the shipment that the receiver will be ready to accept the i shipment at the planned time and location and acknowledges the specified mode of transport. l This information alerts the intended receiver of an impending shipment. The required l notification and confirmation ensure that the shipper has preplanned the transportation of the j material and that the receiver is ready to accept the material. It also helps ensure positive  !

control of the material during transport and helps ensure traceability of any missing material.  !

Section 73.67(e)(3)(iv) requires that a licensee who arranges for the in-transit physical protection of SNM of moderate strategic significance, or who takes delivery of the material f.o.b.  ;

the point at which it is delivered to a carrier for transport, must establish and maintain written l response procedures for dealing with thefts or threats of thefts of the material. The licensee j must retain a copy of the procedures as a record. The information is used by the licensee to l provide instructions to employees for dealing with contingencies and is inspected by NRC to 1 ensu/e that the licensee has developed adequate procedures for dealing with thefts or threats of thefts.

' Section 73.67(e)(3)(v) requires that a licensee who arranges for the in-transit physical protection of CNM of moderate strategic significance, or who takes delivery of the material f.o.b.

the point at wnich it is delivered to a carrier for transport, must make arrangements to be  ;

notified immediately of the arrival of the shipment at its destint. tion, or of any such shipment l l that is lost or unaccounted for after the estimated time of arrival at its destination. This information is used by the licensee to determine that a shipment either arrived safely or is missing. Such notification gives the licensee a basis for initiating a trace investigation in the event a shipment becomes delayed or lost.  !

I 13 i

~

l Section 73.67(e)(3)(vii) requires that a licensee notify the NRC Operations Center within one hour after the discovery of the loss of the shipment and within one hour after recovery of or j accounting for such lost shipment, in accordance with Section 73.71. This notification permits NRC to initiate or terminate a trace investigation if necessary.

Section 73.67(e)(4) requires that a licensee who arranges for the in-transit physical protection of SNM of moderate strategic significance, or who takes delivery of the material f.o.b. the point at which it is delivered to a carrier for transport, must comply with the requirements of I

$ 73.67(e)(1), (2), (3), and (4)(i) and (ii) and retain required records for 3 years. The records are inspected by NRC in order to ensure compliance with the requirements.

Section 73.67(e)(5) requires that a licensee who exports SNM of moderate strategic significance must comply with the requirements of 9 73.67(c) and (e)(1), (3), and (4) and retain required records for 3 years. The requirement is similar to that of 9 73.67(e)(4), above, but the L shipper is exporting material. The records are inspected by NRC in order to ensure compliance ,

with the requirements. .

)

3 Section 73.67(e)(6)(i) requires that a licensee who imports SNM of moderate strategic l significance must comply with the requirements of $ 73.67(c) and (e)(2), (3), and (4) and retain l required records for 3 years. The requirement is similar to that of 5 73.67(e)(5), above, but the shipper is importing material. The records are inspected by NRC in order to ensure compliance with the requirements. 1 Section 73.67(e)(6)(ii) requires that a licensee notify the exporter who delivered the material to a carrier for transport of the arrival of such material This information is used by the licensee to j determine that a shipment either arrived safely or is missing. Such notification gives the . j j licensee a basis for initiating a trace investigation in the event a shipment becomes delayed or lost.

Section 73.67(e)(7)(i) requires that, upon request by NRC, a shipper provide additional i information regarding a planned shipment. This information, if requested, is used by NRC to 1 determine whether it is necessary to issue orders to licensees in the event that it appears to .

j NRC that two or more shipments of SNM of moderate strategic significance, constituting in the aggregate an amount equal to or greater than a formula quantity of SSNM, may be enroute at  ;

the same time. .

Section 73.67(e)(7)(ii) requires that the receiver, or the shipper if the receiver is not a licensee, .

l. notify the NRC Regional Office by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the arrival of the shipment at )
l. its final destination, or after the shipment has left the United States as an export. This I

( notification permits NRC to confirm the integrity of the shipment at the time of receipt or exit from the United States.

Section 73.67(f)(4) requires that a licensee who possesses or uses SNM of low strategic significance at fixed sites, except nuclear power reactor licensees, must establish and maintain l written response procedures for dealing with thefts or threats of thefts of the material.. The licensea must retain a copy of the procedures as a record. The information is used by the licensee to provide instructions to employees for dealing with contingencies and is inspected by 14 L

.+ ., .

' NRC to ensure that the licensee has developed adequate procedures for dealing with thefts or threats of thefts.

Sections 73.67(a)(1) and (2) require that a licensee shipping SNM of low strategic significance provide advance. notification to the receiver of any planned shipments specifying the mode of

- transport, estimated time of arrival, location of the nuclear material transfer point, name of the carrier, and transport identification. The licensee must also receive confirmation from the receiver prior to commencement of the shipment that the receiver will be ready to accept the shipment at the planned time and location and acknowledges the specified mode of transport.

The receiving licensee must notify the shipper of the receipt of the material in accordance with 9 70.54. The required notifications and confirmation ensure that the shipper has preplanned the transportation of the material and that the receiver is ready to accept the material, it also helps ensure positive control of the material during transport and helps ensure traceability of any missing material.

Section 73.67(a)(3){i) requires that a licensee shipoing SNM of low strategic significance must establish and maintain written response procedures for dealing with thefts or threats of thefts of the material. The licensee must retain a copy of the procedures as a record. The information is used by the licensee to provide instructions to employees for dealing with contingencies and is inspected by NRC to ensure that the licensee has developed adequate procedures for dealing with thefts or threats of thefts.

Section 73.67(a)(3)(ii) requires that a shipper of SNM of low strategic significance must make arrangements to be notified immediately of the arrival of the shipment at its destination, or of any such shipment that is lost or unaccounted for after the estimated time of arrival at its destination. This information is used by the licensee to determine that a shipment either arrived safely or is missing. Such notification gives the licensee a basis for initiating a trace

. investigation in the event a shipment becomes delayed or lost.

Section 73.67(g)(3)(iii) requires that a licensee notify the NRC Operations Center within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after the discovery of the loss of the shipment and within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after recovery of or accounting for such lost shipment, in accordance with 9 73.71. This notification permits NRC to initiate or terminate a trace investigation if necessary.

Section 73.67(g)(4) requires that a licensee who exports SNM of low strategic significance' must comply with the requirements of $ 73.67(c) and (g)(1), and (3) and retain required records for 3 years. The records are inspected by NRC in order to ensure compliance with the

. requirements.

Section 73.67(a)(5)(i) requires that a licensee who imports SNM of low strategic significance must comply with the requirements of 6 73.67(c) and (g)(2), and (3) and retain required records for 3 years. The requirement is similar to that of 6 73.67(g)(4), above, but the shipper is exporting material. The records are inspected by NRC in order to ensure compliance with the requirements.

. 1 Section 73.67(a)(5)(ii) requires that a licensee notify the person who delivered the material to a carrier for transport of the arrival of such material. This information is used by the licensee to 15

..- c .

determine that a shipment either arrived safely or is missing. Such notification gives the licensee a basis for initiating a trace investigation in the event a shipment becomes delayed or lost.

Section 73.70(a) requires that the licensee keep a record of the names and addresses of all authorized individuals. This information serves as a means of identifying those who have

. responsibility for surveillance of SNM, and of limiting the number of individuals with such

responsibility. It identifies persons who had access in the event an investigation proves L necessary and serves as a means of verification for inspection purposes to ensure that I

designation and access control procedures are being properly conducted.

Section 73.70(b) requires that the licensee keep a record of the names, addresses, and badge numbers of all individuals authorized to have access to vital equipment or SNM, and the vital areas and material access areas to which authorization is granted. This record provides formal access authorization control. It provides verification that access control requirements are being met and serves to limit the number of individuals with such access.

Section 73.70(c) requires that the licensee keep a register of visitors, vendors, and other individuals not employed by the licensee pursuant to 99 73.46(d)(1),73.55(d)(6), or 73.60. The register serves as a record of visitors permitted access, serves as an inspectable document to verify that access control requirements are being followed, and facilitates any subsequent investigation of irregular events.

Section 73.70(d) requires that the licensee keep a log of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.;This record provides a means of determining who had access to vital areas. It is inspected to assess licensee '

performance in minimizing unnecessary access. It also can provide data to aid an investigation of an irregular event.

Section 73.70(e) requires that the licensee keep documentation of all routine security tours and -

inspections, and of all tests, inspections, and maintenance performed on physical barriers, intrusion alarms, communications equipment, and other security related equipment. This requirement provides a record of security tours, tests and maintenance and is used to ensure that the frequency of tests and prompt maintenance of failures is verifiable by inspection._ lt also provides a maintenance history of equipment usefulin evaluating operating performance.

Section 73.70(f) requires that the licensee keep a record at each onsite alarm annunciation location of each alarm, false alarm, alarm check, and tamper indication. In addition, details of response by facility guards and watchmen to each alarm, intrusion, or other security incident must be recorded. This record provides verification that alarms are operating properly, that licensees respond properly, and that operational checks are conducted in accordance with the regulations. It also provides a means of evaluating the long term reliability of the alarm system. ,

Section 73.70(o) requires that the licensee keep a record of shipments of SNM subject to the requirements of Part 73, including names of carriers, major roads to be used, flight numbers for air shipments, dates and expected times of departure and arrival of shipments, verification of communications equipment on board the transfer vehicle, names of individuals who are to 16

_ _ - _ _ _ __ - _ _ _ - ._ -- _ _ - - _ _ _ _ _ __ _a

i',< ., .

l l

communicate with the transport vehicle, container seal descriptions and identification, and other  !

details to confirm compliance with protection requirements. Information obtained during the course of the shipment such as reports of all communications, change of shipping plan,

!- including monitor changes, trace investigations, and others, must also be recorded. These j l' records serve as a part of the material control system by providing a record of bulk inventory j change at any given plant. They also provide an audit trail and experience base for evaluating the transportation process at a later time.

Section 73.70(h) requires that the licensee maintain written procedures for controlling access to protected areas and for controlling access to keys for locks used to protect SNM. This record

, serves to aid access control and lock and key control. It also serves as an inspectable record of the licensee's performance in minimizing access and providing adequate control of key and lock operations.

Section 73.71(a)(1) requires that each licensee subject to the provisions of $$ 73.25,73.26, 73.27(c), 73.37, 73.67(e), or 73.67(g) notify the NRC Operations Center within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after the discovery of the loss of any shipment of SNM or spent fuel and within one 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after recovery of or accounting for such lost shipment. This notification permits NRC to initiate or terminate a I trace investigation if necessary. I Section 73.71(a)(4) requires that each such licensee follow the initial telephonic notification with a written report to NRC within 30 days. This report permits NRC to analyze and evaluate the ,

event and subsequent recovery efforts.  !

I Section 73.71(a)(5) requires that each such licensee follow the initial telephonic notification and written report with a followup telephonic notification and written report to NRC if any significant  ;

supplemental information is discovered or if corrections to previous reports are necessary. j

. Copies of the written reports must be retained as a record for 3 years. i Section 73.71(b) requires that each licensee subject to the provisions of 99 73.20,73.37,73.50, 73.55, 73.60, or 73.67 notify the NRC Operations Center within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after the discovery of the  ;

theft or attempted theft or unlawful diversion of SNM. Each licensee subject to the provisions of ' )

$$ 73.20,73.37,73.50,73.55,73.60, or possessing SSNM and subject to 9 73.67(d) must notify the NRC Operations Center within one hour after the discovery of the following: an event involving actual or attempted significant physical damage to a power reactor or any facility possessing SSNM or its equipment or carrier equipment transporting nuclear fuel or spent  !

nuclear fuel, or to the nuclear fuel or spent nuclear fuel a facility or carrier possesses; an event i involving actual or attempted interruption of normal operation of a licensed nuclear power -

reactor through the unauthorized use of or tampering with its machinery, components, or -

controls including the security system; an actual entry of an unauthorized person into a protected area, material access area, controlled access area, vital area, or transport; or an

. event involving any failure,~ degradation, or the discovered vulnerability in a safeguard system 4 that could allow unauthorized or undetected access to one of the above areas for which j l compensatory measures have not been employed. Each licensee subject to the provisions of l

$9 73.20,73.37,73.50,73.55, or 73.60, must notify the NRC Operations Center within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

. after the discovery of an event involving actual or attempted introduction of contraband into one of the above areas. The Commission requires the reports made pursuant to 9 73.71 so that the 17

l l

1 Commission may be aware of events in order to determine their significance, whether a change in a licensee's safeguards plan is needed, and whether a report to Congress is necessary in l accordance with Section 208 of the Energy Reorganization Act of 1974, as amended. The )j safeguards event reports are also needed for the development of a database whereby generic problems can be identified and feedback given to licensees for improving their safeguards system.

1 Section 73.71(c) requires that each licensee subject to the provisions of $$ 73.20,73.37,73.50, I 73.55, 73.60, or possessing SSNM and subject to S 73.67(d) must maintain a current log and j record the safeguards events described in paragraphs ll(a) and (b) of Appendix G to Part 73 1 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery by a licensee employee or member of the licensee's contract security organization. '

Section 73.71(d) provides guidance for the submission of 30-day reports required under the j forgoing provisions of 9 73.71. It provides that power reactor licensees should submit the

]

written report using NRC Form 366, " Licensee Event Report." Other licensees must submit the J written report in letter format. NRC Form 366 has previously been cleared under OMB No. )

3150-0104, which should be referred to for additional supporting information, burden and cost l data.

Section 73.71(e) provides that duplicate reports are not required for events that are reportable in accordance with SS 50.72 and 50.73.

i it is necessary for both the licensee and the NRC to maintain copies of the reports for the l following reasons. The licensee must maintain copies to perform the yearly security audit

]

required by 9 73.46(g)(6) for fuel facilities and @ 73.55(g)(4) for power reactors. This audit i evaluates the effectiveness of the security system at these facilities. Also, in order to maintain {'

the level of security deemed adequate by NRC, the licensee must observe and analyze the operational aspects of its security system. This can only be done through the maintenance and analysis of such records as those for security events. The NRC maintains copies of security event records to conduct analyses to identify and characterize generic and facility-specific precursors to certain safeguards events. Improving the ability of the NRC to identify generic  ;

precursors or defects provides the agency with a capability to initiate corrective action, if j needed, prior to a vulnerability having a detrimental effect on public health and safety. l l

Section 73.72 requires that licensees shipping a formula quantity of SSNM, SNM of moderate I strategic significance, or irradiated reactor fuel required to be protected pursuant to S 73.37, must provide advance written notification to NRC at least 10 days prior to shipment, along with shipment details and itinerary, and must notify NRC by telephone of the transmittal of the i advance notice and of any changes to the shipment itinerary. This requirement is necessary to I allow NRC to review shipment details and schedule appropriate monitoring of the shipment. It )

also serves as a means to verify shipment details during the inspection process.

Section 73.73 requires that licensees exporting SNM of low strategic significance must provide advance written notification to NRC at least 10 days prior to shipment, along with shipment details and itinerary, and may notify NRC by telephone of any changes to the shipment details or itinerary. This requirement is necessary to allow NRC to review shipment details and I 18 I

l

! l L___________-- - - - - -J

l schedule appropriate monitoring of the shipment. It also serves as a means to verify shipment details during the inspection process.

Section 73.74 requires that licensees importing SNM of low strategic significance from a 4 country not a party to the Convention on the Physical Protection of Nuclear Material must l' provide advance written notification to NRC at least 10 days prior to_ shipment, along with shipment details and itinerary, and may notify NRC by telephone of any changes to the shipment details or itinerary. This requirement is necessary to allow NRC to review shipment details and schedule appropriate monitoring' of the shipment. It also sentes as a means to verify shipment details during the inspection process.

Appendix B sets the minimum criteria for security personnel.  !

Anoendix B Section 1.C. requires the licensee to document and maintain for 3 years a record of the physical qualification of each guard, armed response person, armed escort, and other security force members.

Anoendix B Section I.E. requires the licensee to document and maintain a record for 3 years of the physical requalification of each central alarm station operator, guard, armed response .

personnel, and armed escort. l Anoendix B Section 1.F. requires the licensee to document and maintain a record for 3 years of l the results of suitability, physical and mental qualifications data and test results.

Anoendix B Section ll.A. requires the licensee to maintain documentation of the current training  !

and qualifications plan as a record for 3 years after possession of the material. )

Anoendix B Section ll.B. requires the licensee to document and maintain a record of the results of qualifications of each individual in a security-related job for 3 years after the employment ends or 3 years after possession of the material.

Anoendix B Section ll.C. requires the licensee to document and maintain a record of the results

of qualifications of contract personnel in security-related duties for 3 years after the j employment ends or 3 years after possession of the material.

Aooendix B Section ll.E. requires the licensee to document and maintain a record of the results ,

l of annual requalification of security personnel in security-related duties for both normal and contingency operations for 3 years after the requalification.

Anoendix B Sectign.N requires the licensee to document and maintain a record of the results of

~ qualification and annual requalification of security personnelin weapons firing for 3 years after  !

the qualification or requalification.

The requirements of Appendix B serve as a basis to assure licensee adequacy in security force

- training and qualification and also serve as an inspection referer 2 in verifying licensee performance.

4 19

_ _ _ ~ . . _ . . - __. _ . _ _ _ _ - . .-. . _ . ~ . _ _ _ . _ _ ~ _ . _ _ _ _ _ _ _ _ _ _ ~ _ _ _ _ _ ~ - - _ . - _ - - - _ _ _ - - _ _ - . . - _ - -

__.______n_-_ ._--___-_---_-_______

~~ - ~- - ~ ~ - - -- - -

4 Aopendix C sets the minimum requirements for licensee safeguards contingency plans. The -

safeguards contingency plan must include plans for dealing with threats, thefts, and radiological sabotage. Each licensee safeguards contingency plan must contain five categories of information,'as listed below. The licensee must submit to the NRC for approval the first four categories of information contained in the plan-Background, Generic Planning Base, Licensee 4 Planning Base, and Responsibility Matrix. The fifth category, Procedures, does not have to be submitted for approval. This document serves as a written record for the licensee, setting forth '

plans for dealing with contingencies. The plan is used by NRC in the licensing approval process to ensure that there is sufficient scope and depth in the contingency planning area and L also serves as a compliance benchmark during the inspection process.

Licensees must provide for the implementation, revision and maintenance of the safeguards contingency plan. To this end, licensees must provide for an annual independent review and audit of the plan, procedures and practices. The results must be documented, reported to the

- licensee's management, and kept available at the plant for inspection for 3 years. This.

requirement is needed to ensure that the licensee's contingency plans are up to date and effective.' The plan is required to be retained as a record until termination of the license, and superseded material is required to be retained for 3 years after the change is made.

1. Background.- This category of information must identify and define the perceived dangers and incidents with which the plan will deal and the general way it will handle them.
2. Generic Planning Base. This category of information must define the criteria for initiation and termination of responses to safeguards contingencies together with the specific decisions, actions, and supporting information needed to bring about such responses.

-3. Licensee Planning Base. This category of information must include the factors affecting contingency planning that are specific for each facility or means of

. transportation. To the extent that the topics are treated in adequate detail in the licensee's approved physical security plan, they may be incorporated by cross--

reference to that plan.

4. Responsibility Matrix. This category of information consists of detailed identification of the organizational entities responsible for each decision and action associated with specific responses to safeguards contingencies.
5. Procedures. This category of information must detail the actions to be taken and decisions to be made by each triember or unit of the organization as planned in the Responsibility Matrix. The procedures entail operating details subject to frequent change. They need not be submitted to NRC for approval, but will be inspected by NRC staff on a periodic basis.

- Anoendix Giprovides clarification of the requirements for reporting safeguards events. .! '

Safeguards experience is a vehicle for providing licensees with feedback about the

. effectiveness of safeguards systems. Some safeguards events require immediate response by 20  ;

i

. . o

'the NRC.~ Under 6 73.71, these events are required to be reported within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of detection of their occurrence to assure timely response by NRC regional and headquarters staff. Other safeguards events, while of less significance, must be reported in order to determine trends in deficiencies in safeguards systems. NRC has established a program for the collection and analysis of all pertinent safeguards data. This data is immediately entered into the NRC data base and analysis is begun as soon as the data is entered. Upon completion of the analysis, appropriate action and response are initiated. In order to achieve program objectives, a standardized level of detailis required for the evaluation of safeguards events. The results of the analyses are used to improve regulations for these facilities, for preparing for inspections, and to give feedback to licensees for improving their safeguards systems.

2. Agency use of the Information

. The information included in the applications, reports and records is reviewed by the NRC staff to assess the adequacy of the applicant's physical plant, equipment, organization, training, experience, procedures and plans for protection of public health and safety and the common defense and security. The NRC review and the findings therefrom form the basis for NRC licensing decisions related to special nuclear material.

3. Reduction of Burden Throuah Information Technoloav There are no legal obstacles'to reducing the burden associated with this information collection.

Applicants and licensees may use electronic information processing systems to prepare and submit required information. Approximately 2 percent of the responses are filed electronically.

4. Effort to identify Duplication and Use Similar Information The Information Requirements Control Automated System (IRCAS) was searched to determine .

duplication. None was found. There is no similar information available to the NRC.

' 5. Effort to Reduce Small Business Burden Some of the licensees who use special nuclear material are small businesses. Since the consequences to the common defense and security or to the health and safety of the public of inadequate safeguards for special nuclear material are the same for large and small entities, it

- is not possible to reduce the burden on small businesses by less frequent or less complete reports, records, plans and procedures.

6. Consequences to Federal Proaram or Poliev Activities if the Collection is Not

~

Conducted or is Conducted Less Freauentiv

-If the information collection was not conducted or was conducted less frequently, the NRC would be precluded from being notified in time to provide rapid response and quick assistance L in achieving timely resolution of safeguards events. Reports are submitted and evaluated as

! - events occur. Applications for new licenses and amendments may be submitted at any time.

I. License renewal of fuel cycle facility licenses can be for terms up to 10 years.11nformation -

submitted in previous applications may be referenced without being resubmitted.

l.

21

~

-6

7. Circumstances Which Justifv Variation from OMB Guidelines Certain sections of Part 73 vary from the OMB Guidelines in 5 CFR 1320.5(d) by requiring that licensees submit reports to the NRC in less than 30 days.' Sections 73.26,73.27,73.37,73.67, and 73.71 require immediate notifications to response forces, NRC and local law enforcement l - authorities, communications between convoys and movement control centers, and immediate l notifications of consignees and shippers. These notification requirements are needed to permit response forces, NRC, law enforcement authorities, shippers and consignees to confirm the integrity of shipments or to determine whether there has been a loss or diversion of special l nuclear material and to initiate prompt action for recovery of such material.

l Certain other sections of Part 73 vary from the OMB Guidelines in 5 CFR 1320.5(d) by requiring that licensees retain records for more than 3 years. Various sections require retention of 1 records for 5 years, or for extended periods such as duration of possession of the material, '

duration of employment, or 5 years after termination of access authorization. These require-ments are necessary to ensure that procedures for handling and safeguarding nuclear materials ,

are available throughout the period in which the licensee possesses the material or operates the facility. Other records are required for inspection or for reconstruction of events in the event

of a safeguards incident.
8. Consultations Outside the NRC An opportunity to comment on the information collection requirements in 10 CFR Part 73 is Ming provided in the Federal Register notice published for this clearance extension.
g. mment or Gift to Respondents I

Not applicaba:.

10.- ConfidenWW of Information I

None, except for proprietary or safeguards information.

f. 11. Justification for Sensitive Questions None.

ll I

L 1

22 i i

C___-__-_______________-__ _ - _ . _ _ .

12. Estimated Burden and Burden Hour Cost l

The estimated annual cost to licensees to respond to the collection requirements is

$51,325,250 (410,602 hrs x $125/hr).

Reoortino Requirements Licensee Total No. of Licensee Staff Hours Annual Section Resoonses Annually Per Submittal Burden 73.5 1 8 8 73.20(c) One-time-only requirement, which has been completed 73.26(b)(3) 0 5 0 73.26(i)(6) and (k)(4) 0 1 0 73.27(a)(1) 0 0.1 0 73.27(a)(2) 0 0.5 0 73.27(a)(3) 0 0.5 0 73.27(b) 0 0.5 0 73.27(c) included in 73.71(a)(4) 73.37(a) 0 0.1 0 73.37(b)(1) Included in 73.72 73.37(b)(11) 40 0.3 12 73.37(f) 42 8 336 73.46(b)(9) 2 1 2 73.46(h)(4) 0 0.1 0 73.46(h)(5) One-timc-only requirement, which has been completed 73.46(i)(1) 2 53.6 107.2 73.50(g)(3) 0 0.1 0 *

  • Emergency notification. Has never been used.

23

Reoortina Requirements (cont'd)

Licensee Total No. of L!censee Staff Hours Annual Section Resoonses Annuallv Per Submittal Burden

' 73.50(g)(4) One-time-only requirement, which has been completed 73.50(h) One-time-only requirement, which has been completed 73.55- One-time-only requirement, which has been completed 73.55(b)(4)(ii) 75 16 .1,200

- 73.55(c)(8)(i)&(ii) Burden included in 73.55(c)(9) 73.55 (c)(9) 40 20 800 20 20 400 7 20 140 73.55(d) One-time-only requirement, which has been completed 73.55(h)(4) 75 0.25 18.5 73.55(h)(5) 6,930 1 6,930 73.56(a)(1) . One-time-only requirement, which has been completed 73.56(a)(2),(3) ' None until advanced reactors start application process 73.56(b)(1),(2) included in 73.56(a)(1), (2), & (3) .

~ 73.56(c) _ included in 73.56(a)(1), (2), & (3)

' 73.56(d) 0 89 0 No submittals are anticipated during clearance period

. 73.56(e) - included in 73.56(a)(1), (2), & (3) 73.57(a)-(e) 60,000 0.5 30,000 i

73.67(c)(1) One-time-only requirement, which has been completed

-24 1

I l

E .. .. .

Reporting Requirements (cont'd)

Licensee Total No. of Licensee Staff Hours Annual Section Resoonses Annually - Per Submi.ttal - Burden

. 73.67(e)(1) ~370 2 740

. 73.67(e)(3)(v)' 370 0.5 185 73.67(e)(3)(vii)' included in 73.71(a) 73.67(e)(6)(ii) - 0 0.5 0

.73.67(e)(7)(i) 0 2 0 73.67(e)(7)(ii) 22 10 .220 73.67(g)(1),(2) 70 4 280 73.67(g)(3)(ii) 70 1 70 73.67(g)(3)(iii) included in 73.71(a) 73.67(g)(5)(ii) 35 1 35-73.71(a)(1) 0 1.5 0

73.71(a)(4) & (5) 0 40 0 73.71(b) 40 6 240 73.71(d) Included in 73.71(b)

'73.72 30 0.2 . 6 73.73 90- 8 720 73.74 28 8 224 l q Appendix B Included in previous sections Appendix C - included in previous sections Appendix G Included in previous sections Total: 68,643 43,241.70 '

25' l'

O. .

=

l

-e Recordkeeoina Requirements Record No. of Retention Records Annually Hours / Record Total Burden Period (vears)*

73.20(c) 2 100 200 L l

73.24(b)(1) 270 0.2 54 3 l 73.25(b),(c),(d) included in 73.26 P+3 73.26(b)(4) 0 1 0 S+3 73.26(c) 0 8 0 P+3 73.26(d)(3) 0 1.5 0 P+3 i

73.26(d)(4) 0 40 0 E,Q,R+3 73.26(e)(1) 0 100 0 P+3 I

73.26(h)(6) 0 5 0 3 l

73.26(i)(1) 0 18 0 S 1

73.37(b)(2) 40 0.3 12 P+3 73.37(b)(3) 40 0.2 8 P+3 73.37(b)(5) 40. 0.2 8 S+3 73.37(b)(7) Included in 73.72

)

.73.45' inclJded in 73.20 P 73.46(b)(1) One-time-only requirement, which has been completed L 73.46(b)(3) 2 160 320 L

. P = Duration of Possession of Material C = Duration of Contract L = Duration of License Q = Qualification

). E = Duration of Employment R = Requalification

. S = Duration of Shipment A = Duration of Access Auth.

26 L.a

Recordkeeping Requirements (cont'd)

Record No. of _ Retention Records Annually Hours / Record Total Burden Period (vearsP 73.46(b)(4),(7),(8) . 2 32.8 65.8 Q/R+3 L 73.46(b)(9) 2 1 2 3 73.46(b)(10)(iii) 2 8 16 3 l 73.46(b)(11)(i) included in 73.46(b)(4) 1 73.46(b)(11)(iii) 2 8 16 3 73.46(b)(12) & (b)(12)(i) included in 73.46(i) 73.46(b)(12)(ii) 2 8 10 3 l

' 73.46(d)(3) included in 73.20 L 73.46(d)(10) 255 0.5 127.5 3 73.46(d)(11) 170. 0.5 85 3~ j 73.46(d)(13) 1,020 0.1 102 3 73.46(g)(5) included in 73.20 P 73.46(g)(6) 2 8 16 3 73.46(h)(1) 15 10 150 L 73.46(h)(2) 2 0.5 1 L j i

73.46(h)(3) included in 73.20 L 73.50(a)(3) 3 100 300 L 73.50(a)(4) 3 16 48 Q/R+3 -

l 73.50(c)(5) 600 0.2 120 3 73.50(g)(1) 3 100 300 L 73.50(g)(2) 3 0.5 1.5 L 27 I

i L_______.______.____________ _ . _ _ ]

=

t .

Recordkeeoino Requirements (cont'd)

Record No. of Retention Records Anagally Hours / Record Total Burden Period (vears)*

73.55(b)(1) 75- 10 750 C 73.55(b)(3) 75 1 75 L/3 73.55(b)(4)(i)' 6,000 0.5 3,000 O/R+3 73.55(b)(4)(ii) 75 1 75 U3 73.55(c)(7) Included in 73.55(c)(8) 73.55(c)(8) 40 340 13,600 3 20 380 7 7 480 3,360 73.55(c)(9)(iv) 40 20 800 3 20 380 7,60 7 20 140 73.f5(c)(10) 40- 80 3,200 3 20 80 1,600 j 7 180 1,260 73.55(d)(6) 25,000 0.5 12,500 3 l 73.55(d)(7) 924 4 3,696 L 73.55(g)(1)&(4) 27,104 4 108,416 L-73.55(g)(4) 75 8 600 5 73.55(h)(1) 75 10 750 L 73.55(h)(2) 75 1 75 L 73.56(b)(1) 75 5 375 L 73.56(f)(1),(2) Included in 73.56(h)(1) A+5 73.56(g)(1),(2) included in 73.50. 3 f 73.56(h)(1)

L 28 J

i k-_- - - - - - - _ - - _ - _ _ . _ ._ - - _ - . _ . . - _ _ _ - . _ _ _ _ . - - - - - . . . _ . . - - . _ . _ . . . _ - - _ . _ - - - . _ . _ _ _ _ . . _ _ - - - - - _ - - - _ - . _ . . - - - - - - - _ . . . . . - . - - - - _ . . - _ . _ . . _ _ _

l

(

Recordkeeping Requirements (cont'd)

. Record No. of _

Retention Records Annually Hours / Record Total Burden Period (veamY Credit checks 146,400 0.22 32,208 A+5 Military checks 14,640 0.56 8,198 A+5 Education . 61,000 0.56 34,160 A+5 records check Psychological 61,000 0.22 13,420 A+5 evaluation Transfer 3,660 3 10,980 A+5 Appeal reviews 366 49 17,934 5 73.56(h)(2) Included in 73.50 3 73.57(e),(f) 60,000 0.25 15,000 A 73.60(e) included in Appendix C L 73.67(c)(1) 0 20 0 P+3 173.67(d)(11) 0 20 0 P+3 73.67(e)(3)(iv) 50 1 50 P+3 73.67(e)(4) 296 1.5 444 P+3 73.67(e)(5) 185 2 370 P+3 73.67(e)(6)(i) 70 4 280 P+3

- 73.67(f)(4) One-time-only requirement, which has been completed P+3 73.67(g)(3)(i) 70 2 140 P+3 73.67(g)(4) 56 1.5 84 P+3 73.67(g)(5)(i) 35 1 35 P+3 73.70(a) 280 0.5 140 P+3 29 u__1____i________-._________ ________.__________________________________________-..__________-______________-__________.____.______________i

Recordkeeoina Requirements (cont'd)

Record No. of Retention Records Annually Hours / Record Total Burden Period (vearsP 73.70(b) 400 0.5 200 P+3 73.70(c) 1,500 0.2 300 3 73.70(d) 56,700 0.03 1,701 3 73.70(e) 2,520 0.5 1,260 3 73.70(f) 766,500 0.02 15,330 3 73.70(g) 40 2 80 3 i 73.70(h) 84 24 2,016 U3 73.71(a)(4),(5) 0 1 0 3 73.71(c) 33,989 1 33,989 3 73.71(e) included in 73.46(g)(4)&(g)(6)

Appendix B Included in above requirements 3/L ,

' Appendix C 76 100 7,600 U3 l Number of Recordkeepers: 7,300 l

Total Recordkeeping Burden: 367,359.80  ;

)

TOTAL ANNUAL BURDEN HOURS FOR PART 73: 41DJD2 l

l P = Duration of Possession of Material C = Duration of Contract i L = Duration of License Q = Qualification E = Duration of Employment R = Requalification l

[

S = Duration of Shipment A = Duration of Access Auth. i 30

-- _ _ _ _ _ _ _ . . _ . _ _ _ _ _ _ _ _ . . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____Q

. +

l 71 ' r -

l i l (13. Estimate of Other Additional Costs None. .,

14. Eatimated Annuahzed Cost to Federal Government The estimated cost to the government for review of required reports and records is approximately

' $562,500 (4,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> at $125/hr) and is based on the materials fee recovery rate. The cost is fully

!- recovered by license fee assessments to NRC licensees pursuant to 10 CFR Parts 170 and/or 171.

15. ' Reason for Channe in Burden or Coat There is a small burden increase based on experience with requirements for physical protect #on at licensed facilities. There is also a small change in cost due to a change in the hourly charge rate.
16. Publication for Statistical Use
- -None.

' 17. Reasons for Not Disolavina the Exoiration Date The requirements are contained in a regulation. Amending the Code of Federal Regulations to display information that, in an annual publication, could become obsolete would be unduly burdensome and

- too difficult to keep current.

- 18. Excentions to the Certification Statement None.

B.. COLLECTIONS OF INFORMATION EMPLOYING STATISTICAL METHODS

'.Not applicable.- ,

l l

1 l

I I

-l l

}' 31 E 1------------_ =___------- - _-----___ _ - - - - - - - - - -

. . . . , e i3

[7590-01-P]

U. S. NUCLEAR REGULATORY COMMISSION l

Agency Information Collection Activities: Proposed Collection; Comment request AGENCY: ' U. S. Nuclear Regulatory Commission (NRC) t ACTION: Notice of pending NRC action to submit an information collection request to OMB and solicitation of public comment.

SUMMARY

The NRC is preparing a submittal to OMB for review of continued approval of information collections under the provisions of the Paperwork Reduction Act of.

1995 (44 U.S.C. Chapter 35).

Information pertaining to the requirement to be submitted
,
1. The title of t!.. information collection:

10 CFR Part 73 - Physical Protection of Plants and Materials

2. Current OMB approval number: 3150-0002 -

l

' 3. How often the collection is _ required: On occasion. Required reports are submitted and evaluated as events occur.

l

l. . .

/ & l

  • ~ , ; e.

j

4. Who is required or asked to report: Persons who possess, use, import, f export, transport, or deliver to a carrier for transport, special nuclear l material

! 5. The number of annual responses: 68,643

6. The number of hours needed annually to complete the requirement or request: The industry total burden is 410,602 hours0.00697 days <br />0.167 hours <br />9.953704e-4 weeks <br />2.29061e-4 months <br /> annually (43,2412 hours0.0279 days <br />0.67 hours <br />0.00399 weeks <br />9.17766e-4 months <br /> for reporting and 367,359.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for recordkeeping).
7. Abstract: NRC regulations in 10 CFR Part 73 prescribe requirements for establishment and maintenance of a physical protection system with capabilities for protection of special nuclear material at fixed sites and in transit and of plants in which special nuclear materialis used. The information in the reports and records is used by the NRC staff to ensure that the health and safety of the public is protected and that licensee possession and use of special nuclear material is in compliance with license and regulatory requirements.

Submit, by (insert date 60 days after publication in the Federal Reaister), comments that address the following questions:

1

1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?  !

l 2

a s ,, o O

2. Is the burden estimate accurate?
3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?
4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology?

A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room,2120 L Street, NW (lower level), Washington, DC. OMB clearance requests are available at the NRC worldwide web site (http://www.nrc. gov) under the FedWorld collection link on the home page tool bar. The document will be available on the NRC home page site for 60 days after the signature date of this notice.

3

'.
  • e a ,

P l

Comments and questions about the information collection requirements may be directed to the i l l NRC Clearance Officer, Brenda Jo. Shelton, U.S. Nuclear Regulatory Commission, T-6 F33, I

. Washington, DC,20555-0001, or by telephone at 301-415-7233, or by Intemet electronic mail at BJSi@NRC. GOV.

Dated at Rockville, Maryland, this d4" day of & m/ 1998.  !

//

For the Nuclear Regulatory Commission.

A u //a- r /n-fBrend'a Jo. Shelt6n, NRC41earance Officer Office of the Chief Information Officer 4

l l

e____-